scholarly journals Sistem Manajemen Keselamatan dan Kesehatan Kerja Di Perseroan Terbatas Nilam Sari Cipta Amrizal

2020 ◽  
Vol 12 (2) ◽  
pp. 248
Author(s):  
Syarifa Mahila ◽  
Nazifah Nazifah ◽  
Upik Ema Emilia Susanti

Limited Liability Company, Nilam Sari Cipta Amrizal, is a company engaged in the Electrical Contracting sector based in Jambi. Based on the type of business activity, this company has a high risk to Occupational Health & Safety. The purpose of this study was to determine the application of the Occupational Safety and Health Management System in the Limited Liability Company of Nilam Sari Cipta Amrizal, the obstacles faced and the efforts to solve them. Occupational health and safety is one of the workers' rights that must be fulfilled as regulated in Government Regulation Number 50 Year 2012. The research method used is a juridical empirical research type with an analytical approach. In this study, the authors describe the problems under study, which are arranged based on theory and related concepts to obtain a comprehensive and systematic description of the occupational safety and health management system, data sources from field research using interview methods and literature research. Data obtained from field research and library research are processed using qualitative analysis, namely data analysis based on what is obtained from the field and literature both orally and in writing, presented in the form of logical sentences. The method used is the inductive thinking method, namely the method of thinking. from a specific nature then drawn to a general conclusion.

2019 ◽  
Vol 11 (02) ◽  
pp. 18
Author(s):  
Desi Safiarti ◽  
Yuliana Yuliana

The purpose of this research is to explain the implementation of occupational safety and health management systems in the Premier Basko Hotel F&B product department both in terms of the determination of occupational safety and health policies, occupational safety and health planning, implementation of occupational safety and health plans, monitoring and evaluation of safety performance and occupational health, review and improvement of occupational safety and health. This research is a descriptive research with qualitative data, while the method used in this study is the survey method. The data in this study were collected through observation, documentation, and interviews with 6 informants. The conclusion of this research is that the overall implementation of the occupational safety and health management system in Premier Basko Hotel's food and beverage product department is still lacking, as seen in the many things that have not been implemented in the implementation of the occupational health and safety management system, as well as many procedures that are lacking in application.


2021 ◽  
Vol 8 (12) ◽  
pp. 404-410
Author(s):  
Hotbona Novandi Tambunan ◽  
Nazaruddin . ◽  
Isfenti Sadalia

Occupational Health and Safety (K3) is aimed as an effort to create a workplace that is safe, healthy, free from environmental pollution, so that it can reduce and or be free from work accidents and occupational diseases and can have an impact on increasing work efficiency and productivity. The need for implementation and Monitoring of the Occupational Health and Safety Management System at PT. Mujur Lestari must have a good corporate culture and be able to contribute to SMK3. For that PT. Mujur Lestari makes implementation and Monitoring to minimize the risk of work accidents for employees. The sample used in this study were employees of PT. Mujur Lestari, totaling 81 people. The data collection method used a questionnaire while the analytical method used was multivariate analysis. The results showed that there was an influence between knowledge on the Occupational Health and Safety Management System (SMK3) at PT. Mujur Lestari with a tcount greater than ttable, the effect of applying the Occupational Health and Safety Management System (SMK3) with a tcount greater than ttable, the effect of Monitoring on the Occupational Health and Safety Management System (SMK3) with a greater tcount from ttable and there is no relationship between the implementation and Monitoring of the Occupational Safety and Health Management System (SMK3). The conclusion shows that the knowledge variable has a positive and significant effect on the Occupational Safety and Health Management System (SMK3), the application variable has a positive and significant impact on the Occupational Safety and Health Management System (SMK3) and the Monitoring variable has a positive and significant effect on the Occupational Safety and Health Management System. (SMK3). Keywords: Occupational Health and Safety (K3), Occupational Health and Safety Management System (SMK3).


Author(s):  
I Ketut Sutapa ◽  
Ni Kadek Sri Ebtha Yuni ◽  
I Nengah Darma Susila ◽  
I Gede Sastra Wibawa ◽  
I Made Anom Santiana

Building construction projects have a high level of risk of work accidents, especially for workers in the field. Therefore, at the time of implementation of construction work, it is necessary to evaluate the implementation of occupational safety and health management system (SMK3) to provide a sense of security to workers in the field of this research aimed at evaluating SMK3. This research uses qualitative and quantitative methods to know the implementation of SMK3, by taking data by conducting structured interviews conducted on the building construction project Ayana Nort Wing Bali. Analysis conducted a descriptive analysis based on Government Regulation of the Republic of Indonesia No.50, 2012 advanced with 12 criteria containing 166 criteria elements. The result of this study is the application of PP No. 50 of 2012 for the advanced level of 92.89% categorized as satisfactory. In addition, there are 14 that have not been implemented. This the company that the evaluation level of occupational safety and health management system (SMK3) in the building construction project Ayana North Wing Bali is the level of application is very satisfactory for the project.


