Business Recovery Conditions of Private Enterprises after the 2011 Great East Japan Earthquake and Issues on Business Continuity Measures for Large-Scale Disaster Management — A Case Study of Small and Medium-Sized Enterprises in Miyagi —

Author(s):  
Norimasa NAKATANI ◽  
Osamu MURAO ◽  
Kimiro MEGURO ◽  
Kiyomine TERUMOTO
2016 ◽  
Vol 11 (sp) ◽  
pp. 780-788 ◽  
Author(s):  
Michio Ubaura ◽  
◽  
Junpei Nieda ◽  
Masashi Miyakawa ◽  

In large-scale disasters and the subsequent recovery process, land usage and urban spatial forms change. It is therefore important to use this process as an opportunity to create a more sustainable spatial structure. This study considers the urban spatial transformations that took place after the Great East Japan Earthquake, their causes, and accompanying issues by investigating building construction in the recovery process. The authors discovered that individual rebuilding is primarily concentrated in vacant lots within the city’s existing urbanized areas. This is likely due to the spatial impact of the urban planning and agricultural land use planning system, the area division of urbanization promotion areas, and the urbanization restricted areas, all of which were in place prior to the disaster and which have guided development. On the other hand, there are areas severely damaged by tsunami in which there has been little reconstruction of housing that was completely destroyed. The authors concluded that building reconstruction in Ishinomaki City resulted in both the formation of a high-density compact city and also very low-density urban areas.


2020 ◽  
Vol 24 (1) ◽  
pp. 75-96
Author(s):  
Joan Carlini ◽  
Alexandra Coghlan ◽  
Alana Thomson ◽  
Andrew O'Neil

Bids for large-scale sporting events and the accompanying political rhetoric typically include promises of economic development and gains for host business communities over the short and long term. Although conceptual models for economic leverage of large-scale sport events have been developed, our knowledge of the practical experiences of private enterprise converting opportunities presented by large-scale sport events is limited. In this article, the authors address this gap through a case study of the Gold Coast 2018 Commonwealth Games. The article investigates the opportunities and challenges perceived by private enterprises across the host city and explores the implementation of existing strategies to leverage benefits for business. Although participants identify the general benefits of hosting the event, they struggle to conceptualize benefits in relation to their own business settings. This suggests a disconnect between the legacy rhetoric of large-scale sporting events and the conversion of these opportunities into outcomes by private enterprises in the host city. Against this background, the article outlines a range of practical implications for private enterprise and key areas for future research.


2016 ◽  
Vol 11 (3) ◽  
pp. 486-495 ◽  
Author(s):  
Michio Ubaura ◽  
◽  
Sei Akiyama ◽  

Town planning for reconstruction after large-scale disasters that is led exclusively by the local government may be insufficient. However, it is also difficult to effectively incorporate citizen participation into planning because of insufficient government manpower and a lack of time among citizens. The present study surveys and analyzes a process of mutual coordination between a local government and citizens involved in town reconstruction planning after a large-scale disaster in order to understand how citizens’ participation in the early stages of the planning process for town reconstruction should be. A local study meeting in Miyako City is taken as a case example. As a method of incorporating citizen participation, it is found that the local study meeting was simple and effective method in obtaining consensus among local residents, but was not effective and may even have exacerbated disagreement regarding fundamental issues.


2021 ◽  
Vol 16 (6) ◽  
pp. 929-932
Author(s):  
Hajime Kagiya ◽  

According to the survey of the Japan Society of Civil Engineers, sending and receiving of support, vertical division of organizations, business continuity, local collaboration, management of disaster prevention and mitigation, advance preparation for reconstruction, and number of personnel are listed as the problems of a local disaster management. As for these problems, the achievements are made clear by analyzing concretely the progress for 10 years after the Great East Japan Earthquake based on the data and examples. As a result it is found out that at the state level the know-how to formulate the subordinate plan of a regional disaster management plan has been summarized and the training system is being arranged to develop the human resources. And at the level of the local governments the rate of the local governments which have worked out a business continuity plan improves and the number of the personnel engaging in disaster management increases significantly. Furthermore, some remarkable advanced examples are observed in the problems of “vertical division of organizations” and “local collaboration.” In the future these measures should be implemented in the individual local governments and elaborated continuously by improving themselves through friendly rivalry.


1996 ◽  
Vol 5 (1) ◽  
pp. 23-32 ◽  
Author(s):  
Chris Halpin ◽  
Barbara Herrmann ◽  
Margaret Whearty

The family described in this article provides an unusual opportunity to relate findings from genetic, histological, electrophysiological, psychophysical, and rehabilitative investigation. Although the total number evaluated is large (49), the known, living affected population is smaller (14), and these are spread from age 20 to age 59. As a result, the findings described above are those of a large-scale case study. Clearly, more data will be available through longitudinal study of the individuals documented in the course of this investigation but, given the slow nature of the progression in this disease, such studies will be undertaken after an interval of several years. The general picture presented to the audiologist who must rehabilitate these cases is that of a progressive cochlear degeneration that affects only thresholds at first, and then rapidly diminishes speech intelligibility. The expected result is that, after normal language development, the patient may accept hearing aids well, encouraged by the support of the family. Performance and satisfaction with the hearing aids is good, until the onset of the speech intelligibility loss, at which time the patient will encounter serious difficulties and may reject hearing aids as unhelpful. As the histological and electrophysiological results indicate, however, the eighth nerve remains viable, especially in the younger affected members, and success with cochlear implantation may be expected. Audiologic counseling efforts are aided by the presence of role models and support from the other affected members of the family. Speech-language pathology services were not considered important by the members of this family since their speech production developed normally and has remained very good. Self-correction of speech was supported by hearing aids and cochlear implants (Case 5’s speech production was documented in Perkell, Lane, Svirsky, & Webster, 1992). These patients received genetic counseling and, due to the high penetrance of the disease, exhibited serious concerns regarding future generations and the hope of a cure.


2008 ◽  
Author(s):  
D. L. McMullin ◽  
A. R. Jacobsen ◽  
D. C. Carvan ◽  
R. J. Gardner ◽  
J. A. Goegan ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document