Development experience of Cooperative Project Management System in an Engineering Company

Author(s):  
Nadezhda Vurdova

The article deals with the problems of developing a corporate project management system in an engineering company that implements "full-cycle" projects - from object design to commissioning in the field of industrial water treatment and water treatment. The problems are connected, first of all, with the achieved level of maturity of the business, the fear of any changes, when the stability of the result is more important than further development. The analysis of the process of working on the project from the stage of initiation to completion was carried out, the most problematic, bottlenecks in the current project management system were identified. Based on the conducted research, the company's management has developed and approved a plan for the development of CSU for the next year and for the future.

Vestnik MGSU ◽  
2020 ◽  
pp. 1175-1190
Author(s):  
Vladimir V. Kudrevatykh

Introduction. Organizational development and practice of the project management system implementation is of particular interest to engineering companies that implement complex and multi-stage design and construction projects having a complex structure, a large number of stakeholders and a high degree of result individualization. In this case, a situation often arises when processes are formalized, which means that a certain list of regulatory documents are developed in which project contributors, their activities, authority and responsibility, a sequence of actions to be performed, templates of project documents, etc. are defined, but in practice these requirements are not fulfilled or not fulfilled in full. The research problem is that approaches to the formation of a project management system do not offer a universal mechanism applied to monitor the compliance with project management requirements established by inhouse regulatory documents. As a result, project contributors resist such requirements in some companies. The subject of the study is the development of a tool designated for the monitoring of compliance with regulatory documents in the field of project management in a full-cycle engineering company. Materials and methods. The method of process modeling and reengineering, statistical analysis, and the requirements management methodology were applied. Results. Features of project management in engineering companies are outlined. Research results obtained in terms of adapting the requirement management methodology and engineering project quality are analyzed. The target scheme that applies to project management quality control and project audit processes was performed. The toolkit for the project management quality control was developed and a list of indicators was formulated. The analysis of statistics on cases of failure to comply with project management quality indicators and underlying reasons is conducted. Conclusions. The project management quality control toolkit, proposed in the article, allows to analyze the compliance of project contributors with the requirements applied to project management processes formalized in a company and to increase the efficiency of various types of projects.


The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


2020 ◽  
Vol 2 (7) ◽  
pp. 49-54
Author(s):  
E. G. ERLYGINA ◽  
◽  
I. I. SAVEL’EV ◽  

Project approach in enterprise management is an important aspect in the company s performance which allows maintaining the company's leadership position in its field of activity. In this regard, the corporate project management system is an effective tool for managing the company's activities. The paper presents a possible typology of organizational projects, defines the place of project management in the strategic process of the organization. The classification of projects by main areas of activity is given. The problems of the project management system are considered and measures are developed to eliminate counteractions when implementing a corporate project management system.


Mathematics ◽  
2021 ◽  
Vol 9 (14) ◽  
pp. 1633
Author(s):  
Zhiwu Zhou ◽  
Julián Alcalá ◽  
Víctor Yepes

The aim of this paper is to establish an international framework for sustainable project management in engineering, to make up the lack of research in this field, and to propose a scientific theoretical basis for the establishment of a new project management system. The article adopts literature review, mathematical programming algorithm and case study as the research method. The literature review applied the visual clustering research method and analyzed the results of 21-year research in this field. As a result, the project management system was found to have defects and deficiencies. A mathematical model was established to analyze the composition and elements of the optimized international project management system. The case study research selected large bridges for analysis and verified the superiority and practicability of the theoretical system. Thus, the goal of sustainable development of bridges was achieved. The value of this re-search lies in establishing a comprehensive international project management system model; truly integrating sustainable development with project management; providing new research frames and management models to promote the sustainable development of the construction industry.


2001 ◽  
Vol 10 (2) ◽  
pp. 239-246 ◽  
Author(s):  
Z.M Deng ◽  
H Li ◽  
C.M Tam ◽  
Q.P Shen ◽  
P.E.D Love