scholarly journals Chemical Impacts of Potential CO2 and Brine Leakage on Groundwater Quality with Quantitative Risk Assessment: A Case Study of the Farnsworth Unit

Energies ◽  
2020 ◽  
Vol 13 (24) ◽  
pp. 6574
Author(s):  
Ting Xiao ◽  
Brian McPherson ◽  
Richard Esser ◽  
Wei Jia ◽  
Zhenxue Dai ◽  
...  

Potential leakage of reservoir fluids is considered a key risk factor for geologic CO2 sequestration (GCS), with concerns of their chemical impacts on the quality of overlying underground sources of drinking water (USDWs). Effective risk assessment provides useful information to guide GCS activities for protecting USDWs. In this study, we present a quantified risk assessment case study of an active commercial-scale CO2-enhanced oil recovery (CO2-EOR) and sequestration field, the Farnsworth Unit (FWU). Specific objectives of this study include: (1) to quantify potential risks of CO2 and brine leakage to the overlying USDW quality with response surface methodology (RSM); and (2) to identify water chemistry indicators for early detection criteria. Results suggest that trace metals (e.g., arsenic and selenium) are less likely to become a risk due to their adsorption onto clay minerals; no-impact thresholds based on site monitoring data could be a preferable reference for early groundwater quality evaluation; and pH is suggested as an indicator for early detection of a leakage. This study may provide quantitative insight for monitoring strategies on GCS sites to enhance the safety of long-term CO2 sequestration.

2008 ◽  
Vol 45 (9) ◽  
pp. 1250-1267 ◽  
Author(s):  
Mark J. Cassidy ◽  
Marco Uzielli ◽  
Suzanne Lacasse

Probabilistic risk assessments are increasingly being considered the most appropriate framework for engineers to systematically base decisions on hazard mitigation issues. This paper aims to show the advantages of a quantitative risk assessment by application to a historical case study. The generalized integrated risk assessment framework has been applied retrospectively to a submarine landslide that occurred in 1996 near the village of Finneidfjord in northern Norway. Over 1 million cubic metres of predominantly quick clay was displaced. Even though it was triggered underwater on the embankment of the Sørfjord, the retrogressive nature of the slide resulted in it encroaching 100–150 m inland. The triggering mechanism is believed to have been the placement of fill, from a nearby tunnelling project, on the foreshore of the embankment. This paper is a retrospective quantitative evaluation of the risk to the neighbouring houses, the persons in those houses, and the persons in open spaces caused by the placement of increasing levels of embankment fill. A probabilistic approach, making use of second-moment modelling and first-order second-moment approximation is adopted. It aims to demonstrate the advantages of this type of risk assessment in understanding complex and integrated hazards, particularly those in populated environments.


Author(s):  
Emad Mohamed ◽  
Nima Gerami Seresht ◽  
Stephen Hague ◽  
Adam Chehouri ◽  
Simaan M. AbouRizk

Although many quantitative risk assessment models have been proposed in literature, their use in construction practice remain limited due to a lack of domain-specific models, tools, and application examples. This is especially true in wind farm construction, where the state-of-the-art integrated Monte Carlo simulation and critical path method (MCS-CPM) risk assessment approach has yet to be demonstrated. The present case study is the first reported application of the MCS-CPM method for risk assessment in wind farm construction and is the first case study to consider correlations between cost and schedule impacts of risk factors using copulas. MCS-CPM provided reasonable risk assessment results for a wind farm project, and its use in practice is recommended. Aimed at facilitating the practical application of quantitative risk assessment methods, this case study provides a much-needed analytical generalization of MCS-CPM, offering application examples, discussion of expected results, and recommendations to wind farm construction practitioners.


2021 ◽  
Vol 13 (21) ◽  
pp. 12169
Author(s):  
Robertas Alzbutas ◽  
Mindaugas Vaisnoras ◽  
Inga Saruniene ◽  
Ricardas Krikstolaitis ◽  
Mindaugas Valincius ◽  
...  

One of the goals of any oil terminal is to make a business while avoiding hazardous events and harmful effects for both humans and the environment. This can be achieved by creating a safe working place as well as by performing safe and acceptable activities regarding the impact on surrounding objects, including residential and industrial areas. The aim of the hazard analysis of the oil terminal is to assess the risks related to hazardous events or phenomena and to evaluate whether the assessed risks are acceptable. The hazard analysis and assessment of risk are also used for risk reduction while examining and limiting hazardous scenarios that, for instance, involve the loss-of-containment of flammable or combustible material. In this paper, the authors aim to contribute to risk research by providing a comprehensive methodology of risk assessment for oil terminals with case study results and discussion on features of the methodology, risk aggregation, its applicability for risk reduction, and industrial interests. The performed study considered the “Klaipedos Nafta AB” (an operator of the Klaipeda Oil Terminal, Lithuania) case study regarding hazardous materials that might be released from various tanks, devices, and associated pipelines. The performed quantitative risk assessment has enabled the determination of the probability regarding whether releases would ignite and, for instance, cause explosion. In the case study, the estimate of probability, i.e., the frequency, and the possible consequences of the hazardous events were evaluated, and both mitigation and risk reduction measures were also considered.