Performance intensification of Prague wastewater treatment plant

2004 ◽  
Vol 50 (7) ◽  
pp. 139-146 ◽  
Author(s):  
L. Novák ◽  
D. Havrlíková

Prague wastewater treatment plant was intensified during 1994-1997 by construction of new regeneration tank and four new secondary settling tanks. Nevertheless, more stringent effluent limits and operational problems gave rise to necessity for further intensification and optimisation of plant performance. This paper describes principal operational problems of the plant and shows solutions and achieved results that have lead to plant performance stabilisation. The following items are discussed: low nitrification capacity, nitrification bioaugmentation, activated sludge bulking, insufficient sludge disposal capacity, chemical precipitation of raw wastewater, simultaneous precipitation, sludge chlorination, installation of denitrification zones, sludge rising in secondary settling tanks due to denitrification, dosage of cationic polymeric organic flocculant to secondary settling tanks, thermophilic operation of digestors, surplus activated sludge pre-thickening, mathematical modelling.

2006 ◽  
Vol 54 (1) ◽  
pp. 101-109 ◽  
Author(s):  
A. Jobbágy ◽  
B. Literáthy ◽  
M.-T. Wong ◽  
G. Tardy ◽  
W.-T. Liu

To meet the effluent requirements given for the sensitive receiving body, the Southpest Wastewater Treatment Plant of Budapest, Hungary uses a combined activated sludge-biofilter system with chemical precipitation for P removal. Causes of the proliferation of glycogen accumulating organisms (GAOs) observed in the unaerated/oxic activated sludge unit of this system were investigated both in full-scale and in lab-scale experiments combined with a detailed analysis of the microbial communities. Concentration profile measurements throughout the 8-stage activated sludge unit indicated anaerobic conditions in the first two unaerated reactors and low orthophosphate level (<1 mg l−1) in all of the stages that could not be attributed to the influent quality, but to Fe (III)-dosing to the returned activated sludge. Microbiological analysis revealed the presence of GAOs from the GB group in the Gammaproteobacteria and occasionally tetrad-forming organisms from Actinobacteria, and the absence of Rhodocyclus-related polyphosphate accumulating organisms (PAOs) in the activated sludge samples. Comparative lab-scale studies carried out in two identically arranged UCT-systems with staged anoxic reactors also confirmed that Fe (III)-dosing may result in phosphorus deficiency of the microbial niche, leading to the suppression of growth and EBPR activity of PAOs and to the proliferation of GAOs.


Author(s):  
Li He ◽  
Tao Tan ◽  
Zhixi Gao ◽  
Leilei Fan

Previous studies on the water quality of surface runoff often focused on the chemical oxygen demand (COD), nitrogen, phosphorus, and total suspended solid (TSS), but little is known in terms of the inorganic suspended solids (ISS). This research investigated the effects of ISS carried by surface runoff on the treatment efficiency of the pretreatment facilities and the ratio of mixed liquor volatile suspended solid to mixed liquor suspended solid (MLVSS/MLSS) of the activated sludge in a wastewater treatment plant (WWTP) with the anaerobic-anoxic-oxic (AAO) process in Chongqing city, China. The results showed that the surface runoff had a long-lasting impact on the grit removal capacity of the grit chamber, affecting the normal operation after the rainfall. In contrast, the primary sedimentation tank showed strong impact resistance with higher removal rates of COD, TSS, and ISS. Nonetheless, the primary settling tank aggravates the removal of organic carbon in sewage during rainfall, having a negative impact on subsequent biological treatment. The ISS in the surface runoff could increase the sludge concentration and decrease the MLVSS/MLSS ratio. After repeated surface runoff impact, the MLVSS/MLSS ratio in the activated sludge would drop below even 0.3, interrupting the normal operation of WWTP.


1990 ◽  
Vol 22 (7-8) ◽  
pp. 131-138
Author(s):  
Ahmed Fadel

Many of Egypt's cities have existing treatment plants under operation that have been constructed before 1970. Almost all of these treatment plants now need rehabilitation and upgrading to extend their services for a longer period. One of these plants is the Beni Suef City Wastewater Treatment Plant. The Beni Suef WWTP was constructed in 1956. It has primary treatment followed by secondary treatment employing intermediate rate trickling filters. The BOD, COD, and SS concentration levels are relatively high. They are approximately 800, 1100, and 600 mg/litre, respectively. The Beni Suef city required the determination of the level of work needed for the rehabilitation and upgrading of the existing 200 l/s plant and to extend its capacity to 440 l/s at year 2000 A description of the existing units, their deficiencies and operation problems, and the required rehabilitation are presented and discussed in this paper. Major problems facing the upgrading were the lack of space for expansion and the shortage of funds. It was, therefore, necessary to study several alternative solutions and methods of treatment. The choice of alternatives was from one of the following schemes: a) changing the filter medium, its mode of operation and increasing the number of units, b) changing the trickling filter to high rate and combining it with the activated sludge process, for operation by one of several possible combinations such as: trickling filter-solids contact, roughing filter-activated sludge, and trickling filter-activated sludge process, c) dividing the flow into two parts, the first part to be treated using the existing system and the second part to be treated by activated sludge process, and d) expanding the existing system by increasing the numbers of the different process units. The selection of the alternative was based on technical, operational and economic evaluations. The different alternatives were compared on the basis of system costs, shock load handling, treatment plant operation and predicted effluent quality. The flow schemes for the alternatives are presented. The methodology of selecting the best alternative is discussed. From the study it was concluded that the first alternative is the most reliable from the point of view of costs, handling shock load, and operation.


1992 ◽  
Vol 25 (4-5) ◽  
pp. 203-209 ◽  
Author(s):  
R. Kayser ◽  
G. Stobbe ◽  
M. Werner

At Wolfsburg for a load of 100,000 p.e., the step-feed activated sludge process for nitrogen removal is successfully in operation. Due to the high denitrification potential (BOD:TKN = 5:1) the effluent total nitrogen content can be kept below 10 mg l−1 N; furthermore by some enhanced biological phosphate removal about 80% phosphorus may be removed without any chemicals.


1995 ◽  
Vol 31 (12) ◽  
pp. 171-183 ◽  
Author(s):  
M. M. Saqqar ◽  
M. B. Pescod

The performance of the primary anaerobic pond at the Alsamra Wastewater Treatment Plant in Jordan was monitored over 48 months. Overall averages for the removal efficiencies of BOD5, COD and suspended solids were 53%, 53% and 74%, respectively. An improvement in removal efficiency with increase in pond water temperature was demonstrated. A model, which takes into account the variability of raw wastewater at different locations, has been developed to describe the performance of a primary anaerobic pond in terms of a settleability ratio for the raw wastewater. The model has been verified by illustrating the high correlation between actual and predicted pond performance.


1997 ◽  
Vol 36 (2-3) ◽  
pp. 1-8 ◽  
Author(s):  
P. Grau ◽  
B. P. Da-Rin

An unusually severe case of toxicity accompanied by activated sludge filamentous bulking was observed at the wastewater treatment plant Sao Paulo-Barueri. Treatment efficiency of the plant, operated without major problems for more than five years before, was significantly hindered for almost six months. Occurrence of toxic shocks was confirmed partly directly but mostly indirectly by inhibition of nitrification and biological phenomena related to toxicity. Several measures adopted, including the recycled activated sludge chlorination, are described in the paper.


Sign in / Sign up

Export Citation Format

Share Document