scholarly journals Project Planning by Modified Gauss S-Curve

Author(s):  
Križaić Vladimir ◽  
Hranj Dražen
Keyword(s):  
Author(s):  
Elena Makarycheva

The aim of the article is to develop a method for calculating water losses from irrigation channels in determining the permeability of rock in the zone of filtration flow on the basis of the law of infiltration A.N. Kostyakov using the results of studies of free filtration from pits and foundation pits in loess loams. Pressure movement of water in irrigation canals is subject to the laws of two-phase flow, in which – in contrast to the Darcy law for the zone of saturation plays an important role, the volume and its change in time. The filtration rate (VF) increases with increasing rock moisture (θ) along the S-curve, while the pressure gradient (I = dh/dz) decreases. The dependences of these parameters on the pressure are represented by power functions, and their product CDP = VFI does not change in time and can serve as a characteristic of the filtration flow under the channel. When installing paired piezometers near the water chore line in the channel and determining the graph I(t) by the value of the twophase flow constant CDP, it is possible to calculate the filtration rate at a number of times and the water losses during unsteady filtration. Water losses from the channels at equilibrium humidity increases with increasing head according to the formula A.N. Kostyakova, in which the water permeability of rocks is characterized by a steady filtration rate at a head of 1.0 m, and the gradient is the function of pressure. The application of the proposed method of calculating losses in the design of irrigation systems will increase the reliability of the justification of the volume of anti-filtration measures and the forecast of the groundwater level.


Author(s):  
Totska Olesia ◽  
Glovatsky Anastasia

The purpose of the article is to plan a project of an electric vehicle technicalassistance point. the methodology of the study is to use the critical path method.the scientific novelty of the obtained results is that the article describes the practicalaspects of project planning of the creation of an electric vehicle technical assistancepoint. In particular, the tasks of the project are described, labor, material and financialresources necessary for its realization are specified. conclusions. The implementationof the developed project will effectively manage the content, time and resources ofthe project of the creation of an electric vehicle technical assistance point.


2018 ◽  
Vol 26 (2) ◽  
Author(s):  
Dean A. Forbes

In a recent essay published in this journal, I illustrated the limitations one may encounter when sequencing texts temporally using s-curve analysis. I also introduced seriation, a more reliable method for temporal ordering much used in both archaeology and computational biology. Lacking independently ordered Biblical Hebrew (BH) data to assess the potential power of seriation in the context of diachronic studies, I used classic Middle English data originally compiled by Ellegård. In this addendum, I reintroduce and extend s-curve analysis, applying it to one rather noisy feature of Middle English. My results support Holmstedt’s assertion that s-curve analysis can be a useful diagnostic tool in diachronic studies. Upon quantitative comparison, however, the five-feature seriation results derived in my former paper are found to be seven times more accurate than the single-feature s-curve results presented here. 


2020 ◽  
Vol 4 (1) ◽  
pp. 1
Author(s):  
Christian Ebere Enyoh ◽  
Andrew Wirnkor Verla ◽  
Chidi Edbert Duru ◽  
Emmanuel Chinedu Enyoh ◽  
Budi Setiawan

Based on the official Nigeria Centre for Disease Control (NCDC) data, the current research paper modeled the confirmed cases of the novel coronavirus disease 2019 (COVID-19) in Nigeria. Ten different curve regression models including linear, logarithmic, inverse, quadratic, cubic, compound, power, S-curve, growth, and exponential were used to fit the obtained official data. The cubic (R2 = 0.999) model gave the best fit for the entire country. However, the growth and exponential had the lowest standard error of estimate (0.958) and thus may best be used. The equations for these models were e0.78897+0.0944x and 2.2011e0.0944x respectively. In terms of confirmed cases in individual State, quadratic, cubic, compound, growth, power and exponential models generally best describe the official data for many states except for the state of Kogi which is best fitted with S-curve and inverse models.  The error between the model and the official data curve is quite small especially for compound, power, growth and exponential models. The computed models will help to realized forward prediction and backward inference of the epidemic situation in Nigeria, and the relevant analysis help Federal and State governments to make vital decisions on how to manage the lockdown in the country.


