Drilling and Well Engineering Management System - An Innovative Project Management Approach for Efficient Drilling

2017 ◽  
Author(s):  
Safi Ullah ◽  
Salman Zahid ◽  
Naveed Hasan ◽  
Muhammad Ali
2004 ◽  
Vol 08 (01) ◽  
pp. 1-35
Author(s):  
Jamshed Hasan Khan

This case examines the different project management approaches at Techlogix. Some are highly structured and formal while others are relatively unstructured and informal. The Engyro project involved the development of an Applications Service Provider (ASP) Payments System through a highly structured formal project management system, which created few problems in terms of product specification changes and development. However, a Financial Management System (FMS) developed for the Government of Guam through a relatively unstructured and informal project management approach proved to be a bad experience for Techlogix. The CEO wanted to standardize a highly structured project management system for the company. The project managers at Techlogix feared that a highly structured system would reduce flexibility available to project managers. They felt that a structured configuration and change management system would require a lengthy process to bring about changes in a project's specifications. This would eventually discourage change and create customer dissatisfaction or force the project managers to circumvent standardized procedures creating other problems. This case is useful for examining the factors relevant to project management approaches.


The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


2020 ◽  
Vol 2 (7) ◽  
pp. 49-54
Author(s):  
E. G. ERLYGINA ◽  
◽  
I. I. SAVEL’EV ◽  

Project approach in enterprise management is an important aspect in the company s performance which allows maintaining the company's leadership position in its field of activity. In this regard, the corporate project management system is an effective tool for managing the company's activities. The paper presents a possible typology of organizational projects, defines the place of project management in the strategic process of the organization. The classification of projects by main areas of activity is given. The problems of the project management system are considered and measures are developed to eliminate counteractions when implementing a corporate project management system.


1989 ◽  
Author(s):  
Sine L. Hill ◽  
Sandra Kappes ◽  
David M. Bailey ◽  
Michael J. Binder ◽  
Gerald J. Brown ◽  
...  

Mathematics ◽  
2021 ◽  
Vol 9 (14) ◽  
pp. 1633
Author(s):  
Zhiwu Zhou ◽  
Julián Alcalá ◽  
Víctor Yepes

The aim of this paper is to establish an international framework for sustainable project management in engineering, to make up the lack of research in this field, and to propose a scientific theoretical basis for the establishment of a new project management system. The article adopts literature review, mathematical programming algorithm and case study as the research method. The literature review applied the visual clustering research method and analyzed the results of 21-year research in this field. As a result, the project management system was found to have defects and deficiencies. A mathematical model was established to analyze the composition and elements of the optimized international project management system. The case study research selected large bridges for analysis and verified the superiority and practicability of the theoretical system. Thus, the goal of sustainable development of bridges was achieved. The value of this re-search lies in establishing a comprehensive international project management system model; truly integrating sustainable development with project management; providing new research frames and management models to promote the sustainable development of the construction industry.


Sign in / Sign up

Export Citation Format

Share Document