scholarly journals Software Project Management Systems Using Kanban Method in the CV. Primavisi Globalindo

Author(s):  
Muhammad Aliyya Ilmi ◽  
Fajar Pradana ◽  
Widhy Hayuhardhika Nugraha Putra

Reducing the risk of failure in working on software projects is one of the successes for the company. It can be done by implementing project planning management properly. One important aspect of project management planning is scheduling. Scheduling includes recording human resources and tasks in the project. The Kanban method is one of the methods used to overcome problems in controlling project schedules. This study aims to develop a project scheduling system that applies the Kanban method. In this research, project management and scheduling system will be developed using the Kanban method. This system expected to be able to assist companies in handling projects. Kanban was chosen because it can easily respond to project changes, easily implemented, and company needs. In this study, unit testing was performed on the system's three main features and tested the validity of the system's 49 functional requirements. The usability test produces a value of 76. Based on the validation and usability test results, it can be concluded that the system is included in the acceptable category.

2009 ◽  
pp. 1358-1374
Author(s):  
Roy Gelbard ◽  
Jeffrey Kantor ◽  
Liran Edelist

Currently, there is no integration among CASE tools (computer aided software engineering, also named AMD tools, analysis modeling and design), costing tools, and project management (PM) tools. Not only are there no integrated tools, but there is also no conceptual integration among software engineering (SE) aspects and accounting-costing aspects of software projects within PM tools. PM tools, as well as costing tools are used not only for tracking and controlling an ongoing software project, but also at the very beginning stages of the project, in which critical estimations concerning budget and time frame are made. In order to have a firm, robust, and accurate planning, project planning should be based directly upon raw SE components-objects, that is, upon analysis and design components-objects.


Author(s):  
Aravindhan K

Cost estimation of software projects is risky task in project management field. It is a process of predicting the cost and effort required to develop a software applications. Several cost estimation models have been proposed over the last thirty to forty years. Many software companies track and analyse the current project by measuring the planed cost and estimate the accuracy. If the estimation is not proper then it leads to the failure of the project. One of the challenging tasks in project management is how to evaluate the different cost estimation and selecting the proper model for the current project. This paper summarizes the different cost estimation model and its techniques. It also provides the proper model selection for the different types of the projects.


2014 ◽  
Vol 9 (2) ◽  
pp. 101
Author(s):  
Alusyanti Primawati ◽  
Dewi Mustari

The software is an intermediary between system hardware computer with user as human. Based on the emerging software projects because of the importance of the functions already affects many functions in various aspects. Software projects that have become this need ultimately require management actions to manage the process in the project. Project management is necessary for the success of the project. Bereau Information System PT. X is one part of a company that provides software for functional PT. X. Analysis results from the concept of software project management information systems Bureau at PT. X when the process of designing application systems information accounting PT. X aims to answer how concept of project management Information Systems Bureau in designing the Accounting Information System applications. The methods used in this research is the study of the library with a general empirical approach based on experience and theories related to project management especially in software projects. The conclusions obtained that the activity of the management software on System Information Bureau is in compliance with the application of existing theory, but science is constantly evolving so as to do the development management activities after conducting evaluation regularly for the maintenance of long-term software project.


2020 ◽  
Vol 18 (3) ◽  
pp. 141-149
Author(s):  
Alizhan Tulembayev ◽  
Aliya Adilova ◽  
Askhat Serikbekuly ◽  
Dina Seidaliyeva ◽  
Yerlan Shildibekov

Nowadays, leading world companies widely use methodology, standards, and project management tools in many areas of project-oriented activities, including investment, innovation, and information projects. Last years the implementation and functioning of the country’s enterprises’ project management system have been actively discussed in Kazakhstan.This work aims to identify critical processes of project management planning that affect the effectiveness of projects at the enterprise of the military-industrial complex of Kazakhstan. For this purpose, a survey of top managers of defense industry companies was conducted. A total of 28 respondents were interviewed, working at 18 enterprises of the military-industrial complex of the Republic of Kazakhstan and directly participating in the implementation of projects. Data were personally collected by a questionnaire survey conducted during 2019. To verify the formulated model’s assumptions and success, correlation analysis, and other relevant tests were used. Using the model of project management planning quality (PMPQ), process efficiency has been assessed, and critical factors for the effectiveness of defense industry projects have also been identified. The results show that the Republic of Kazakhstan’s defense industry complex projects has a low level of efficiency and an average score for the use of project planning processes. Project efficiency evaluation has also revealed critical knowledge areas for defense projects like human resource management, schedule development, and define scope. The research expands knowledge in PM, revealing the importance of planning processes for the defense industry that need more focus to achieve top-level success and effectiveness of projects. AcknowledgmentThis study is the second part of grant AP05134488 that has been funded by the Ministry of Education and Science of the Republic of Kazakhstan.


Author(s):  
Roy Gelbard ◽  
Jeffrey Kantor ◽  
Liran Edelist

This study proposes and prototypes a model that integrates these three aspects of software projects by automatically mapping SE objects and accounting–costing objects into PM objects. To validate the feasibility of the model and without loss of generality, it is demonstrated using former research platform focused on conversion of data flow diagrams (DFD), which are actually full enterprise set of use cases diagrams reflecting entire system-software project into Gantt charts.


