Near-Term Objectives of the Works on the EUR Document

Author(s):  
Franc¸ois Hedin ◽  
Pierre Berbey

The EUR organization was set up in the early 90’s to produce a common specification for the next LWR nuclear power plants to be built in Europe. 18 years after its foundation, the organization is well recognized and still quite active. During the last 3 years, the EUR products have mainly been evaluations of the Gen 3 LWR designs. The evaluations of the AP1000 and of the AES92 designs have been concluded in 2007 and a revised version of the evaluation of the EPR completed in 2009. Other LWR projects of potential interest for the EUR utilities, such as MHI’s APWR, are being reviewed before starting a full-scope assessment. Last, a revision C of the EUR volume 4 has been published in 2007. Coordinated actions with the other industry groups and the other stakeholders have been a centerpiece of the recent EUR strategy. In particular, the EUR and ENISS organizations have joined their efforts in nuclear safety vs. IAEA and WENRA. Also EUR and WNA/CORDEL are now working together on harmonization of the design requirements at global level. Meanwhile, the EUR organization has kept enlarging: CEZ and MVM now are active associated members and Gen-Energija from Slovenia has been invited to participate. Education and training has been dealt with actively in 2009 and 2010. The EUR organization strongly supported WNU’s “Forum on harmonization” in 2009. A more technical course about the EUR requirements is being organized in 2010 under the aegis of ENEN. Finally, a lot of preparatory material for a revision D of the EUR volumes 1 and 2 has been gathered during the last 10 years. Several options are under consideration about how to proceed towards this revision.

2021 ◽  
Author(s):  
Le Li ◽  
Zhihui Zhang ◽  
Chao Gao ◽  
Fei Zhou ◽  
Guangqiang Ma

Abstract With the development of digital instrument and control technology for nuclear power plants in recent decades, communication networks have become an important part of safety digital control systems, which takes charge in data exchange between the various sub-systems, and extremely impact on the reliability and safety of the entire I&C system. Traditional communication systems where some special features, such as reliability, safety, real-time, certainty, and independence are not strictly required are various illustrated. However, how to implement a communication system in a safety I&C system is rarely stated in current research. In this research, a reliable safety communication system applied in nuclear power plants is designed and analyzed. The five key characteristics of nuclear safety communication networks are explained, followed by explanation of how to achieve these characteristics. The analysis and verification of the designed system are also stated in this paper, which contributes to proving that the designed nuclear safety communication system could applied in the nuclear power plants.


2021 ◽  
Vol 2021 ◽  
pp. 1-10
Author(s):  
Jinghan Zhang ◽  
Jun Zhao ◽  
Jiejuan Tong

Nuclear safety goal is the basic standard for limiting the operational risks of nuclear power plants. The statistics of societal risks are the basis for nuclear safety goals. Core damage frequency (CDF) and large early release frequency (LERF) are typical probabilistic safety goals that are used in the regulation of water-cooled reactors currently. In fact, Chinese current probabilistic safety goals refer to the Nuclear Regulatory Commission (NRC) and the International Atomic Energy Agency (IAEA), and they are not based on Chinese societal risks. And the CDF and LERF proposed for water reactor are not suitable for high-temperature gas-cooled reactors (HTGR), because the design of HTGR is very different from that of water reactor. And current nuclear safety goals are established for single reactor rather than unit or site. Therefore, in this paper, the development of the safety goal of NRC was investigated firstly; then, the societal risks in China were investigated in order to establish the correlation between the probabilistic safety goal of multimodule HTGR and Chinese societal risks. In the end, some other matters about multireactor site were discussed in detail.


2020 ◽  
Author(s):  
Evrim Oyguc ◽  
Abdul Hayır ◽  
Resat Oyguc

Increasing energy demand urge the developing countries to consider different types of energy sources. Owing the fact that the energy production capacity of renewable energy sources is lower than a nuclear power plant, developed countries like US, France, Japan, Russia and China lead to construct nuclear power plants. These countries compensate 80% of their energy need from nuclear power plants. Further, they periodically conduct tests in order to assess the safety of the existing nuclear power plants by applying impact type loads to the structures. In this study, a sample third-generation nuclear reactor building has been selected to assess its seismic behavior and to observe the crack propagations of the prestressed outer containment. First, a 3D model has been set up using ABAQUS finite element program. Afterwards, modal analysis is conducted to determine the mode shapes. Nonlinear dynamic time history analyses are then followed using an artificial strong ground motion which is compatible with the mean design spectrum of the previously selected ground motions that are scaled to Eurocode 8 Soil type B design spectrum. Results of the conducted nonlinear dynamic analyses are considered in terms of stress distributions and crack propagations.


