Coiled-Tubing Hybrid Open-Architecture System Enables Real-Time Downhole 360-View Camera and Production Logging Test for Increased Performance in a Challenging Gas Field

2020 ◽  
Author(s):  
Vanessa Vera ◽  
Carlos Torres ◽  
Eduardo Delgado ◽  
Ivo Foianini ◽  
Diego Arcanjo ◽  
...  
2019 ◽  
Author(s):  
Vanessa Vera ◽  
Carlos Torres ◽  
Eduardo Delgado ◽  
Carlos Pacheco ◽  
Josue Higuera ◽  
...  

2011 ◽  
Author(s):  
Marie Aschehoug ◽  
C. Shah Kabir
Keyword(s):  

2015 ◽  
Author(s):  
A. Ebrahimi ◽  
P. J. Schermer ◽  
W. Jelinek ◽  
D. Pommier ◽  
S. Pfeil ◽  
...  

2016 ◽  
Author(s):  
Diego Blanco ◽  
Khalid Rahimov ◽  
Silviu Livescu ◽  
Louis Garner ◽  
Lubos Vacik

2021 ◽  
Author(s):  
Laurie S. Duthie ◽  
Hussain A. Saiood ◽  
Abdulaziz A. Al-Anizi ◽  
Norman B. Moore ◽  
Carol Correia

Abstract Successful reservoir surveillance and production monitoring is a key component for effectively managing any field production strategy. For production logging in openhole horizontal extended reach wells (ERWs), the challenges are formidable and extensive; logging these extreme lengths in a cased hole would be difficult enough, but are considerably exaggerated in the openhole condition. A coiled tubing (CT) logging run in open hole must also contend with increased frictional forces, high dogleg severity, a quicker onset of helical buckling and early lockup. The challenge to effectively log these ERWs is further complicated by constraints in the completion where electrical submersible pumps (ESPs) are installed including a 2.4" bypass section. Although hydraulically powered coiled tubing tractors already existed, a slim CT tractor with real-time logging capabilities was not available in the market. In partnership with a specialist CT tractor manufacturer, a slim logging CT tractor was designed and built to meet the exceptional demands to pull the CT to target depth. The tractor is 100% hydraulically powered, with no electrical power allowing for uninterrupted logging during tractoring. The tractor is powered by the differential pressure from the bore of the CT to the wellbore, and is operated by a pre-set pump rate from surface. Developed to improve the low coverage in open hole ERW logging jobs, the tractor underwent extensive factory testing before being deployed to the field. The tractor was rigged up on location with the production logging tool and ran in hole. Once the coil tubing locked up, the tractor was activated and pulled the coil to cover over 90% of the open hole section delivering a pulling force of up to 3,200 lb. Real-time production logging was conducted simultaneously with the tractor activated, flowing and shut-in passes were completed to successfully capture the zonal inflow profile. Real-time logging with the tractor is logistically efficient and allows instantaneous decision making to repeat passes for improved data quality. The new slim logging tractor is the world's slimmest most compact, and the first of its kind CT tractor that enables production logging operations in horizontal extended reach open hole wells. The ability to successfully log these extended reach wells cannot be understated, reservoir simulations and management decisions can only as good as the quality of data available. Some of the advantages of drilling extended reach wells such as increased reservoir contact, reduced footprint and less wells drilled will be lost if sufficient reservoir surveillance cannot be achieved. To maximize the benefits of ERWs, creative solutions and innovative designs must continually be developed to push the boundaries further.


2021 ◽  
Author(s):  
Usman Ahmed ◽  
Zhiheng Zhang ◽  
Ruben Ortega Alfonzo

Abstract Horizontal well completions are often equipped with Inflow Control Devices (ICDs) to optimize flow rates across the completion for the whole length of the interval and to increase the oil recovery. The ICD technology has become useful method of optimizing production from horizontal wells in a wide range of applications. It has proved to be beneficial in horizontal water injectors and steam assisted gravity drainage wells. Traditionally the challenges related to early gas or water breakthrough were dealt with complex and costly workover/intervention operations. ICD manipulation used to be done with down-hole tractor conveyed using an electric line (e-line) cable or by utilization of a conventional coiled tubing (CT) string. Wellbore profile, high doglegs, tubular ID, drag and buoyancy forces added limitations to the e-line interventions even with the use of tractor. Utilization of conventional CT string supplement the uncertainties during shifting operations by not having the assurance of accurate depth and forces applied downhole. A field in Saudi Arabia is completed with open-hole packer with ICD completion system. The excessive production from the wells resulted in increase of water cut, hence ICD's shifting was required. As operations become more complex due to fact that there was no mean to assure that ICD is shifted as needed, it was imperative to find ways to maximize both assurance and quality performance. In this particular case, several ICD manipulating jobs were conducted in the horizontal wells. A 2-7/8-in intelligent coiled tubing (ICT) system was used to optimize the well intervention performance by providing downhole real-time feedback. The indication for the correct ICD shifting was confirmed by Casing Collar Locator (CCL) and Tension & Compression signatures. This paper will present the ICT system consists of a customized bottom-hole assembly (BHA) that transmits Tension, compression, differential pressure, temperature and casing collar locator data instantaneously to the surface via a nonintrusive tube wire installed inside the coiled tubing. The main advantages of the ICT system in this operation were: monitoring the downhole force on the shifting tool while performing ICD manipulation, differential pressure, and accurately determining depth from the casing collar locator. Based on the known estimated optimum working ranges for ICD shifting and having access to real-time downhole data, the operator could decide that required force was transmitted to BHA. This bring about saving job time while finding sleeves, efficient open and close of ICD via applying required Weight on Bit (WOB) and even providing a mean to identify ICD that had debris accumulation. The experience acquired using this method in the successful operation in Saudi Arabia yielded recommendations for future similar operations.