2020 ◽  
Vol 13 (36) ◽  
pp. 3785-3800
Author(s):  
Kamal Uddin Sarker ◽  

Objectives: This research addresses the causal relationship among processes, tasks, resources, and stakeholders of the software projects to improve the success rate that is 31% only now (CHAOS report 2019). Methods: A software project management framework is developed based on the findings of an empirical study on recent commonly used methodologies and root cause analysis on the reasons for project failure. The causeeffect relationship is prioritized by Structural Equation Modeling (SEM) to develop the Explicit Specification Framework (ESF). The framework is tied to the pinpointing with ontology for formal presentation, descriptive logic for unambiguous information specification, and ikigai for decision-making.Findings: The proposed framework is evaluated by a group of experts and their average scope is evaluated by a group comparison mechanism called Grey Rational Analysis (GRA). The evaluation process considered 6 parameters and compared it with 4 commonly used project management approaches. The highest GRA rank is found for the average of six distinct parameters though it is comparatively more complex for explicit documentation. The three-layer architecture of ESF remarks on roles, functions, and respective stakeholders in each layer presented by a comprehensive comparison study with literature and found that it enhances formal practice, sustainability, and management capability. ESF is easy to implement for distributed project management and improving automation facilities in the software industries.Novelty/Application: Artificial intelligence, the Internet of things, and big data would be common elements of a software project and ESF would meet the demand for project information specification, management, and control. Keywords: Software Project Management; Software Quality Control; methodology; multi- criteria decision making; structural educational modeling; ontology


2020 ◽  
Vol 6 (3) ◽  
pp. 27-34
Author(s):  
E.J. Robles Gómez ◽  
J.A. Flores Lara ◽  
J.C. Ontiveros Neri

El juego getKanban es una herramienta para enseñar la metodología Kanban y SCRUM de una manera divertida. Facilita la enseñanza de la gestión de proyectos de software a través de un juego de mesa, donde los jugadores aprenden a formular estrategias de gestión de proyectos y las implementan para elaborar proyectos de calidad en tiempo y forma. El presente artículo muestra los resultados de la implementación del juego en una institución educativa de nivel superior, con alumnos de Ingeniería en Sistemas Computacionales de octavo semestre. Se puede apreciar que al utilizar este juego ayuda de manera efectiva a la enseñanza de Kanban y SCRUM, para la gestión de proyectos de software. Por lo cual se recomienda poder implementar este tipo de juegos como estrategia didáctica para la enseñanza/aprendizaje de Ingeniería de Software aplicada a la Gestión de Proyectos de Desarrollo de Software. The game Kanban is a tool to teach the methodology in a fun way. It facilitates the teaching of software project management through where players learn to formulate strategies and implement them to develop quality projects on time Delivery. This article shows the results of the implementation of the game in an educational institution of higher level, with students of Computer Systems Engineering eighth semester. It can be seen that by using this game it helps in an effective way to teach Kanban for the management of software projects. Therefore, it is recommended to be able to implement this type of games as a didactic strategy for the teaching / learning of Software Engineering applied to the Management of Software Development Projects


Author(s):  
Moshe Dayani ◽  
Roy Gelbard

The current research has two main objectives: 1) Integration of the system analyst's products together with the project manager's work, via handshaking of software tools used for these tasks (Software modeling tools, Project management tools, as well as Word and Excel files). 2) Simulation of the entire project's problem space subject to organization's policy and constraints in order to achieve best project planning in the given situation. For this purpose, a rule-based system, developed in this study, utilizes a simulation of entire project's problem-space, which is a Cartesian product composed of all system elements (as defined in the software modeling tool), and organization's policy, preferences and constraints, via a specific user interface (see Figure 1). Then the project manager can choose, by simple filtering, the appropriate planning, and the Gantt-chart and all plans' details are automatically exported to the Project Management tool.


Author(s):  
Kitti Photikitti ◽  
Kitikorn Dowpiset ◽  
Jirapun Daengdej

It has been well-known that the chance of successfully delivering a software project within an allocated time and budget is very low. Most of the researches in this area have concluded that “user's requirements” of the systems is one of the most difficult risks to deal with in this case. Interestingly, until today, regardless of amount of effort put into this area, the possibility of project failure is still very high. The issue with requirement can be significantly increased when developing an artificial intelligence (AI) system, where one would like the systems to autonomously behave. This is because we are not only dealing with user's requirements, but we must also be able to deal with “system's behavior” that, in many cases, do not even exist during software development. This chapter discusses a preliminary work on a framework for risk management for AI systems development projects. The goal of this framework is to help project management in minimizing risk that can lead AI software projects to fail due to the inability to finish the projects on time and within budget.


Author(s):  
Roy Gelbard ◽  
Jeffrey Kantor ◽  
Liran Edelist

This study proposes and prototypes a model that integrates these three aspects of software projects by automatically mapping SE objects and accounting–costing objects into PM objects. To validate the feasibility of the model and without loss of generality, it is demonstrated using former research platform focused on conversion of data flow diagrams (DFD), which are actually full enterprise set of use cases diagrams reflecting entire system-software project into Gantt charts.


Sign in / Sign up

Export Citation Format

Share Document