2020 ◽  
Vol 10 (1) ◽  
pp. 86-99
Author(s):  
Lewis Tsuro ◽  
Stan Hardman

The Soft Systems Methodology (SSM) was developed as a set of tools for identifying and making incremental steps to improve situations with poorly defined causes or solutions. The supply chain forms a key process of any construction project; however, on any given construction site, supply chain inefficiencies could arise from many different avenues. Opinions vary, though, on which of these avenues is more important for increasing supply chain efficiencies; whether any problem even exist across the different aspects of the supply chain; as well as what steps should be taken to resolve them. It was therefore studied, here, whether SSM could be employed as a useful tool to systematically apply in the supply chains of a construction project in South Africa, for understanding and targeting the problematic situations that arise. Following thorough cyclical open-ended interviews with 17 workers, supervisors, foremen, site clerks, senior managers, and the CEO of the principal contractor at a new office park construction project in Rosebank, Johannesburg, and a thematic analysis of the data, SSM was performed to understand the existing challenges, and develop a suitable model for improvement. The study found that SSM was a good tool for understanding the ‘messy’ circumstances surrounding the chosen construction project supply chain, as well as actions that could be taken to improve the supply chain’s efficiency on site. The findings add weight to the argument that SSM could be a good tool for project managers to systematically introduce into their project planning regimens


1996 ◽  
Author(s):  
Amy Doll ◽  
Kenneth I. Rubin
Keyword(s):  

Author(s):  
Godwin Akpan ◽  
Johnson Muluh Ticha ◽  
Lara M.F. Paige ◽  
Daniel Rasheed Oyaole ◽  
Patrick Briand ◽  
...  

BACKGROUND Acute Flaccid Paralysis (AFP) surveillance is the bedrock of polio case detection. The Auto Visual AFP Detection and Reporting (AVADAR) is a digital health intervention designed as a supplemental community surveillance system. OBJECTIVE This paper describes the design and implementation process that made AVADAR a successful disease surveillance strategy at the community level. METHODS This paper outlines the methods for the design and implementation of the AVADAR application. It explains the co-design of the application, the implementation of a helpdesk support structure, the process involved in trouble shooting the application, the benefits of utilizing a closed user group for telecommunication requirements, and the use of a consented video. We also describe how these features combined led to user acceptance testing using black box methodology. RESULTS A total of 198 community informants across two provinces, four districts and 32 settlements were interviewed about application performance, usability, security, load, stress and functionality testing black box components. The responses showed most community participants giving positive reviews. Data from the Blackbox testing yielded optimum acceptance ratings from over 90% of the users involved in the testing. A total of 22380 AFP Alerts were sent out by community informants and 21589 (95%) were investigated by health workers or WHO AVADAR coordinators. Overall there was 93% assimilation at regional level. About 83% of investigations were done in the vicinity of the alerts in 2018 compared to 77% in 2017. CONCLUSIONS AVADAR implementation model offers a simplistic step by step model that includes community participation as an integral tool for the successful deployment of a mobile based surveillance reporting tool. AVADAR can be a veritable source of project planning data and a mobile application for other interventions that target using community participation to influence health outcomes.


Author(s):  
Farhaj Ishtiaq ◽  
Mirza Jahanzaib

<p>Complexities faced by oil and gas projects due to uncertainty and risk, demand the implementation of project management techniques for their successful completion. Therefore, this is made by using analytical hierarchy process, to identify and prioritize the key factors for successful project management performance of oil and gas projects. These factors are categorized into three groups which include attributes of project staff, project planning process and assessment of project quality. Using expert choice, a hierarchy is developed followed by pairwise comparison based upon data collection from industrial experts of oil and gas sector. Results of analytical hierarchy process (AHP) concluded that, project completion within estimated time and budget, clarity of objectives and involvement of top management are most crucial elements for improvement in project management performance of oil and gas projects. Whereas sensitivity analysis being carried out according to three different scenarios highlighted factors according to their relative importance.</p>


Sign in / Sign up

Export Citation Format

Share Document