scholarly journals Modeling the Price of Emergency Power Transmission Lines in the Reserve Market Due to the Influence of Renewable Energies

2022 ◽  
Vol 9 ◽  
Author(s):  
Hamid Iranmehr ◽  
Rahmat Aazami ◽  
Jafar Tavoosi ◽  
Mohammadamin Shirkhani ◽  
Amir-Reza Azizi ◽  
...  

The law of free access to the transmission network obliges the transmission network to be in orbit, and on the other hand, the high loads in the transmission network, and economic uncertainties cause that the owners of transmission companies, don’t have sufficient motivation and resources to rebuild and develop the network. The main objective of this paper is the modeling the price of emergency power transmission lines in the reserve markets. This paper presents a method for calculating the reference price that a transmission line owner uses to bid on a price in excess of the nominal capacity of the transmission line under his ownership. For this purpose, first, the effects of operating a transmission line at a power greater than the rated power are described. After that, the reduction rate of the transmission line due to operation in these conditions is calculated, and finally the price determination is calculated based on the reduction rate of the generated life. In the next stage, this excess capacity is entered the two-stage model of energy market and reservation considering renewable energy sources as a price offer function. Numerical results of 6-Shin network show that the entry of renewable energy sources reduces energy costs, but the costs of the reserve market increases due to uncertainty. However, despite the emergency capacity, these costs are reduced due to the use of cheap resources in the network.

Energies ◽  
2021 ◽  
Vol 14 (6) ◽  
pp. 1561
Author(s):  
Hao Chen ◽  
Zhongnan Qian ◽  
Chengyin Liu ◽  
Jiande Wu ◽  
Wuhua Li ◽  
...  

Current measurement is a key part of the monitoring system for power transmission lines. Compared with the conventional current sensor, the distributed, self-powered and contactless current sensor has great advantages of safety and reliability. By integrating the current sensing function and the energy harvesting function of current transformer (CT), a time-multiplexed self-powered wireless sensor that can measure the power transmission line current is presented in this paper. Two operating modes of CT, including current sensing mode and energy harvesting mode, are analyzed in detail. Through the design of mode-switching circuit, harvesting circuit and measurement circuit are isolated using only one CT secondary coil, which eliminates the interference between energy harvesting and current measurement. Thus, the accurate measurement in the current sensing mode and the maximum energy collection in the energy harvesting mode are both realized, all of which simplify the online power transmission line monitoring. The designed time-multiplexed working mode allows the sensor to work at a lower transmission line current, at the expense of a lower working frequency. Finally, the proposed sensor is verified by experiments.


Author(s):  
Guanghong Tao ◽  
Lijin Fang

Purpose The purpose of this paper is to introduce a robot mechanism designed for power transmission line inspection. The focus for this design is on obstacle-crossing ability with a goal to create a robot moving and crossing obstacle on not only the straight line but also the steering line. Design/methodology/approach A novel four-unit tri-arm serial robot mechanism is proposed. Every novel unit designed for pitching motion is based on parallelogram structure, which is driven by cables and only one motor. There is gripper-wheel compounding mechanism mounted on the arm. The prototype and obstacle environments are established, and the obstacle-crossing experiments are conducted. Findings The novel unit mechanism and robot prototype have been tested in the lab. The prototype has demonstrated the obstacle-crossing ability when moving and crossing fundamental obstacles on the line. The experimental results show that the robot mechanism meets the obstacle-crossing requirements. Practical implications The novel robot technology can be used for defect inspection of power transmission line by power companies. Social implications It stands to lower the intense and risk of inspection works and reduce the costs related to inspection. Originality/value Innovative features include its architecture, mobility and driving method.


Resources ◽  
2020 ◽  
Vol 9 (11) ◽  
pp. 130
Author(s):  
Gennadiy Stroykov ◽  
Alexey Y. Cherepovitsyn ◽  
Elizaveta A. Iamshchikova

Using renewable energy off-grid power supply and choosing the right equipment that meets the operating conditions in the Arctic can provide companies with reliable power sources for producing gas at facilities located in remote areas and will reduce capital and operating costs associated with the construction of power transmission lines. For more than 15 years, a remote control system powered by renewable energy has been used in parallel with power transmission lines by Gazprom to operate its multiwell pads in Russia’s Far North, which validates the relevance of this study. The subject of the study is a group of gas condensate wells that consists of four multiwell pads operated by Wintershall Russland GmbH. The article discusses a stand-alone renewable-based power system as an option for powering remote oil and gas production facilities. The procedures used in the study include calculating such parameters as power output and power consumption, choosing equipment, describing the design features of a power supply system for a multiwell pad, conducting an economic assessment of the project, comparing different power supply options, analyzing project risks, and developing measures to mitigate these risks.


2017 ◽  
Vol 40 (11) ◽  
pp. 3273-3292 ◽  
Author(s):  
Vikram Banthia ◽  
Yaser Maddahi ◽  
Kourosh Zareinia ◽  
Stephen Liao ◽  
Tim Olson ◽  
...  

