COMPUTER SIMULATION OF WATER FLOW IN CAPACITIVE STRUCTURES DURING START-UP WORKS AND EXPLOITATION

2015 ◽  
Vol 5 (1) ◽  
pp. 48-51
Author(s):  
Artiom M. BARINOV

As a result of commissioning of rainwater treatment installation at the Adler sewage treatment plants in Sochi its signifi cant design disadvantages are revealed. Thin layer tank unit doesnt meet project requirements. Computer hydrodynamic model of an existing plant is built to obtain the coefficient of volume usage. Also design changes that improve the performance of the installation are proposed and simulated.

2019 ◽  
Vol 8 (4) ◽  
pp. 6338-6341

Small scale hydropower is among the most attractive and cost-effective sustainable energy technologies available, by harnessing electricity through moving water. Naturally, moving water can be found in rivers and also man-man conduits where there is a continuous water flow. The sewage treatment facility has continuous water flow at the effluent pipe that can generate electricity by means of small-hydropower system. However, there are no sewage treatment plants (STP) in Malaysia that reclaim the energy through the usage of water turbines. This study is conducted to evaluate the feasibility of a micro-hydropower (MHP) system at the continuous flow of effluent discharge point of domestic STP that comprises of a low head with high flow fluctuations. This work comprises of evaluation of the potential power output of MHP generator which attached to different type of STP. The work starts with selection of a five STP which have maximum current population equivalent (PE) over design PE loading ratio. Next, the effluent discharge flow rate & outfall head are collected and recorded. Finally the potential output power for all selected STPs is calculated. The highest continuous effluent discharge flow rate contributing in high potential power and will be identified as the feasible STP for the MHP system installation.


1996 ◽  
Vol 33 (1) ◽  
pp. 159-164 ◽  
Author(s):  
J. Londong ◽  
P. Wachtl

The Wupperverband operates 14 sewage treatment plants in the catchment area of the Wupper river. New treatment plants, which were designed for extended nutrient removal, have been equipped with on-line analysers. To find the lay-out data, to control operation and as a support for the start-up phases of new treatment plants, a mobile container for on-line analysis of COD, BOD, NH4 and NO3 is in use. Several types of analysers were tested with different types of sewage and at different sampling points (influent, effluent primary sedimentation, effluent denitrification, effluent nitrification and final effluent). This enables us to compare and to assess the tested machines. As a result of these comparisons and for operational reasons the photometric principle was chosen for further application. Adequate maintenance with trained staff provided, especially of sampling preparation units, all tested photometric analysers could be used for control and automation purposes because of their reliable measuring values.


2008 ◽  
Vol 37 (2) ◽  
Author(s):  
Maciej Walczak

Changes of microbial indices of water quality in the Vistula and Brda rivers as a result of sewage treatment plant operationThis paper reports the results of studies of microbiological changes in the water quality of the Vistula and Brda rivers after the opening of sewage treatment plants in Bydgoszcz. The study involved determining the microbiological parameters of water quality. Based on the results obtained, it was found that the quality of the water in both rivers had improved decidedly after the opening of the plants, although an increased number of individual groups of microorganisms was found at the treated sewage outlet from one of the plants.


1995 ◽  
Vol 30 (4) ◽  
pp. 565-592 ◽  
Author(s):  
A.F. Gemza

Abstract Severn Sound continues to exhibit signs of eutrophication despite initial identification of the problem in 1969 and the construction of several sewage treatment plants since then. In general, improvements in trophic state indicators have been marginal, suggesting that the sewage treatment plants have had limited success in controlling phosphorus concentrations. These discharges likely contributed to the increased total phosphorus levels and consequently the higher phytoplankton densities of the nearshore waters. Phytoplankton biovolumes were on average one order of magnitude higher than in the open waters of Lake Huron with mean summer biovolumes as high as 8.0 mm/L. Algal biovolumes were most dense in Penetang Bay, which experienced limited exchange with the main waters of the sound. No significant long-term trends were observed. Water clarity was declining significantly, however, at a rate of -0.60 to -0.78 m/year throughout the sound except in Sturgeon Bay. Total phosphorus levels were highly variable from year to year; however, concentrations from a 20-year perspective were declining in the open waters at a rate of 0.70 µg/L/year, but response was limited in nearshore areas. In Sturgeon Bay, mean annual euphotic zone total phosphorus as well as soluble reactive phosphorus levels declined by as much as 50% following the construction of a sewage treatment plant with tertiary treatment. Phytoplankton genera typical of eutrophic waters continued to dominate the algal assemblage but members indicative of mesotrophic conditions have become apparent in some areas of the sound.


1982 ◽  
Vol 14 (4-5) ◽  
pp. 143-150 ◽  
Author(s):  
F B DeWalle ◽  
D A Kalman ◽  
R Dills ◽  
D Norman ◽  
E S K Chian ◽  
...  

