Anionic Surfactants Removal and Biodegradation in a Large Treatment Plant

1992 ◽  
Vol 26 (9-11) ◽  
pp. 2547-2550 ◽  
Author(s):  
P. Romano ◽  
M. Ranzani

A full scale study was conducted to investigate the destination of LAS (Linear Alkylbenzene Sulfonate) in Italy's greatest WWTP (Waste Water Treatment Plant): the Turin central plant. Specific LAS data, using established HPLC techniques, have been obtained in the influent and effluent streams, in the dissolved phase (waters) and in the adsorbed one (suspended solids and sludges) to reach a complete mass balance. LAS removal higher than 99% and LAS biodegradation ca. 85% have been observed. Attention has been also given to LAS intermediates of biodegradation, namely the sulfo fenil carboxylaters (SPC) resorting to HPLC and GC-MS techniques, the latter after derivatization. On the basis of SPC data it is possible to measure esperimentally also the biodegradation in sewers before the WWTP (at least 12%) and the mineralization degree of LAS in the WWTP (ca. 80% vs. total biodegraded LAS). The impact of the WWTP on the LAS concentration of the Po river waters has been also considered.

1996 ◽  
Vol 68 (7) ◽  
pp. 1179-1186 ◽  
Author(s):  
Stephen D. J. Booth ◽  
Daniel Urfer ◽  
Gerard Pereira ◽  
Karl J. Caber

2013 ◽  
Vol 8 (2) ◽  
pp. 263-274 ◽  
Author(s):  
P. Ragazzo ◽  
L. Falletti ◽  
N. Chiucchini ◽  
G. Serra

Energy saving is an ever increasing need not only as a result of the growth in energy global demand and as a result of progressive erosion of supply sources. Another reason is that the environmental impact deriving from energy use is becoming more and more a reason for concern (60% increase of CO2 emissions over the last 30 years). Rationalizing energy use therefore is a goal in relation to global energy policies. Recently the European Union has developed a plan to reduce energy consumption (20% by 2020): it has issued rules and guidelines targeted at efficiency improvement in different areas such as infrastructure, products, processes and services. Energy saving is therefore a must in wastewater treatment, but one needs to achieve this target without damaging the process. That said, the objective could be reached only by acting contemporarily on technologies and relative selection criteria, designing procedures and, last but not least, Waste Water Treatment Plant monitoring and management practices. This paper focuses on these different areas pointing out opportunities, benefits and possible setbacks in relation to process performance, highlighting the impact of management operations. Starting from simple management variables, it also contains an example concerning the necessary instruments and the coordination of controls needed to regularly evaluate intervention needs and available margins. This paper also deals with the consequences of technologies encouraged as solutions for stable and effective processes, but which are in clear contrast to energy saving goals.


2017 ◽  
Vol 15 (5) ◽  
pp. 788-798 ◽  
Author(s):  
Cemil Kürekci ◽  
Muhsin Aydin ◽  
Mustafa Yipel ◽  
Mohammad Katouli ◽  
Aycan Gündoğdu

In this study, the presence of extended spectrum β-lactamase (ESBL)-producing Escherichia coli in aquatic environments (the Orontes River and an urban wastewater) was investigated. Fifty-four E. coli strains resistant to cefotaxime were isolated from the river waters and nearby waste water treatment plant and screened for ESBL gene variants, different classes of integrons and sulfonamide resistance genes. The ESBL-producing E. coli strains were further characterized by PhP-typing system, phylogenetic grouping and antimicrobial susceptibility testing. Of the 54 ESBL-producing strains, 14 (25.9%) belonged to four common PhP types and the remaining were of single types. CTX-M type ESBL genes were identified in 68% of the isolates. The most predominant specific CTX-M subtype identified was blaCTX−M−15 (n = 36), followed by blaCTX−M−1 (n = 1). None of the isolates were SHV and OXA positive. Most of the ESBL positive isolates (n = 37; 68.5%) were harboring sul gene. This study indicates a widespread distribution of CTX-M-15 producing E. coli strains in the surface waters in part of Turkey, suggesting an aquatic reservoir for ESBL genes.