2021 ◽  
Vol 1 (01) ◽  
pp. 1-6
Author(s):  
Severinus Ama Kolot

Introduction: Based on Government Regulation No. 50 of 2012, companies with more than 100 workers and have a high potential for hazards are required to implement an Occupational Safety and Health Management System (SMK3). The purpose of this study is to review the implementation of the occupational safety and health management system based on Government Regulation Number 50 of 2012 at PT Totalindo Eka Persada, the Kingland Avenue Serpong Project in 2020. Methods: This research is descriptive using a qualitative approach. The informants of this study used 2 key informants, namely the HSE Manager and construction K3 experts.Research data information is obtained from interviews, documents, and observations. Results: Based on Government Regulation Number 50 of 2012 obtained a suitability of 86.5%. The level of achievement in detail is, monitoring and evaluation of K3 performance at 75%, implementation of the K3 plan 78%, determining K3 policy 100%, and planning K3 100%. Discussion: Total value of the five elements of Government Regulation Number 50 of 2012 in the kingland avenue project of PT. Totalindo Eka Persada in 2020 is 86.5% so that the implementation of the Occupational Health and Safety Management System (SMK3) is classified as satisfactory based on the provisions required by Government Regulation Number 50 of 2012.


2018 ◽  
Vol 19 (2) ◽  
pp. 58-64
Author(s):  
Yuana Delvika

The increasingly globalized changes in the modern economy have grown rapidly in all areas of life such as industry, services, property, mining, transportation and others. But behind the progress there is a price to be paid by the people of Indonesia is the negative impact caused one of them is a disaster such as accidents, pollution and occupational diseases that resulted in thousands of people injured every year. This condition is caused by the lack of concern about safety and health (K3) in the community. Health and Safety Management System (SMK3) is regulated in Government Regulation No. 50 of 2012 on Guidelines for Implementation of Occupational Safety and Health Management System. HSE Management System is part of the overall corporate management system required for the development, implementation, achievement, assessment and maintenance of OSH obligations, in the context of risk control related to work activities for the creation of safe, efficient and productive workplaces.This research was conducted at a company that produce animal feed in Medan City. The company is building a health and safety management system in the company.The result of research on the implementation of Occupational Safety and Health Management in animal feed companies that the implementation of SMK3 in the company has followed the clauses required in PP No.50 of 2012. This is shown by the small gap between Government Regulation No.50 of 2012 with the application in company.


2020 ◽  
Vol 8 (T2) ◽  
pp. 183-187
Author(s):  
Suhartina Suhartina ◽  
Lalu M. Saleh ◽  
Syaifuddin Sirajuddin ◽  
Sumbangan Baja ◽  
Anwar Mallongi

BACKGROUND: Occupational safety and health management systems, hereinafter, in SMK3 are part of the overall company management system in the context of risk control related to work activities to create a safe, efficient, and productive workplace through efforts to prevent accidents and occupational diseases. AIM: This study aimed to evaluating the application of occupational safety and health management systems to contractors in the management area of PT Sims Jaya Kaltim based on government regulation number 50 of 2012. METHODS: The application of SMK3 is mandatory for companies with 100 employees or high risk. The evaluation research using the culinary method adopted a countenance stake evaluation model with three stages, starting with the antecedents, Transaction, and outcomes stages, in three mining companies. Data collection uses source pole, interviews, document review, and observation. RESULTS: The results of this study indicate the results of evaluating the implementation of an occupational safety and health management system at the Attendance (Input) stage in PT X based on government regulation number 50 of 2012, included in the less category where the value obtained is 55%. The results of the evaluation of the application of an occupational health and safety management system at the stage of transaction in X based on government regulation number 50 of 2012 are included in the satisfying category where the value obtained is 86%, while the outcomes obtained a value of 70.5% in the less category. PT Mandiri Herindo Adiperkasa and PT Iwaco Jaya Abadi are expected to further enhance the application of occupational safety and health management systems. CONCLUSION: The results of the evaluation of the implementation of the occupational safety and health management system (SMK3) at the Attendance (Input) stage at PT X based on government regulation number 50 of 2012 are included in the category of lacking where the value obtained is 55%. Transaction phase (Process) is included in the satisfactory category where the value gained 86%. The outcomes phase is obtained 70.5%.


