Research on The Current Flow Mechanism of Press-Pack IGBT under Short Circuit Condition in VSC-HVDC System

Author(s):  
Zhen Wang ◽  
Han Li ◽  
Chao-qun Wan ◽  
HaiHui Luo ◽  
YaDong Ren ◽  
...  
Author(s):  
Binh Nguyen

Abstract For those attempting fault isolation on computer motherboard power-ground short issues, the optimal technique should utilize existing test equipment available in the debug facility, requiring no specialty equipment as well as needing a minimum of training to use effectively. The test apparatus should be both easy to set up and easy to use. This article describes the signal injection and oscilloscope technique which meets the above requirements. The signal injection and oscilloscope technique is based on the application of Ohm's law in a short-circuit condition. Two experiments were conducted to prove the effectiveness of these techniques. Both experiments simulate a short-circuit condition on the VCC3 power rail of a good working PC motherboard and then apply the signal injection and oscilloscope technique to localize the short. The technique described is a simple, low cost and non-destructive method that helps to find the location of the power-ground short quickly and effectively.


Energies ◽  
2021 ◽  
Vol 14 (9) ◽  
pp. 2427
Author(s):  
Michał Szulborski ◽  
Sebastian Łapczyński ◽  
Łukasz Kolimas

The manuscript presents advanced coupled analysis: Maxwell 3D, Transient Thermal and Fluent CFD, at the time of a rated current occurring on the main busbars in the low-voltage switchgear. The simulations were procured in order to aid the design process of such enclosures. The analysis presented the rated current flow in the switchgear busbars, which allowed determining their temperature values. The main assumption of the simulation was measurements of temperature rise during rated current conditions. Simulating such conditions is a valuable asset in order to design better solutions for energy distribution gear. The simulation model was a precise representation of the actual prototype of the switchgear. Simulations results were validated by experimental research. The heat dissipation in busbars and switchgear housing through air convection was presented. The temperature distribution for the insulators in the rail bridge made of fireproof material was considered: halogen-free polyester. The results obtained during the simulation allowed for a detailed analysis of switchgear design and proper conclusions in practical and theoretical aspects. That helped in introducing structural changes in the prepared prototype of the switchgear at the design and construction stages. Deep analysis of the simulation results allowed for the development concerning the final prototype of the switchgear, which could be subjected to the full type tests. Additionally, short-circuit current simulations were procured and presented.


2015 ◽  
Vol 821-823 ◽  
pp. 810-813 ◽  
Author(s):  
Maxime Berthou ◽  
Dominique Planson ◽  
Dominique Tournier

With the commercial availability of SiC power transistors, this decade will mark an important breakthrough in power transistor technology. However, in power electronic systems, disturbances may place them in short-circuit condition and little knowledge exist about their SC capability. This paper presents our study of SiC MOSFETs, JFETs and BJT under capacitive load short-circuit up to 600V.


Author(s):  
Antonio R. M. Sousa ◽  
Wellington Da S. Fonseca ◽  
Marcus V. A. Nunes ◽  
Ramon C. F. Araujo ◽  
Diorge de S. Lima

Author(s):  
Kim Hung Le ◽  
Ngoc Thien Nam Tran ◽  
Viet Tri Nguyen ◽  
The Khanh Truong ◽  
Minh Quan Duong

The increasing demand for electricity along with the development of distributed generators showed that improving transmission efficiency and reliability is an indispensable requirement in the operation of the power system. Advanced technologies need to be applied to modern power systems for purposes of conveying large power flows, mitigating the risk of faults. High-voltage direct current (HVDC) transmission is now considered an effective solution for investment in large-length power lines, replacing the conventional high-voltage alternative current (HVAC) transmission system, especially in period of increasing generation capacity due to the penetration of renewable energy sources. This study assesses the performance of the HVDC system on an actual power grid based on planning and improvement demands. The calculation results of power flows, power losses and short-circuit faults were investigated using ETAP software X  


Sign in / Sign up

Export Citation Format

Share Document