Interferometric Phase Optimization Based on PolInSAR Total Power Coherency Matrix Construction and Joint Polarization-Space Nonlocal Estimation

Author(s):  
Peng Shen ◽  
Changcheng Wang ◽  
Jun Hu ◽  
Haiqiang Fu ◽  
Jianjun Zhu
2021 ◽  
Vol 13 (23) ◽  
pp. 4784
Author(s):  
Longkai Dong ◽  
Chao Wang ◽  
Yixian Tang ◽  
Hong Zhang ◽  
Lu Xu

The Coherent Pixels Technique Interferometry Synthetic Aperture Radar (CPT-InSAR) method of inverting surface deformation parameters by using high-quality measuring points possesses the flaw inducing sparse measuring points in non-urban areas. In this paper, we propose the Adaptive Coherent Distributed Pixel InSAR (ACDP-InSAR) method, which is an adaptive method used to extract Distributed Scattering Pixel (DSP) based on statistically homogeneous pixel (SHP) cluster tests and improves the phase quality of DSP through phase optimization, which cooperates with Coherent Pixel (CP) for the retrieval of ground surface deformation parameters. For a region with sparse CPs, DSPs and its SHPs are detected by double-layer windows in two steps, i.e., multilook windows and spatial filtering windows, respectively. After counting the pixel number of maximum SHP cluster (MSHPC) in the multilook window based on the Anderson–Darling (AD) test and filtering out unsuitable pixels, the candidate DSPs are selected. For the filtering window, the SHPs of MSHPC’ pixels within the new window, which is different compared with multilook windows, were detected, and the SHPs of DSPs were obtained, which were used for coherent estimation. In phase-linking, the results of Eigen decomposition-based Maximum likelihood estimator of Interferometric phase (EMI) results are used as the initial values of the phase triangle algorithm (PTA) for the purpose of phase estimation (hereafter called as PTA-EMI). The DSPs and estimated phase are then combined with CPs in order to retrievesurface deformation parameters. The method was validated by two cases. The results show that the density of measuring points increased approximately 6–10 times compared with CPT-InSAR, and the quality of the interferometric phase significantly improved after phase optimization. It was demonstrated that the method is effective in increasing measuring point density and improving phase quality, which increases significantly the detectability of the low coherence region. Compared with the Distributed Scatterer InSAR (DS-InSAR) technique, ACDP-InSAR possesses faster processing speed at the cost of resolution loss, which is crucial for Earth surface movement monitoring at large spatial scales.


2019 ◽  
Vol 1 (2) ◽  
pp. 14-19
Author(s):  
Sui Ping Lee ◽  
Yee Kit Chan ◽  
Tien Sze Lim

Accurate interpretation of interferometric image requires an extremely challenging task based on actual phase reconstruction for incomplete noise observation. In spite of the establishment of comprehensive solutions, until now, a guaranteed means of solution method is yet to exist. The initially observed interferometric image is formed by 2π-periodic phase image that wrapped within (-π, π]. Such inverse problem is further corrupted by noise distortion and leads to the degradation of interferometric image. In order to overcome this, an effective algorithm that enables noise suppression and absolute phase reconstruction of interferometric phase image is proposed. The proposed method incorporates an improved order statistical filter that is able to adjust or vary on its filtering rate by adapting to phase noise level of relevant interferometric image. Performance of proposed method is evaluated and compared with other existing phase estimation algorithms. The comparison is based on a series of computer simulated and real interferometric data images. The experiment results illustrate the effectiveness and competency of the proposed method.


2020 ◽  
Vol 79 (16) ◽  
pp. 1479-1487
Author(s):  
Samarendra Nath Sur ◽  
A. K. Singh ◽  
P. Chettri ◽  
R. Bera
Keyword(s):  
Low Cost ◽  

2006 ◽  
Vol 5 (1) ◽  
pp. 179-188
Author(s):  
Hiroaki UMEDA ◽  
Yuichi INADOMI ◽  
Hiroaki HONDA ◽  
Umpei NAGASHIMA

Author(s):  
A. D. Wara

The Government of Indonesia plans to build 9 gas power plants in South Kalimantan, South Sulawesi and Southeast Nusa Tenggara with a total power capacity of 780 MW with an estimated actual gas demand of 46.56 MMSCFD which are planned to be supplied by the Bontang terminal, DS-LNG, Masela LNG, and Tangguh LNG. LNG-C logistics optimization is needed to get the best transportation scenario regarding the eastern region which consists of scattered islands and inadequate infrastructure. This study analyzes and evaluates the best-case scenarios by comparing the time and cost variables. The process of planning the supply chain starts from determining the upstream-downstream distribution scheme and then calculates the shipping distance which results in the determination of the quantity, capacity and shipping of the LNG-C. Based on the analysis and calculation of the logistics, it is concluded that there are 3 divisions of clusters of Kalimantan-Sulawesi, NTT and NTB having estimated needs in a row of 18.06, 18.8, and 9.7 MMSCFD with the Milk-Run transportation method. Logistics optimization results show that scenario 1 has an efficiency value of 87% with an LNG-C transport capacity of 0.35 MMSCF, a roundtrip cruise time of 8.6 days and the number of shipments is 36 / year. The detailed analysis of costs in scenario A is 1-2 USD / MMBTU for the milk and run transportation method, 1.49-1.73 USD / MBTU for LNG-C transport costs, and regasification costs which are 1.0-3.7 USD / MMBTU. Based on the above results it can be calculated that the price of gas in the first year of implementation was 13.4 USD / MMBTU, so the total value below this supply chain was Rp.8,812,876,800.00. Therefore, this idea was created as a solution for the initial steps for the utilization of the domestic natural gas distribution