2012 ◽  
Vol 2012 ◽  
pp. 1-9 ◽  
Author(s):  
Sandro Paci ◽  
Jean-Pierre Van Dorsselaere

The SARNET2 (severe accidents Research NETwork of Excellence) project started in April 2009 for 4 years in the 7th Framework Programme (FP7) of the European Commission (EC), following a similar first project in FP6. Forty-seven organisations from 24 countries network their capacities of research in the severe accident (SA) field inside SARNET to resolve the most important remaining uncertainties and safety issues on SA in water-cooled nuclear power plants (NPPs). The network includes a large majority of the European actors involved in SA research plus a few non-European relevant ones. The “Education and Training” programme in SARNET is a series of actions foreseen in this network for the “spreading of excellence.” It is focused on raising the competence level of Master and Ph.D. students and young researchers engaged in SA research and on organizing information/training courses for NPP staff or regulatory authorities (but also for researchers) interested in SA management procedures.


2012 ◽  
Vol 260-261 ◽  
pp. 103-106
Author(s):  
Yi Chun Lin ◽  
Yung Nane Yang

The ripples of the tsunami crisis in Japan triggered introspections of nuclear plant safety issues in the worldwide. Many countries have claimed the suspension of nuclear power plants. However, some countries such as Taiwan, under nearly 99% energy is exported, the disasters force government and citizen to face the importance of nuclear safety, especially the neighborhoods nearby the nuclear power plants. We have to face the nuclear safety since there is no other alternative energy presently. The 3rd nuclear power plant located in the south of Taiwan, which has the same geographic features with Fukushima, Japan. Presently, there is no precedent in Taiwan of precaution and rescue team and civil supervised mechanic on nuclear security issue. This paper will review according to transparent information, public participation and cross-organization cooperation to propose the execution and work division principles, including information monitor, educational propagation, hide and evacuation, emergence aid and care, rear and refuge service. The ultimate target is to establish self-governance inside nearby neighborhood to confront nuclear disaster at the critical moment.


Author(s):  
Zhilin Chen ◽  
Ping Huang ◽  
Chunhui Wang ◽  
Zhiyuan Chi ◽  
Fangjie Shi ◽  
...  

It’s the trend to extend the operating license time, called Operating License Extension (OLE) in China, of nuclear power plants (NPPs) in the future. It needs to be adequately demonstrated by licensees and approved by the regulator to gain an extended license time, such as 20 years. The demonstration methods for OLE are different among countries due to the different management systems for NPPs. Safety assessment, environment effect evaluation and update of the final safety analysis report (FSAR) will be the main aspects during OLE demonstration of NPPs in China according to the technical policy issued by National Nuclear Safety Administration (NNSA). Technical methods for scoping and screening, aging management review and time-limited aging analyses, which are the main contents of safety assessment are established based on the technical policy drafted by NNSA and international experiences in order to assist the operators to implement the safety assessment for OLE of NPP.


Author(s):  
M. K. Agrawal ◽  
A. Ravi Kiran ◽  
A. K. Ghosh ◽  
H. S. Kushwaha

The Containment Studies Facility (CSF) is being set up in BARC for studying various containment related thermal hydraulic and other phenomena which occur during simulated accident conditions in Nuclear power Plants. The facility consists of a concrete containment model having a volumetric scale ratio of 200:1 with respect to the actual containment of Indian Pressurized Heavy Water Reactor. The structure is designed for pressure of 1.73 Kg/cm2 for specified leak tightness. Adequacy to withstand design pressure is checked by test as well as numerical analysis before commissioning of the facility. Accordingly Containment building model has been analyzed by finite element method for internal design pressure and dead weight. Analysis has been carried out for the structure with and without the opening in the containment. Effect of opening on the response of containment has been studied. The paper includes the modeling methodology, maximum deflection and stress amplification around the opening for various models.


Sign in / Sign up

Export Citation Format

Share Document