scholarly journals Lean Construction Concept Used to Develop Infrastructure Facilities for Tourism Clusters

Buildings ◽  
2021 ◽  
Vol 12 (1) ◽  
pp. 23
Author(s):  
Alexandr K. Orlov ◽  
Vadim S. Kankhva

The relevance of the article is conditioned on tourist infrastructure problems and underdevelopment when creating and developing territorial clusters, for which there is not enough research materials in the context of tourism cluster facilities construction, despite the fact that the issues of lean construction (LC) are widely covered. Based on the relevance, the main hypothesis of the study was determined. It consists of the fact that the use of lean construction can increase the efficiency of construction megaprojects in the field of tourism clusters. The objective of this study is to develop a mechanism for the development of tourism clusters based on the lean construction concept that will be aimed at increasing the efficiency of construction projects taking into account the accumulated world experience. Within the framework of the tasks set, the analysis of the lean construction methodological base was carried out, methodological recommendations aimed at increasing the efficiency of construction megaprojects of tourism clusters based on the lean construction concept were developed, a model for the implementation of lean construction in infrastructure projects of tourism clusters, as well as a checklist of the analysis technology were elaborated. The proposed methodological approach to the implementation of tourism cluster megaprojects based on the lean construction concept is the basis for organizing and planning development activities at the tactical and operational levels. To assess the effectiveness of lean construction tool introduction to implement infrastructure projects of tourism clusters, a comparative analysis was carried out and the construction time and lifecycle cost of a typical guest house were calculated without taking into account the lean construction methodology and after its introduction. The results obtained, namely, the duration of the project and costs at life cycle stages made it possible to conclude that the proposed methodological approach is effective.

2021 ◽  
Vol 13 (11) ◽  
pp. 6376
Author(s):  
Junseo Bae ◽  
Sang-Guk Yum ◽  
Ji-Myong Kim

Given the highly visible nature, transportation infrastructure construction projects are often exposed to numerous unexpected events, compared to other types of construction projects. Despite the importance of predicting financial losses caused by risk, it is still difficult to determine which risk factors are generally critical and when these risks tend to occur, without benchmarkable references. Most of existing methods are prediction-focused, project type-specific, while ignoring the timing aspect of risk. This study filled these knowledge gaps by developing a neural network-driven machine-learning classification model that can categorize causes of financial losses depending on insurance claim payout proportions and risk occurrence timing, drawing on 625 transportation infrastructure construction projects including bridges, roads, and tunnels. The developed network model showed acceptable classification accuracy of 74.1%, 69.4%, and 71.8% in training, cross-validation, and test sets, respectively. This study is the first of its kind by providing benchmarkable classification references of economic damage trends in transportation infrastructure projects. The proposed holistic approach will help construction practitioners consider the uncertainty of project management and the potential impact of natural hazards proactively, with the risk occurrence timing trends. This study will also assist insurance companies with developing sustainable financial management plans for transportation infrastructure projects.


2015 ◽  
Vol 4 (2) ◽  
pp. 288 ◽  
Author(s):  
Nabil Al-Hazim ◽  
Zaydoun Abusalem

This study aims to identify the most important factors that cause delay in road construction projects in Jordan, which results in cost and time overrun allocated for this type of engineering projects and cause critical problems for both the developer and the contractor. The gap between the cost at completion and that originally estimated, known as cost overrun, can be regarded as one of the most important parameters reflecting the success of projects. In the public sector, money spent on project change orders results in increased construction time which in return reduces the number and size of the projects that can be completed during any given fiscal year. To achieve this goal, the documents and the final reports for several sample projects implemented over the years 2000 to 2008 were analyzed. All the projects were administered by the same organization taken from Jordan Ministry of Rural and Public Works. The results of this study can assist highway officials in their design, planning, scheduling and projects completions so that necessary actions can be taken to control these overruns in future projects. The study showed that 19 factors might cause delays of road construction projects as defined through a detailed literature review. The analysis of the study indicated that the top causes affecting time and cost overrun in road construction projects in Jordan are Terrain and Weather conditions.