Author(s):  
Yu. F. Yu. F. Romaniuk ◽  
О. V. Solomchak ◽  
М. V. Hlozhyk

The issues of increasing the efficiency of electricity transmission to consumers with different nature of their load are considered. The dependence of the efficiency of the electric network of the oil field, consisting of a power line and a step-down transformer, on the total load power at various ratios between the active and reactive components of the power is analyzed, and the conditions under which the maximum transmission efficiency can be ensured are determined. It is shown by examples that the power transmission efficiency depends not only on the active load, but also largely on its reactive load. In the presence of a constant reactive load and an increase in active load, the total power increases and the power transmission efficiency decreases. In the low-load mode, the schedule for changing the power transmission efficiency approaches a parabolic form, since the influence of the active load on the amount of active power loss decreases, and their value will mainly depend on reactive load, which remains unchanged. The efficiency reaches its maximum value provided that the active and reactive components of the power are equal. In the case of a different ratio between them, the efficiency decreases. With a simultaneous increase in active and reactive loads and a constant value of the power factor, the power transmission efficiency is significantly reduced due to an increase in losses. With a constant active load and an increase in reactive load, efficiency of power transmission decreases, since with an increase in reactive load, losses of active power increase, while the active power remains unchanged. The second condition, under which the line efficiency will be maximum, is full compensation of reactive power.  Therefore, in order to increase the efficiency of power transmission, it is necessary to compensate for the reactive load, which can reduce the loss of electricity and the cost of its payment and improve the quality of electricity. Other methods are also proposed to increase the efficiency of power transmission by regulating the voltage level in the power center, reducing the equivalent resistance of the line wires, optimizing the loading of the transformers of the step-down substations and ensuring the economic modes of their operation.


2020 ◽  
Vol 71 (4) ◽  
pp. 37-45
Author(s):  
B.A. SEMENIKHIN ◽  
◽  
L.P. KUZNETSOVA ◽  
YU.A. MALNEVA ◽  
A.YU. ALTUKHOV ◽  
...  

Results of inspection and the analysis of passenger traffics on routes of the bus of Kursk are presented, the main shortcomings of the existing route network are revealed. The analysis of change of daily volume of transportations of passengers made on the basis of data of it and the previous inspections of passenger traffics and also distribution of total power of a passenger traffic on hours of day is provided. Results of development of rational route bus network of Kursk which is almost completely deprived of the shortcomings inherent in the existing route network are presented.


2019 ◽  
Vol 8 (4) ◽  
pp. 9449-9456

This paper proposes the reliability index of wind-solar hybrid power plants using the expected energy not supplied method. The location of this research is wind-solar hybrid power plants Pantai Baru, Bantul, Special Region of Yogyakarta, Indonesia. The method to determine the reliability of the power plant is the expected energy not supplied (EENS) method. This analysis used hybrid plant operational data in 2018. The results of the analysis have been done on the Pantai Baru hybrid power plant about reliability for electric power systems with EENS. The results of this study can be concluded that based on the load duration curve, loads have a load more than the operating kW of the system that is 99 kW. In contrast, the total power contained in the Pantai Baru hybrid power plant is 90 kW. This fact makes the system forced to release the load. The reliability index of the power system in the initial conditions, it produces an EENS value in 2018, resulting in a total value of 2,512% or 449 kW. The EENS value still does not meet the standards set by the National Electricity Market (NEM), which is <0.002% per year. Based on this data, it can be said that the reliability of the New Coast hybrid power generation system in 2018 is in the unreliable category.


Author(s):  
Yuliya S. Dzhos ◽  
◽  
Irina A. Men’shikova ◽  

This article presents the results of the study on spectral electroencephalogram (EEG) characteristics in 7–10-year-old children (8 girls and 22 boys) having difficulties with voluntary regulation of activity after 10 and 20 neurofeedback sessions using beta-activating training. Brain bioelectric activity was recorded in 16 standard leads using the Neuron-Spectrum-4/VPM complex. The dynamics was assessed by EEG beta and theta bands during neurofeedback. An increase in the total power of beta band oscillations was established both after 10 and after 20 sessions of EEG biofeedback in the frontal (p ≤ 0.001), left parietal (p ≤ 0.036), and temporal (p ≤ 0.003) areas of the brain. A decrease in the spectral characteristics of theta band oscillations was detected: after 10 neurofeedback sessions in the frontal (p ≤ 0.008) and temporal (p ≤ 0.006) areas of both hemispheres, as well as in the parietal area of the left hemisphere (p ≤ 0.005); after 20 sessions, in the central (p ≤ 0.004), frontal (p ≤ 0.001) and temporal (p ≤ 0.001) areas of both hemispheres, as well as in the occipital (p ≤ 0.047) and parietal (p ≤ 0.001) areas of the left hemisphere. The study into the dynamics of bioelectric activity during biofeedback using EEG parameters in 7–10-year-old children with impaired voluntary regulation of higher mental functions allowed us to prove the advisability of 20 sessions, as the increase in high-frequency activity and decrease in low-frequency activity do not stop with the 10th session. Changes in these parameters after 10 EEG biofeedback sessions are expressed mainly in the frontotemporal areas of both hemispheres, while after a course of 20 sessions, in both the frontotemporal and central parietal areas of the brain.


Sign in / Sign up

Export Citation Format

Share Document