2016 ◽  
Author(s):  
Rostislav Panferov ◽  
Anton Burov ◽  
Alexander Zhandin ◽  
Gelu Ghioca ◽  
Derek Boulter

2012 ◽  
Vol 220-223 ◽  
pp. 339-343
Author(s):  
Yu Qiang Li ◽  
Kai Xue ◽  
Shi Lei Yao

The rectangular coordinate CNC pipe profile cutting & welding integrative equipment is researched for the requirements of cutting and automatic welding of complicated butt pipes intersection lines. The mechanical structure of the equipment is that the workpiece is placed onto the supports, the chuck is carried out with limitless rotary movement. The main body for holding cutting torch and welding torch is adopted with cantilever arm traveling structure, and is controlled by six-axis digital AC servo system. The CNC system is developed based on Windows operation system, and it is a kind of pure software open architecture. RTX real-time extension technology is adopted to realize the high real-time requirement in motion control. The minimum deviation method is used to realize the interpolation algorithm of curve which describes the space track of intersection line. The equipment has realized the pipe cutting for blanking and welding for assembling at the same working position, and can meet the requirements for automatic pipe processing technology.


2021 ◽  
Author(s):  
Pamela Poggi ◽  
Emilia Fiorini ◽  
Daniela Tonoli ◽  
Francesca Ioele ◽  
Eric John Parker ◽  
...  

Abstract Objectives/Scope This paper presents an innovative web tool developed for the seismic monitoring of critical infrastructure. As an example, we describe an application for the ENI offshore facilities, Jangkrik and Merakes Fields Development, offshore Indonesia. Methods, Procedures, Process The system monitors reported seismic activity in a project area, and issues warnings when earthquakes detected may have directly or indirectly impacted facilities. Notifications allow the owner to optimize decisions regarding post-earthquake asset surveys and maintenance, avoiding the need for inspections in areas not significantly affected. A system of email alerts and a web based GIS platform provide the end-user with a tool to control its own assets. Results, Observations, Conclusions The purpose of the tool is to indirectly monitor earthquakes in an area and identify those which may have damaged the Oil and Gas facilities of interest. This identification requires accurate near real-time earthquake data such as date, time, location, magnitude, and focal depth. To this end, the system retrieves earthquake data from a qualified set of public seismic agencies. The system computes the expected values of shaking at the specific offshore facilities (platforms, subsea structures, pipelines, etc.). Calculations are based on sets of Ground Motion Prediction Equations (GMPEs) selected to match the seismotectonic environment. The expected values of seismic acceleration generated by an earthquake are compared with threshold values and a warning message is issued to the facilities supervisors when the ground acceleration exceeds design values. Threshold values related to secondary seismic effects (e.g., seismically induced landslides, debris flow) which could affect facilities integrity are also considered in the alert system. Threshold values are defined considering project seismic and geohazard documents, to summarize strong ground motion parameters that could potentially trigger damaging seismic geohazards, and project design documents to collect all data about seismic design of the assets. Monitoring intervals are defined based on the documentation screening. Several alarm levels are selected, based on the potential severity of earthquake effects. The more severe levels of ground motion, with high damage potential, can trigger recommendation for inspection. Novel/Additive Information Asset integrity and safety are key drivers in the offshore petroleum industry. Safety performance with respect to earthquakes is a fundamental issue in all seismic prone areas. The seismic alert system presented highlights, in near real time, earthquakes that are potentially critical for structures in an Oil and Gas field. This allows the owners to make quick decisions and plan necessary intervention regarding assets affected directly or indirectly by earthquakes. Exploiting the wide background of knowledge in engineering and geoscience and the modern availability of global earthquake data, the tool can provide useful assistance in managing asset integrity, regardless of the availability of local seismic networks or strong motion stations.


Sign in / Sign up

Export Citation Format

Share Document