scholarly journals Causes of Delayed Payment in Construction Project in Nigeria

2020 ◽  
Vol 5 (9) ◽  
pp. 1049-1053
Author(s):  
Onyekachukwu G. Odenigbo ◽  
Koleola T Odusami ◽  
Kevin C. Okolie ◽  
Vincent C. Okafor

Delay in payment to contactors and other relevant parties have caused serious problem on the successful execution of construction projects in the country. It causes several problems to the contractor and other participants. The aim of this study is to determine the causes of delayed payments in the construction industry. The objective of this study is to identify the causes of delayed payment. In order to obtain valid data for the study, questionnaires were designed and distributed to a randomly selected sample of one hundred individuals among contractors, subcontractors, consultant and clients in the Nigerian construction industry. In total, eighty five completed questionnaires were returned and then analysed statistically. The total mean score was used to determine the ranking of the results of the study. Client’s disagreeing on the valuation of work done, slow processing of variation orders and poor quality of works were the major causes of delayed payment identified in the study. It was recommended that the stakeholders should work as a team in the execution of project to avoid bottlenecks usually encountered in agreeing contractors‟ payment. In conclusion, if the necessary action can be enforced, the problem of delayed payment can be reduced drastically.

Author(s):  
Peter Dodzi Kwasi Agbaxode ◽  
Sitsabo Dlamini ◽  
Ehsan Saghatforoush

A meta-synthesis approach was used to identify, synthesize, and categorize appropriately factors in the literature that contribute to design documentation quality. The categories include factors on quality attributes, quality indicators, and quality-influencing factors. Findings indicate that the quality of design documentation in practice is unsatisfactory, therefore, there is a need for collaboration between the owner, designers, and end-users to improve design documentation quality. The results offer pragmatic data on design documentation quality in the construction industry between the years 1992 and 2019. However, further research on the significant impacts of poor-quality design documentation on construction projects is recommended.


2019 ◽  
Vol 277 ◽  
pp. 03013
Author(s):  
Noraziah Mohammad ◽  
Zabidi Hamzah

Variation order refers to any changes from the scope, plan, specification or contract document in the construction project. This changes of work is a common problem in construction projects in Malaysia. It is inevitable in any construction project and this problem can become more serious when variation order causes work progress to be impaired as a results it increased the construction time and cost that affects the construction industry in Malaysia. This paper critically review the causes of variation order in the construction industry on the double-storey terrace housing project in Malaysia. The discussions began with the construction industry in Malaysia and then related parties involved in the construction industry. The extensive local and abroad literature review on the definitions of variation order and analysis of past studies conducted on variation order and the previous study of the prediction model of variation. The extensive literature on variation order in the construction of building project may help to improve the performance in term of time, cost and quality of the construction of building projects in Malaysia.


2018 ◽  
Vol 7 (4.35) ◽  
pp. 307 ◽  
Author(s):  
N.S. Azman ◽  
M. Z. Ramli ◽  
M. H. Zawawi

Quality management is essential to improve success in project implementation by using Industrialized Building System (IBS). The development of construction industry in Malaysia is encountering a relocation from ordinary techniques to a more efficient and automated strategy which is by utilizing IBS.There are a few issues in overseeing IBS construction projects which prompt low qualities such as hiring non-expertize in construction, using low quality of materials and problem with management. Therefore, this paper aim is to determine the various success factors affecting the quality management of construction project that using IBS and ranked the success factors. Found that 87 factors from review papers and two most significant factors affecting quality management in IBS are high ranked which is appointment of high experience technical team, using high quality components and materials with overall percentage 2.48% and 1.86%. However, some of the factors are repeatedly listed due to high affecting to quality.