Teknika ◽  
2018 ◽  
Vol 13 (2) ◽  
pp. 33
Author(s):  
Wildan Abied ◽  
Suci Febrita ◽  
Hari Setijo Pudjihardjo ◽  
Bambang Tutuko

<p><strong><em>Abstract</em></strong><em></em></p><p>Occupational Health and Safety Management System (SMK 3) is a protection system that has been prepared and designed for workers and construction services to minimize and avoid the risk of loss of time, material and the risk of workplace accidents that will be experienced by workers work. Guidelines for the Implementation of the Occupational Safety and Health Management System (SMK3) in Indonesia are found in the Minister of Manpower Regulation Number: PER.05 / MEN / 1996, Minister of Public Works Regulation No. 9 of 2008 concerning Guidelines for Construction Work Safety and Safety Management System (SMK3) in the Field of Public Works, and PP No. 50 of 2012 concerning Application of Management Systems</p><p>Occupational Health and Safety. The purpose of this study was to evaluate the implementation of the Occupational Safety and Health Management System, and to find out the steps in the implementation of the Occupational Safety and Health Management System in the Project for the Construction of the Regional General Hospital of Sunan Kalijaga Demak. Data processing is done by compiling and discussing the results of the questionnaire that has been distributed to the respondents, as well as literature studies as supporting data. The results of the study show that the overall guidelines for the Occupational Safety and Safety Management System (SMK3) have been implemented very well.</p><p> </p><p><strong><em>Keywords</em></strong><em>: SMK 3, Guidelines, RSUD Sunan Kalijaga.</em><em></em></p><p> </p><p><strong>Abstrak</strong></p><p>Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK 3) adalah sebuah sistem perlindungan yang sudah dipersiapkan dan dirancang bagi para tenaga kerja dan jasa konstruksi untuk meminimalisasi dan menghindarkan diri dari resiko kerugian waktu, materi dan dari resiko kecelakaan kerja yang akan dialami oleh para tenaga kerja. Pedoman Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) di Indonesia terdapat pada Peraturan Menteri Tenaga Kerja Nomor : PER.05/MEN/1996, Peraturan Mentri PU No. 9 Tahun 2008 tentang pedoman Sistem  Manajemen Keselamatan Dan Keselamatan Kerja ( SMK3 ) Konstruksi Bidang Pekerjaan Umum, dan PP No. 50 Tahun 2012 tentang Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja. Tujuan Dalam Penelitian Ini adalah untuk mengevaluasi penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja, dan untuk mengetahui langkah-langkah penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja di lingkungan Proyek Pembangunan Rumah Sakit Umum Daerah Sunan Kalijaga Demak. Pengolahan data dilakukan dengan menyusun dan membahas hasil dari kuesoner yang sudah di sebar kepada para responden, serta studi literatur sebagai data pendukung. Hasil dari penelitian menunjukan bahwa secara keseluruhan pedoman Sistem  Manajemen Keselamatan Dan Keselamatan Kerja ( SMK3 ) sudah diterapkan dengn sangat baik.</p><p><strong> </strong></p><strong>Kata Kunci</strong> : <em>SMK 3, Pedoman, RSUD Sunan Kalijaga</em>


2021 ◽  
Vol 933 (1) ◽  
pp. 012037
Author(s):  
A U Abidin ◽  
E M Nurmaya ◽  
W Hariyono ◽  
A H Sutomo

Abstract The Occupational Safety and Health Management System (OSHMS) is an important part of the protection of the workforce so that workers remain safe, healthy and safe. Every year in the manufacturing industry in the Sleman area, Yogyakarta Special Region, work accidents result in losses for the company because they have to be taken to the hospital. This study aims to determine the application of OSH to the occurrence of work-related accidents. This type of research is qualitative. The research was carried out in the manufacturing industry of the Hospital Equipment (HE) Division of the Pre-Treatment and Painting Unit. The research instrument uses the criteria for the OSH audit checklist, Government Regulation Number 50 of 2012, which consists of 5 principles, 12 criteria, and 166 items. The range of results from the audit achievement is 0 – 100%. The implementation of OSH in the company is 76.5%, in the category of good implementation, namely for the level of achievement of 60 - 84%. The number of findings was 39 criteria with major non-conformance categories 0 criteria and 39 minor criteria. The implementation of OSHMS can minimize the incidence of work accidents in workplace.


2021 ◽  
Vol 10 (1) ◽  
pp. 37-46
Author(s):  
Tudermi Maksimilyan Fioh ◽  
Anderias Umbu Roga ◽  
Johny A. R. Salmun ◽  
Franky M. S. Telupere

The determining or the implementation of occupational safety and health management system is an obligation for all companies as is already mandated in Government Regulation Number 50 in 2012. The implementation have an aim to reduce the risk level of work accident noraltough the occupational illness which may be happening in work environment. The aim of this research is to cover the implementation of occupational safety and health management system at PT. PLN (Persero) Rayon Rote Ndao. This research is using descriptive analysis method with total five informants which are consist of the manager of PT.PLN (Persero) Rayon Rote Ndao, supervisor K3, office employee, field employee and engineer. The research result shows that theoccupational safety and health management system’s commitment and the policy, the occupational safety and health management system’s planning, the occupational safety and health management system’s implementation, the occupational safety and health management system’s measurement and evaluation, and the occupational safety and health management system’s review and improvement in PT.PLN (Persero) Rayon Rote Ndao have already been well applyed.


Sign in / Sign up

Export Citation Format

Share Document