Uncertainty Evaluation in a Flood Forecasting Model Using JMA Numerical Weather Prediction

2009 ◽  
Vol 4 (4) ◽  
pp. 600-605 ◽  
Author(s):  
Hadi Kardhana ◽  
◽  
Akira Mano ◽  

Numerical weather prediction (NWP) is useful in flood prediction using a rainfall-runoff model. Uncertainty occurring in the forecast, however, adversely affects flood prediction accuracy, in addition to uncertainty inherent in the rainfall-runoff model. Clarifying this uncertainty and its magnitude is expected to lead to wider forecast applications. Taking the case of Japan’s Shichikashuku Dam, 6 flood events between 2002 and 2007 were analyzed. NWP was based on short-range forecasts by the Japan Meteorological Agency (JMA). The rainfall-runoff model is based on a distributed tank model. This research calculates uncertainty by identifying and quantifying the relative error of forecasts by a) NWP and b) the runoff model. Results showed that NAP is the main cause of flood forecast uncertainty. They also showed the correlation between forecast lead time and uncertainty. Uncertainty rises with longer lead time, corresponding to the magnitude of observed discharge and precipitation.

2008 ◽  
Vol 10 (1) ◽  
pp. 23-41 ◽  
Author(s):  
Yongdae Lee ◽  
Sheung-Kown Kim ◽  
Ick Hwan Ko

Operation planning for a coordinated multi-reservoir is a complex and challenging task due to the inherent uncertainty in inflow. In this study, we suggest the use of a new, multi-stage and scenario-based stochastic linear program with a recourse model incorporating the meteorological weather prediction information for daily, coordinated, multi-reservoir operation planning. Stages are defined as prediction lead-time spans of the weather prediction system. The multi-stage scenarios of the stochastic model are formed considering the reliability of rainfall prediction for each lead-time span. Future inflow scenarios are generated by a rainfall–runoff model based on the rainfall forecast. For short-term stage (2 days) scenarios, the regional data assimilation and prediction system (RDAPS) information is employed, and for mid-term stage (more than 2 days) scenarios, precipitation from the global data assimilation and prediction system (GDAPS) is used as an input for the rainfall–runoff model. After the 10th day (third stage), the daily historical rainfall data are used following the ensemble streamflow prediction (ESP) procedure. The model is applied to simulate the daily reservoir operation of the Nakdong River basin in Korea in a real-time operational environment. The expected benefit of the stochastic model is markedly superior to that of the deterministic model with average rainfall information. Our study results confirm the effectiveness of the stochastic model in real-time operation with meteorological forecasts and the presence of inflow uncertainty.


2013 ◽  
Vol 17 (5) ◽  
pp. 1913-1931 ◽  
Author(s):  
D. L. Shrestha ◽  
D. E. Robertson ◽  
Q. J. Wang ◽  
T. C. Pagano ◽  
H. A. P. Hapuarachchi

Abstract. The quality of precipitation forecasts from four Numerical Weather Prediction (NWP) models is evaluated over the Ovens catchment in Southeast Australia. Precipitation forecasts are compared with observed precipitation at point and catchment scales and at different temporal resolutions. The four models evaluated are the Australian Community Climate Earth-System Simulator (ACCESS) including ACCESS-G with a 80 km resolution, ACCESS-R 37.5 km, ACCESS-A 12 km, and ACCESS-VT 5 km. The skill of the NWP precipitation forecasts varies considerably between rain gauging stations. In general, high spatial resolution (ACCESS-A and ACCESS-VT) and regional (ACCESS-R) NWP models overestimate precipitation in dry, low elevation areas and underestimate in wet, high elevation areas. The global model (ACCESS-G) consistently underestimates the precipitation at all stations and the bias increases with station elevation. The skill varies with forecast lead time and, in general, it decreases with the increasing lead time. When evaluated at finer spatial and temporal resolution (e.g. 5 km, hourly), the precipitation forecasts appear to have very little skill. There is moderate skill at short lead times when the forecasts are averaged up to daily and/or catchment scale. The precipitation forecasts fail to produce a diurnal cycle shown in observed precipitation. Significant sampling uncertainty in the skill scores suggests that more data are required to get a reliable evaluation of the forecasts. The non-smooth decay of skill with forecast lead time can be attributed to diurnal cycle in the observation and sampling uncertainty. Future work is planned to assess the benefits of using the NWP rainfall forecasts for short-term streamflow forecasting. Our findings here suggest that it is necessary to remove the systematic biases in rainfall forecasts, particularly those from low resolution models, before the rainfall forecasts can be used for streamflow forecasting.