2015 ◽  
Vol 22 (5) ◽  
pp. 474-492 ◽  
Author(s):  
Farzad Khosrowshahi

Purpose – The focus of this work is on the client-designer interface where decisions have significant impact over the lifecycle of the project. Therefore, the briefing stage is examined in the context of clients’ needs which is divided into project-based strategy and broader clients’ strategy. The purpose of this paper is to address the pitfalls in the briefing process which has been attributed to the shortcomings in the client-designer communication interfaces. This will be achieved by developing an automated brief generation framework. The research examines the efficiency of standard approaches to modelling and design, and the benefits that these methodologies have offered to the computer industry. The work reviews the similarities between the two industries and argues in support of the potential benefits in adopting a standard methodology in the construction industry. The structure upon which the framework is developed is based on system analysis and design methodology (SSADM) which has proven to be an effective platform used within the software development industry. Design/methodology/approach – SSADM is an established methodology within the software development industry. The paper will demonstrate that due to fundamental similarities between the construction and software development industries, SSADM is likely to offer a viable platform upon which an automated enhanced brief generation model is developed for use in the construction industry. The construction design and construction process will be mapped on SSADM high-level definition before focusing and honing on the design phase. The methodology for the development of the framework will be based on the rationalist approach of generating knowledge through reasoning leading to model-building. Findings – A model that is based on SSADM is proposed for the design development phase of construction projects. In order to shape the project strategy, the model considers the combined role of clients’ requirements with organisation strategy and environmental factors. The paper has shown that it is feasible to increase the automation of the briefing process and enhanced the briefing output. The model here does not diminish the importance of direct communication between the client and the design team. It provides a more structured way of doing so, while taking advantage of vast array of data and technology in order to improve the brief outcome. Research limitations/implications – From practical perspective, the proposed framework is in its formative stage, thus requiring incremental refinement through several case studies. This is particularly true about the AI components of the system which typically rely on extensive data representing the real-case scenarios. Therefore, the work invites further research into the examination of various parts as well as the overall system. Practical implications – There are several ways by which construction projects are procured. There may be fluctuation in their rate of usage, but while there is no indication of any procurement option fading, new ones such as PPP and PFI are periodically introduced. The existence of this diversity is indicative of the fact that the industry tends to respond to problems rather than attempting to instigate a measured solution supported by theoretical underpinning. Subsequently, there have been suggestions of a communication and information discourse between actors and within processes involved in project lifecycle. This project is aimed at addressing the gap in the client-designer communication. The automated approach to brief generation will lead to better briefs while reducing ambiguities as well as the overhead associated with brief generation. Social implications – The quality of project brief has a significant impact on decisions at the design stage. In turn, these decisions will influence all phases of construction project lifecycle. The briefing session and requirement analysis of a construction project can be very difficult for inexperienced clients particularly for complex projects. Therefore, there is potential for the process of client-requirement-analysis to be optimised. The work promises to improve the quality of the briefing process, thus helping clients to realise their intended objectives and minimise resource waste. Originality/value – The work builds on the commonalities of the construction and software development industries and takes advantage of the advancements in the latter. In doing so, project quality is defined quantitatively which is used to develop project strategy in a three-dimensional space. The development of the model was also contingent upon enhancement of artificial neural network structure.


Author(s):  
Reneiloe Malomane ◽  
Innocent Musonda ◽  
Chioma Sylvia Okoro

The fourth industrial revolution (4iR) technologies offer an opportunity for the construction industry to improve health and safety (H&S) compliance. Therefore, implementing the technologies is of top priority to improve the endless H&S incidents in construction projects, which lead to poor quality of work, late project delivery, and increased labour injury claims. Central to improving the nature of work and other industrial processes, the 4iR technologies have emerged. Concurrent with this trend is the importance of 4iR technologies in enhancing health and safety performance on construction sites. However, the implementation of 4iR technologies in the construction industry is faced with various challenges. Therefore, this paper reports on a study aimed at examining the challenges associated with implementing 4iR technologies in the construction sector in South Africa towards effective management of H&S. The study followed a systematic literature review, data collection using a questionnaire survey and thereafter, descriptive, and inferential analyses were conducted. The findings revealed that the implementation of 4iR technologies is challenged by a lack of adequate relevant skills, the unavailability of training capacities, expensive technologies, and negative perceptions such as fear of job loss by industry professionals. The findings are essential for the advancement of H&S research and implementation. In addition, the findings are important to industry decision-makers in order to elevate their awareness and promote the use of 4iR technologies to manage construction activities. The study implications include the need for the construction industry to collaborate with higher education institutions to conduct research and include 4iR in the curriculum.


2021 ◽  
Vol 353 ◽  
pp. 01009
Author(s):  
Zhixin Sun

With the development of the construction industry, the applied building materials are becoming more and more diversified. As we all know, the performance and quality of the building materials themselves will have a direct impact on the quality of the construction project, which is related to the usability and safety of the construction project. If the quality of building materials cannot be inspected effectively, the probability of safety accidents in construction projects will be greatly increased, which will seriously threaten people’s lives and property. This article analyzes the development process of building material testing and testing, and on the basis of summarizing the importance of building material testing and testing, it analyzes several key aspects of building material testing and testing.