A total of 25 municipal sewage treatment plants were sampled, 10 of which were resampled, to determine the quantity of phenolics in the sewage, final effluent and the anaerobically digested sludge using capillary GC/MS/DS/techniques. The study noted in decreasing order of frequency in raw sewage: phenol, pentachloro-phenol, dimethyl phenol, 3-methyl, 4-chlorophenol, 2,4,6-trichloro-phenol, 2,4-dichlorophenol, 2-nitrophenol, 2-chlorophenol, 2,4-dinitro-6-methylphenol and 2,4-dinitrophenol. The maximum concentration of phenol in sewage and sludge was 2800 ppb and 4460 respectively, while similar values for pentachlorophenol were 58 and 1200 ppb. Statistically calculated concentration reductions for phenol and dimethyl phenol were generally greater than noted for tri- and pentachlorophenol. Low decreases or increases were noted for monochlorophenol and especially for dichlorophenol as a result of the chloronation of the final effluent.


1990 ◽  
Vol 22 (7-8) ◽  
pp. 113-121
Author(s):  
W. Maier

In view of the new effluent standards in West Germany, including nitrification and phosphorus elimination, many of the existing sewage treatment plants will have to be rebuilt or expanded. Another demand which will have to be dealt with in the near future is denitrification. Under consideration of the large BOD5-loads which were taken into account when designing the plants, many of them nitrify during the summer or can be easily converted to operate with nitrification. Principles for planning the upgrading of such plants have been laid down in order to achieve the required effluent concentrations. The application of these principles is demonstrated with examples of upgraded plants.


1991 ◽  
Vol 24 (7) ◽  
pp. 133-148 ◽  
Author(s):  
A. Peter ◽  
F. Sarfert

In investigations concerning sludge bulking in Berlin enhanced biological phosphorus removal was first observed unexpectedly. Because since 1986 an officially preset limit of 2 mg TP/l must be kept in all Berlin wastewater discharges it was decided to explore the capabilities of the observed mechanism under the specific circumstances of the exciting two large treatment plants in Ruhleben (240,000 m3/d) and Marienfelde (100,000 m3/d). For this purpose some of the existing units at both plants were equipped with anaerobic zones which were generated mainly by process modifications. Additionally stage one of the Ruhleben plant was altered completely in order to investigate the combination of biological phosphorus and nitrogen removal as a special pilot study in three parallel trains. The research activities and treatment results gained in each of the two stages of the Ruhleben and in the Marienfelde plant are reported in detail. For example BOD-related phosphorus removal rates were obtained ranging from 2.3-4.5 mg TP per 100 mg BOD removed. It must be stressed that all examinations were performed on full-scale conditions. At present the given limit of 2 mg TP/l in the Ruhleben plant is met without any chemical precipitation at least on average. From the beginning biological phosphorus removal will be integrated into further projected extensions.


1991 ◽  
Vol 24 (7) ◽  
pp. 103-111 ◽  
Author(s):  
G. Brattberg ◽  
L.-G. Reinius ◽  
M. Tendaj

Stockholm was founded at the point where the waters of Lake Mälaren emerge into the Baltic Sea. Lake Mälaren is the water source of the water works of Stockholm. The Lake also receives water from one of the sewage treatment plants. The outlet from the two other sewage treatment plants are in the inner part of the archipelago. During 1968-73 the treatment was improved, after which the phosphorus load to the receiving water significantly decreased. The total P concentration in the surface water has decreased since 1970 and phosphorus has replaced nitrogen as the most limiting nutrient throughout the entire archipelago within 50 km from Stockholm. To further reduce the eutrophication a continued reduction of the phosphorus load is most effective. For the Baltic proper as a whole, where primary nitrogen limitation is present, it is important to reduce the supply of nitrogen to the greatest possible extent. The treatment plants in Stockholm are located in subsurface rock-chambers. The treatment includes mechanical, biological and chemical treatment. In the mechanical stage the sewage is treated in screens, grit chambers and primary sedimentation. The biological stage is a conventional activated sludgeprocess. For the chemical precipitation ferroussulphateis added before the screens. The sludge is stabilized in anaerobic digesters and dewatered in centrifuges before disposal on farmland. To meet more stringent requirements on nitrification and nitrogen removal several projects are going on to optimize the nutrient removal. The aim of these investigations is to improve the plants' performance within the existing plant.


1995 ◽  
Vol 32 (3) ◽  
pp. 317-327 ◽  
Author(s):  
P. Cooper ◽  
B. Green

The UK Water Industry first became interested in Reed Bed Treatment Systems for sewage in 1985. Early problems were experienced with soil-based horizontal-flow systems of the Root Zone type. The problems were overcome by national co-ordination of a development programme and international co-operation by an EC Expert Contact Group. A number of different types of systems have now been developed and the systems are now being accepted. The paper reviews the development of these systems for secondary and tertiary treatment and nitrification and mentions development of systems for other forms of treatment. The design changes made to overcome the problems are described. These include the gradual move to the use of gravel-based systems because of the difficulty experienced with over-land flow in the soil systems. The sizing of the systems is described together with performance data for the original horizontal-flow and the more recently developed vertical-flow systems. Treatment at secondary and tertiary levels is illustrated and the potential for nitrification. Early problems with reed growth have been overcome by planting with port-grown seedlings. After 10 years the process is generally accepted by the Water Industry as an appropriate treatment for villages and there are now between 200 and 300 systems in operation.