2021 ◽  
Author(s):  
Sven Ulbrich ◽  
Christian Welzbacher ◽  
Kobra Khosravianghadikolaei ◽  
Michael Hoff ◽  
Alberto de Lozar ◽  
...  

<p>The SINFONY project at Deutscher Wetterdienst (DWD) aims to produce seamless precipitation forecast products from minutes up to 12 hours, with particular focus on convective events. While the near future predictions are typically from nowcasting procedures using radar data, the numerical weather prediction (NWP) aims at longer time scales. The lead-time in the latest available forecast is usually too long for merging both the nowcasting and NWP output to produce reliable seamless predictions.</p><p>At DWD, the current forecasts are produced by the short range numerical weather prediction (SRNWP) <span>making use of a</span> continuous assimilation cycle with relatively long cutoff times and using 1-moment microphysics. In order to reduce the differences in the precipitation to the <span>nowcasting </span>on the NWP side, we use two different approaches. First, we reduce the lead-time from the model start by running 1-hourly forecasts based on an assimilation cycle with shorter data cutoff. Secondly, we use new observational systems in the assimilation cycle, such as radar or satellite data to capture and represent strong convective activity. This procedure is called Rapid Update Cycle (RUC). As an additional measure, we introduce a 2-Moment microphysics scheme into the numerical model, resulting in a better representation of the radar reflectivities. In order to keep the model state similar to that of the SRNWP, the RUC is a time limited assimilation cycle starting from forecasts of the SRNWP at pre-defined times.</p><p>The introduction of the 2-Moment scheme leads to a spin-up affecting both the assimilation cycle and the short forecasts. The resulting effects are analysed by comparison with the corresponding assimilation cycle using the 1-Moment scheme. As a complementary approach for the analysis, the routine cycle is run with the 2-Moment scheme. The forecast quality is used as a measure to compare the results with respect to precipitation and additional observed parameters. It is shown in how far the resulting improvements are related to the assimilation and momentum scheme, or to the higher frequency of forecasts.</p>


2021 ◽  
Vol 4 ◽  
pp. 50-68
Author(s):  
S.А. Lysenko ◽  
◽  
P.О. Zaiko ◽  

The spatial structure of land use and biophysical characteristics of land surface (albedo, leaf index, and vegetation cover) are updated using the GLASS (Global Land Surface Satellite) and GLC2019 (Global Land Cover, 2019) modern satellite databases for mesoscale numerical weather prediction with the WRF model for the territory of Belarus. The series of WRF-based numerical experiments was performed to verify the influence of the updated characteristics on the forecast quality for some difficult to predict winter cases. The model was initialized by the GFS (Global Forecast System, NCEP) global numerical weather prediction model. It is shown that the use of high-resolution land use data in the WRF and the consideration of the new albedo and leaf index distribution over the territory of Belarus can reduce the root-mean-square error (RMSE) of short-range (to 48 hours) forecasts of surface air temperature by 16–33% as compared to the GFS. The RMSE of the temperature forecast for the weather stations in Belarus for a forecast lead time of 12, 24, 36, and 48 hours decreased on average by 0.40°С (19%), 0.35°С (10%), 0.68°С (23%), and 0.56°С (15%), respectively. The most significant decrease in RMSE of the numerical forecast of temperature (up to 2.1 °С) was obtained for the daytime (for a lead time of 12 and 36 hours), when positive feedbacks between albedo and temperature of the land surface are manifested most. Keywords: numerical weather prediction, WRF, digital land surface model, albedo, leaf area index, forecast model validation


Rainfall-runoff model requires comprehensive computation as its relation is a complex natural phenomenon. Various inter-related processes are involved with factors such as rainfall intensity, geomorphology, climatic and landscape are all affecting runoff response. In general there is no single rainfall-runoff model that can cater to all flood prediction system with varying topological area. Hence, there is a vital need to have custom-tailored prediction model with specific range of data, type of perimeter and antecedent hour of prediction to meet the necessity of the locality. In an attempt to model a reliable rainfall-runoff system for a flood-prone area in Malaysia, 3 different approach of Artificial Neural Networks (ANN) are modelled based on the data acquired from Sungai Pahang, Pekan. In this paper, the ANN rainfall-runoff models are trained by the Levenberg Marquardt (LM), Bayesian Regularization (BR) and Particle Swarm Optimization (PSO). The performances of the learning algorithms are compared and evaluated based on a 12-hour prediction model. The results demonstrate that LM produces the best model. It outperforms BR and PSO in terms of convergence rate, lowest mean square error (MSE) and optimum coefficeint of correlation. Furthermore, the LM approach are free from overfitting, which is a crucial concern in conventional ANN learning algorithm. Our case study takes the data of rainfall and runoff from the year 2012 to 2014. This is a case study in Pahang river basin, Pekan, Malaysia.


