Joint Flood Control Dispatching and Scheme Optimization of Cascade Reservoirs on Yalong River

2021 ◽  
Vol 10 (02) ◽  
pp. 186-197
Author(s):  
洁 牛
Water ◽  
2019 ◽  
Vol 11 (4) ◽  
pp. 643 ◽  
Author(s):  
Xuan Liu ◽  
Mingxiang Yang ◽  
Xianyong Meng ◽  
Fan Wen ◽  
Guangdong Sun

The construction and operation of cascade reservoirs has changed the natural hydrological cycle in the Yalong River Basin, and reduced the accuracy of hydrological forecasting. The impact of cascade reservoir operation on the runoff of the Yalong River Basin is assessed, providing a theoretical reference for the construction and joint operation of reservoirs. In this paper, eight scenarios were set up, by changing the reservoir capacity, operating location, and relative location in the case of two reservoirs. The aim of this study is to explore the impact of the capacity and location of a single reservoir on runoff processes, and the effect of the relative location in the case of joint operation of reservoirs. The results show that: (1) the reservoir has a delay and reduction effect on the flood during the flood season, and has a replenishment effect on the runoff during the dry season; (2) the impact of the reservoir on runoff processes and changes in runoff distribution during the year increases with the reservoir capacity; (3) the mitigation of flooding is more obvious at the river basin outlet control station when the reservoir is further downstream; (4) an arrangement with the smaller reservoir located upstream and the larger reservoir located downstream can maximize the benefits of the reservoirs in flood control.


Water ◽  
2019 ◽  
Vol 11 (9) ◽  
pp. 1836 ◽  
Author(s):  
Guanjun Liu ◽  
Hui Qin ◽  
Qin Shen ◽  
Rui Tian ◽  
Yongqi Liu

Reservoirs play a significant role in water resources management and water resource allocation. Traditional flood limited water level (FLWL) of reservoirs is set as a fixed value which over-considers the reservoir flood control and limits the benefits of reservoirs to a certain extent. However, the dynamic control of the reservoir FLWL is an effective solution. It is a method to temporarily increase the water level of the reservoir during the flood season by using forecast information and discharge capacity, and it can both consider flood control and power generation during the flood season. Therefore, this paper focuses on multi-objective optimal scheduling of dynamic control of FLWL for cascade reservoirs based on multi-objective evolutionary algorithm to get the trade-off between flood control and power generation. A multi-objective optimal scheduling model of dynamic control of FLWL for cascade reservoirs which contains a new dynamic control method is developed, and the proposed model consists of an initialization module, a dynamic control programming module and an optimal scheduling module. In order to verify the effectiveness of the model, a cascade reservoir consisting of seven reservoirs in the Hanjiang Basin of China were selected as a case study. Twenty-four-hour runoff data series for three typical hydrological years were used in this model. At the same time, two extreme schemes were chosen for comparison from optimized scheduling schemes. The comparison result showed that the power generation can be increased by 9.17 × 108 kW·h (6.39%) at most, compared to the original design scheduling scheme, while the extreme risk rate also increased from 0.1% to 0.268%. In summary, experimental results show that the multi-objective optimal scheduling model established in this study can provide decision makers with a set of alternative feasible optimized scheduling schemes by considering the two objectives of maximizing power generation and minimizing extreme risk rate.


Water ◽  
2020 ◽  
Vol 12 (7) ◽  
pp. 1883
Author(s):  
Di Zhu ◽  
Yadong Mei ◽  
Xinfa Xu ◽  
Junhong Chen ◽  
Yue Ben

As more and more water projects are built on rivers, the flood control operation becomes more complex. Studies on the optimal flood control operation are very important to safeguard human life and property. This study focused on optimizing the operation of a complex flood control system composed of cascade reservoirs, navigation-power junctions, flood storage areas, and flood control points. An optimal model was established to jointly maximize flood peak reduction rates of downstream flood control points. A hybrid algorithm named the Dynamic Programming-Progressive Optimality Algorithm (DP-POA) was used to solve this model, and the middle and lower reaches of the Ganjiang River were selected as a case study. The results show that flood reduction at three downstream flood control points ranged from 1080 to 5359 m3/s for designed floods with different return periods, which increased by about 333~1498 m3/s in comparison with the conventional operation. Considering that the maximum water level of reservoirs using DP-POA and the conventional operation is the same, this indicated that DP-POA can make full use of the reservoirs’ flood control storage to reduce downstream flood peaks. In addition, the flood diversion volume of the flood storage area using DP-POA ranged from 0.33 × 108 to 1.79 × 108 m3 for designed floods with 200-year, 300-year, and 500-year return periods, which is smaller than that using the conventional operation.


Water ◽  
2019 ◽  
Vol 11 (4) ◽  
pp. 849 ◽  
Author(s):  
Xiaokuan Ni ◽  
Zengchuan Dong ◽  
Wei Xie ◽  
Wenhao Jia ◽  
Changgui Duan ◽  
...  

This paper analyzes the complex relationship among flood control, power generation and ecological maintenance for the four cascade reservoirs located on the lower reaches of the Jinsha River, China. A weighted flood control index is incorporated and a constraining method consisting of the combination of a constrained corridor and a penalty function is proposed. A comprehensive utilization model is established in this paper based on the objectives of flood prevention, power generation, and ecological maintenance of the downstream cascade reservoir group of the Jinsha River during flood season. In addition, based on the coalescent selection of reference points and vector angles, an optimized non-dominated sorting genetic algorithm (VA-NSGA-III) is proposed. The algorithm is applied to the constructed model to define the cooperative competition mechanisms among these three targets, resulting in a set of non-inferior scheduling schemes with more uniformity and better convergence acquired with VA-NSGA-III. The scheduling program shows that there is a non-linear competitive relationship between the power generation and ecological effects of the cascade reservoirs during flood season, and the competitiveness weakens as the power generation increases. Furthermore, when the flood control is at low risk, there exists a complex coupling relationship between competition and coordination of the flood control, power generation, and ecological maintenance. While the risk appears high, there is a competitive relationship between flood control and power generation, with flood control being in synergy with ecological maintenance.


Water ◽  
2019 ◽  
Vol 11 (11) ◽  
pp. 2401 ◽  
Author(s):  
Hongyi ◽  
Zengchuan ◽  
Wenhao ◽  
Xiaokuan ◽  
Mufeng ◽  
...  

The lower reaches of Jinsha River host the richest hydropower energy sources in China. With the construction of Wudongde and Baihetan, the multi-objective optimization for cascade reservoirs (along with Xiluodu and Xiangjia Dam) in the lower reaches of Jinsha River will create significant benefits. This paper focuses on the competitive relationship between flood control and power generation, and attaches attention to the measurement of different objective functions and their competitive relationship. With observations of the flood in 1974, 1981, and 1985, a 100-year return period flood with peak-3d volume pair as different inputs for the optimal model is approached by NSGA-II. Different flood seasons divided by flood feature is applied to figure out specific competitive relationship. The results can be concluded as the following: (1) Strong competitive relationship mainly occurs in pre-flood season. (2) Whether it shows a strong competitive relationship depends on the amount of discharge. If the turbine is set to full capacity, power generation is fulfilled certainly, which means that there exists a weak competitive relationship between multi-objectives. (3) The different processes of floods have an effect on the duration of a competitive relationship. A flood with a late peak causes the extension of strong competition in the pre-flood season, which lends itself to a strong competition relationship in the post-flood season. (4) The intensity of competition in the pre-flood season is higher than that in the post-flood season because it has a larger range.


Sign in / Sign up

Export Citation Format

Share Document