2020 ◽  
Vol 13 (6) ◽  
pp. 119
Author(s):  
Johnson Matu ◽  
Dorothy Ndunge Kyalo ◽  
John Mbugua ◽  
Angeline Sabina Mulwa

This paper examines the influence of stakeholder participation in project execution on completion of road projects implemented by Kenya Urban Roads Authority. Descriptive research survey design was used for collection of both quantitative and qualitative data. Analysis was performed using correlation and regression analysis. The results were r = 0.796, R2 = 0.634, F (4, 209) = 90.503 and p<0.000<0.05. The findings revealed that stakeholder participation in project execution showed a strong, positive and statistically significant relationship with completion of urban road transport infrastructure projects and accounted for 63.4% of total variation in such projects. The study recommends government agencies should endeavour should work together during project implementation to ensure that service lines and acquisition of land is done ahead of time to avoid delay in completion. This will aim at ensuring quality work is achieved by both the client and the consultant through a collaborative stakeholder engagement. In conclusion, the findings of this study will shape the future of road construction and stakeholder engagement in road construction projects.


2021 ◽  
Vol 2 (47) ◽  
pp. 48-63
Author(s):  
L.V. Sorokina ◽  
A.F. Hoiko

 The article systematized factors of investment attractiveness and investment climate in Ukraine. The expediency of supplementinganexistinglist of components of investment climate is substantiated by two additional factors. Themechanismo factionoftheproposedfactorsthatreflectthenegative effectin the developmen to freformsand innovations, aswellas the economic efficiency of construction projects on the financial result, expected from investigations, isrevealed. The trends in the developmen to finvestment activityinUkrainein 2015 - 2020, the existence of reserves for increasing the economic efficiency of investments and the need for their calculation witht hehelpof a special methodological approac hare analyzed. The methodical approach to the evaluation of investment efficiency of constructionis developed, which is based on the magnitude of the multiplier of capital investment in construction inthelong-termperiodandrefinedtheboundariesoftheretrospectivehorizon, which are necessary to determine such a multiplier. The rapid importance of aninvestment multiplier of construction isestablis hedand a methodological approach to qualitative interpretation of this indicator issubstantiated. The basis of a methodological approach is the results of a cluster analysis of aninvestment multiplier in the contex to fvarioustypesofconstructionandregions, the methodof K-medium, aswellaspostulatesofthetheoryoffuzzysets. Within the framework of the developed methodological approach, the "investment attractiveness of construction" characteristicsis presentedin the form of a fuzz yterm-shear, which combines three terms: "Lowefficiency", "averageefficiency", "highlevelofefficiency". Inaccordance with descriptiv estatistics of thereceived clusters, the parameters and type of functions of affiliation, the boundaries of clusters that directly affecttheuse of correctivea mendments to the value of the economic effectof capitalinvestment to the level of the contractor-executor of construction work are substantiated. The sizeofther is kfactorisestablishedtakingintoaccountthetypeofconstructionandmedium-layervalues ​​ofmultipliersofcapitalinvestmentinconstruction. Theuse of the proposed Metdic approach to the analysis of investment efficiency inconstruction makesitpossible to increase the accuracy of calculations on th epre-investmentst age of construction, aswellastoimprovemonitoring of capital investment development, carried out in the process of implementing national investment programs and international investment projects.


Author(s):  
Gladys Lechini ◽  
Maria Noel Dussort ◽  
Agustina Marchetti

Abstract China’s intention to go global has been clear since Xi Jinping assumed power, displaying its grand strategy. Infrastructure projects supporting physical connectivity reveal China’s policies to expand its actions beyond the regional environment and consolidate its power projection. The Going Out policy has been the tool to back up Chinese investments in infrastructure, and African countries have offered a good opportunity to show what can be done in an almost bare terrain. Nigeria and Kenya are good examples to empirically demonstrate China’s intentions, as they have railway remodelling or construction projects underway.


2019 ◽  
Vol 19 (1) ◽  
Author(s):  
Tharun Dolla ◽  
Boeing Laishram

Prequalification (PQ) is a significant process in the selection of private sector for the delivery of civil infrastructure projects.  But, the extant literature, for the most part, focused on PQ of construction projects.  The need for setting proper PQ, i.e., criteria and corresponding limits in public-private partnership (PPP) infrastructure projects, especially municipal solid waste (MSW) projects is still a lacuna in the body of knowledge of Indian PPPs.  To this end, this paper identified PQ criteria using content analysis of the sample of MSW projects. These identified criteria were subjected to regression modeling. These results were compared with the results of well-matured highway sector to draw comparison with MSW projects.  The practical implications are that urban local bodies (ULBs) are but less competent and less uniform in the rationale of setting the PQ criteria and limits.  This paper suggests that lowering the technical and financial PQ limits considering the market orientation will help in bringing more competitive bidders into the bidding.   Since MSW is in a very nascent stage of application of PPP, the study results could lay directions for future project procurement to discern right limits for right project sizes.