2020 ◽  
Author(s):  
Takahiro Sayama ◽  
Masafumi Yamada ◽  
Yoshito Sugawara ◽  
Dai Yamazaki

Abstract The heavy rain event of July 2018 and Typhoon Hagibis in October 2019 caused severe flash flood disasters in numerous parts of western and eastern Japan. Flash floods need to be predicted over a wide range with long forecasting lead time for effective evacuation. The predictability of flash floods caused by the two extreme events are investigated by using a high-resolution (~150 m) nationwide distributed rainfall-runoff model forced by ensemble precipitation forecasts with 39-h lead time. Results of the deterministic simulation at nowcasting mode with radar and gauge composite rainfall could reasonably simulate the storm runoff hydrographs at many dam reservoirs over western Japan for the case of heavy rainfall in 2018 (F18) with the default parameter setting. For the case of Typhoon Hagibis in 2019 (T19), a similar performance was obtained by incorporating unsaturated flow effect in the model applied to Kanto region. The performance of the ensemble forecast was evaluated based on the bias ratios and the relative operating characteristic curves, which suggested the higher predictability in peak runoff for T19. For the F18, the uncertainty arises due to the difficulty in accurately forecasting the storm positions by the frontal zone; as a result, the actual distribution of the peak runoff could not be well forecasted. Overall, this study showed that the predictability of flash floods was different between the two extreme events. The ensemble spreads contain quantitative information of predictive uncertainty, which can be utilized for the decision making of emergency responses against flash floods.


2008 ◽  
Vol 12 (4) ◽  
pp. 1039-1051 ◽  
Author(s):  
J. Younis ◽  
S. Anquetin ◽  
J. Thielen

Abstract. In Mediterranean Europe, flash flooding is one of the most devastating hazards in terms of loss of human life and infrastructures. Over the last two decades, flash floods have caused damage costing a billion Euros in France alone. One of the problems of flash floods is that warning times are very short, leaving typically only a few hours for civil protection services to act. This study investigates if operationally available short-range numerical weather forecasts together with a rainfall-runoff model can be used for early indication of the occurrence of flash floods. One of the challenges in flash flood forecasting is that the watersheds are typically small, and good observational networks of both rainfall and discharge are rare. Therefore, hydrological models are difficult to calibrate and the simulated river discharges cannot always be compared with ground measurements. The lack of observations in most flash flood prone basins, therefore, necessitates the development of a method where the excess of the simulated discharge above a critical threshold can provide the forecaster with an indication of potential flood hazard in the area, with lead times of the order of weather forecasts. This study is focused on the Cévennes-Vivarais region in the Southeast of the Massif Central in France, a region known for devastating flash floods. This paper describes the main aspects of using numerical weather forecasting for flash flood forecasting, together with a threshold – exceedance. As a case study the severe flash flood event which took place on 8–9 September 2002 has been chosen. Short-range weather forecasts, from the Lokalmodell of the German national weather service, are used as input for the LISFLOOD model, a hybrid between a conceptual and physically based rainfall-runoff model. Results of the study indicate that high resolution operational weather forecasting combined with a rainfall-runoff model could be useful to determine flash floods more than 24 h in advance.


2021 ◽  
Vol 8 (1) ◽  
pp. 25
Author(s):  
Hamed Hafizi ◽  
Ali Arda Sorman

Precipitation measurement over a complex topography and highly elevated regions has always been a great challenge in recent decades. On the other hand, satellite-based and numerical weather prediction model outputs can be an alternative to fill this gap. Hence, the goal of this study is to evaluate the spatiotemporal stability and hydrologic utility of four precipitation products (TMPA-3B42v7, IMERGHHFv06, ERA5, and PERSIANN) over a mountainous basin (Karasu basin) located in the eastern part of Turkey. Moreover, the Kling–Gupta efficiency (KGE), including its correlation, bias, and variability ratio components, are used for a direct comparison of precipitation products (PPs) with observed gauge data, and the Hansen–Kuiper (HK) score is utilized to assess the detectability strength of PPs for different precipitation events. In the same way, the hydrologic utility of PPs is tested by exploiting a conceptual rainfall–runoff model under Kling–Gupta efficiency (KGE) and Nash–Sutcliffe efficiency (NSE) metrics. Generally, all PPs show low performance for a direct comparison with observed data while their performance considerably increases for streamflow simulation. TMPA-3B42v7 has high reproducibility in streamflow (KGE = 0.84), followed by IMERGHHFv06 (KGE = 0.76), ERA5 (KGE = 0.75), and PERSIANN (KGE = 0.70), for the entire period (2015–2019) of this study.


Sign in / Sign up

Export Citation Format

Share Document