This paper reports technical design of a novel experimental test facility, using haptic-enabled teleoperation of robotic manipulators, for live transmission line maintenance. The goal is to study and develop appropriate techniques in repair overhead power transmission lines by allowing linemen to wirelessly guide a remote manipulator, installed on a crane bucket, to execute dexterous maintenance tasks, such as twisting a tie wire around a cable. Challenges and solutions for developing such a system are outlined. The test facility consists of a PHANToM Desktop haptic device (master site), an industrial hydraulic manipulator (slave site) mounted atop a Stewart platform, and a wireless communication channel connecting the master and slave sites. The teleoperated system is tested under different force feedback schemes, while the base is excited and the communication channel is delayed and/or lossy to emulate realistic network behaviors. The force feedback schemes are: virtual fixture, augmentation force and augmented virtual fixture. Performance of each scheme is evaluated under three measures: task completion time, number of failed trials and displacement of the slave manipulator end-effector. The developed test rig has been shown to be successful in performing haptic-enabled teleoperation for live-line maintenance in a laboratory setting. The authors aim at establishing a benchmark test facility for objective evaluation of ideas and concepts in the teleoperation of live-line maintenance tasks.


Author(s):  
Ngo Minh Khoa ◽  
Nguyen Huu Hieu ◽  
Dinh Thanh Viet

<p>This paper focuses on analyzing and evaluating impact of a Static Var Compensator (SVC) on the measured impedance at distance protection relay location on power transmission lines. The measured impedance at the relay location when a fault occurs on the line is determined by using voltage and current signals from voltage and current transformers at the relay and the type of fault occurred on the line. The MHO characteristic is applied to analyze impact of SVC on the distance protection relay. Based on the theory, the authors in this paper develop a simulation program on Matlab/Simulink software to analyze impact of SVC on the distance protection relay. In the power system model, it is supposed that the SVC is located at mid-point of the transmission line to study impact of SVC on the distance relay. The simulation results show that SVC will impact on the measured impedance at the relay when the fault occurs after the location of the SVC on the power transmission line.</p>


Energies ◽  
2019 ◽  
Vol 12 (7) ◽  
pp. 1193 ◽  
Author(s):  
Zuzana Bukvisova ◽  
Jaroslava Orsagova ◽  
David Topolanek ◽  
Petr Toman

This work analyses a two-terminal algorithm designed to locate unsymmetrical faults on 110 kV power transmission lines. The algorithm processes synchronized voltage and current data obtained from both ends of the protected transmission line and calculates the distance of the fault. It is based on decomposing the equivalent circuit into the positive-, negative- and zero-sequence components and finding the point where the output voltages of the right and the left side of the transmission line are equal. Compared to the conventional distance relay locator, the accuracy of this method is higher and less influenced by the fault resistance, the parallel-operated line effect and line asymmetry, as discussed in this work. It is, however, very sensitive to the synchronization accuracy. The mathematical model of the power system was created in the PSCAD (Power Systems Computer Aided Design) environment and the computational algorithm was implemented in Mathematica software.


2013 ◽  
Vol 380-384 ◽  
pp. 3425-3428
Author(s):  
Guang Zu Ge ◽  
Bo Tang ◽  
Jian Xiong Zhu ◽  
Yin Huang ◽  
Zi Hang Qu

Resolving the contradiction between trees and power transmission lines in time is an important work to ensure the safety of transmission line operation. While it is difficult to decide the trees trimmed time during the transmission line operation and maintenance, the development of the management information system for protecting distance between transmission lines and trees, which is used to auxiliary predict the date of pruning, is a way to solve the problem. Collected attribute data of transmission lines and trees, the corresponding database is established. Therefore, Visual Basic 6.0 is adopted to develop the software system. Based on the spatial coordinates of line towers, conductors, and tree crown, the three-dimensional mathematical model is established to calculate the spatial distance between the conductor and tree crown. According to the mathematical model, the trees growth rate of year, month and day, respectively, and the protecting distance standard between conductor and tree crown, the system could calculate the actual spatial distance between conductor and tree crown, and auxiliary predict the pruning date.


2012 ◽  
Vol 249-250 ◽  
pp. 798-803
Author(s):  
Zi Fu Zhang ◽  
Zeng Lu Mo ◽  
Jing Du Geng

The breakage of conductor/ground wire seriously affects the secure operation of transmission line. According to the features of UHVDC power transmission lines, the broken conductor model for bundled conductors of continuous span is built and the broken conductor load is calculated; A simulating test was carried out the first time in China for a series of "broken conductor" events on one continuous span on the field to study the dynamic response of the transmission tower because of impact, then the dynamic strain and displacement were obtained. On the basis of the simulation and experiential research results, the paper discussed about the rational values of broken wire loads for the suspension towers of UHVDC.


Sign in / Sign up

Export Citation Format

Share Document