2016 ◽  
Vol 9 (2) ◽  
Author(s):  
Dinda Rita K. Hartaja ◽  
Imam Setiadi

Generally, wastewater of nata de coco industry contains suspended solids and COD were high, ranging from 90,000 mg / l. The high level of of the wastewater pollutants, resulting in nata de coco industry can not be directly disposed of its wastewater into the environment agency. Appropriate technology required in order to process the waste water so that the treated water can meet the environmental quality standards that are allowed. Designing the waste water treatment plant that is suitable and efficient for treating industrial wastewater nata de coco is the activated sludge process. Wastewater treatment using activated sludge process of conventional (standard) generally consists of initial sedimentation, aeration and final sedimentation.Keywords : Activated Sludge, Design, IPAL


1991 ◽  
Vol 23 (4-6) ◽  
pp. 825-834 ◽  
Author(s):  
T. H. Lessel

The upgrading and nitrification was required for the waste water treatment plant in Geiselbullach. As space for more aeration tanks was not available, the possibility of increasing the MLSS by the use of submerged bio-film reactors was tested in a half technical scale pilot plant with three different reactor materials. Each tested reactor material caused a significant increase of MLSS and the nitrification reaction. The rope-type material was selected for the practical application, as it had not the same disadvantages of the other tested systems, which proved operational problems. After one year of continuous operation for nitrification in the full scale plant the influences on the biomass characteristics were investigated. Design criterias and details and operational data are reported.


1991 ◽  
Vol 24 (10) ◽  
pp. 161-170 ◽  
Author(s):  
M. D. Sinke

Until a century ago, The Hague's waste water was discharged directly into the city's canals. However, the obnoxious smell and resultant pollution of local waters and beaches then necessitated the implementation of a policy of collecting and transferring waste water by means of a system of sewers. By 1937, it was being discharged, via a 400 metre-long sea outfall, directly into the North Sea. By 1967, however, the increasing volume of waste water being generated by The Hague and the surrounding conurbations called for the construction of a primary sedimentation plant. This had two sea outfalls, one 2.5 km long and the other 10 km long, the former for discharging pre-settled waste water and the latter for discharging sludge directly into the North Sea. This “separation plant” was enlarged during the period 1986-1990. On account of the little available area - only 4.1 ha - the plant had to be enlarged in two stages by constructing a biological treatment section and a sludge treatment section with a capacity of 1,700,000 p.e. (at 136 gr O2/p.e./day). In order to gain additional space, a number of special measures were introduced, including aerating gas containing 90% oxygen and stacked final clarifiers. Following completion of the sludge treatment section, it has become possible, since 1st May 1990, to dump digested sludge into a large reservoir (“The Slufter”), specially constructed to accommodate polluted mud dredged from the Rotterdam harbours and waterways. As a result of these measures, there has been a reduction of between 70% and 95% in North Sea pollution arising from the “Houtrust” waste water treatment plant. Related investment totalled Dfl. 200 million and annual operating and maintenance costs (including investment charges) will amount to Dfl. 30 million. Further measures will have to be taken in the future to reduce the discharge of phosphorus and nitrogen. So this enlargement is not the end. There will be continued extension of the purification operations of the “Houtrust” waste water treatment plant.


1992 ◽  
Vol 25 (4-5) ◽  
pp. 225-232
Author(s):  
C. F. Seyfried ◽  
P. Hartwig

This is a report on the design and operating results of two waste water treatment plants which make use of biological nitrogen and phosphate elimination. Both plants are characterized by load situations that are unfavourable for biological P elimination. The influent of the HILDESHEIM WASTE WATER TREATMENT PLANT contains nitrates and little BOD5. Use of the ISAH process ensures the optimum exploitation of the easily degradable substrate for the redissolution of phosphates. Over 70 % phosphate elimination and effluent concentrations of 1.3 mg PO4-P/I have been achieved. Due to severe seasonal fluctuations in loading the activated sludge plant of the HUSUM WASTE WATER TREATMENT PLANT has to be operated in the stabilization range (F/M ≤ 0.05 kg/(kg·d)) in order not to infringe the required effluent values of 3.9 mg NH4-N/l (2-h-average). The production of surplus sludge is at times too small to allow biological phosphate elimination to be effected in the main stream process. The CISAH (Combined ISAH) process is a combination of the fullstream with the side stream process. It is used in order to achieve the optimum exploitation of biological phosphate elimination by the precipitation of a stripped side stream with a high phosphate content when necessary.


1996 ◽  
Vol 33 (12) ◽  
pp. 251-254
Author(s):  
Karl Arno Bäumer ◽  
Angela Baumann

The Institute for Water and Waste Management (ISA) at the Aachen University of Technology (RWTH) verified, through semi-technical analysis, the efficiency of the planned upgrade of the Kleve-Salmorth waste water treatment plant. Additionally the allowable biological phosphorus removal limit and the scheduled simultaneous precipitation were also ascertained.