2020 ◽  
Vol 9 (1) ◽  
pp. 1
Author(s):  
Qian Yang

<p>With the rapid development of social economy, the demand for new energy is also increasing, and then the problem of large consumption also has a negative impact on the development of the construction industry. Under the concept of green building, the design and construction units pay more attention to energy conservation and environmental protection, so they actively use photovoltaic new energy in the field of electrical energy conservation of construction projects, so as to improve people's quality of life. Starting from the principles and characteristics of building electrical energy conservation, this paper discusses the methods of building electrical energy conservation, and analyzes how to use photovoltaic new energy in the field of building electrical energy conservation, hoping to better practice the concept of energy conservation.</p>


2021 ◽  
Vol 14 ◽  
pp. 1-9
Author(s):  
Jeffrey Boon Hui Yap ◽  
Shi Min Tan

Construction practitioners recognise that rework is undesirable due to the detrimental effects. While rework literature has examined rework causation factors in construction projects, the problem continues to plague the industry resulting in poor delivery performance. To better understand this phenomenon and given the scarcity of Malaysian-based rework study, a questionnaire survey involving 130 Malaysian construction practitioners (consultants, contractors and clients) were undertaken to obtain feedback about nature, implications, causes and solutions for rework. Data were analysed using descriptive statistical techniques to prioritise the variables studied. From the analyses, rework is a causal factor for delays and cost overruns, higher wastage and productivity inhibitor. The findings revealed the leading causes of rework are poor quality management, improper planning, lack of communication, design changes and poor subcontractor management. Some practical rework minimisation approaches are also suggested to better manage and prevent rework towards enhanced project performance.


2021 ◽  
Vol 15 (S1) ◽  
pp. 53-69
Author(s):  
Mohd Shazreen Seman ◽  
Mohd Reza Esa ◽  
Mohd Reeza Yusof

In recent decades, the construction industry has been widely criticized for its lack of efficiency and productivity, and it has been shown that the Malaysian construction industry records poor quality on its projects. To overcome this issue, the Technical Committee on Quality Assessment in Construction with the support of the Construction Industry Development Board (CIDB) has introduced Quality Assessment System in Construction (QLASSIC). QLASSIC is a scoring system that is used to assess and evaluate the performance of construction buildings. It is based on the Construction Industry Standard (CIS 7:2006). Unfortunately, this assessment system had poor implementation since its introduction in November 2006. QLASSIC was not extensively implemented and was taken lightly by the contractors and developers in Malaysia. There are still a huge number of contractors that are not aware of QLASSIC even the big construction companies. Thus, this research is aimed at investigating the contractor’s perspective towards the implementation of QLASSIC in the construction industry in Malaysia. Three objectives are developed to achieve the aim: (1) identification of the needs to implement QLASSIC; (2) investigation of issues and challenges to implement QLASSIC and (3) recommendation of strategies to implement QLASSIC. Structured questionnaire surveys were distributed to the G7 and G6 contractors in the Klang Valley area; which may have or may not have experience in implementing QLASSIC in their projects. The result revealed that majority of the respondents were aware and understand the needs of QLASSIC implementation, but there were still few who were unfamiliar with the QLASSIC. The current level of implementation of QLASSIC in Malaysia is still not satisfactory due to several issues and challenges acting as barriers to its implementation. Therefore, the initiatives from the government are important to promote QLASSIC implementation in the construction industry. By doing this, the contractors would be aware of the implementation of QLASSIC in the construction industry. The significance of this research is that it will assist contractors and other construction players in comprehending the implications and importance of QLASSIC implementation.


Author(s):  
Emmanuel Coleman ◽  
Isaac Kwesi Nooni ◽  
Samuel Korenteng Fianko ◽  
Linka Dadzie ◽  
Ebenezer Nickson Neequaye ◽  
...  

Purpose This study aims to investigate the attainment of quality in Government of Ghana’s (GoG) infrastructural projects through effective contract management and especially, relating to qualification, competence and experience of supply chain stakeholders. Design/methodology/approach A survey questionnaire and field observations were used to collect primary data from staff of the education ministry and construction professionals. Documentary analyses of contract documents were also undertaken. Findings The results show that executing agencies’ failure to apply appropriate contract management processes was linked to the gap between stakeholders’ knowledge and actual practice. This was confirmed by Spearman’s rho tests of correlation between overall mean ranks given by professionals and non-professionals, which indicated strong agreement between those groups. Factors such as contractors’ engagement of unqualified supervisory staff, lack of proper projects monitoring and evaluation by executing agencies mainly contribute to the poor quality of work. Research limitations/implications Investigations were limited to the Funds and Procurement Management Unit of the Ministry of Education, Metropolitan, Municipal and District Assemblies and local contractors. Nonetheless, the methodology used could be used in future studies to analyse the socio-economic implications on the quality of education infrastructure. Practical implications Construction is booming in Ghana but the capacity to improve the work quality through effective contract management is limited. However, with the effort of stakeholder and statutory bodies’ support in capacity building initiatives, GoG projects could offer some novel solutions to improve quality of work. Social implications Construction industry professionals and students’ knowledge and perception on construction industry and contract management is significantly improved. Originality/value This study provides information on respondents’ knowledge on contract management process, which, if not properly understood, can lead to poor quality of work and loss of money.