scholarly journals Optimization and Field Test of a Chelating Acid System for Scaled Gas Wells in the Hechuan Gas Field

Energies ◽  
2021 ◽  
Vol 14 (23) ◽  
pp. 7959
Author(s):  
Qiang Li ◽  
Zhenzhong Fan ◽  
Qingwang Liu ◽  
Guohong Liu ◽  
Wenhai Ma ◽  
...  

The Hechuan gas field is one of the tight gas reservoirs with the highest formation water salinity in China. The content of metal ions, such as calcium, magnesium, iron, and barium, is as high as 20 g/L. Severe scales in near-wellbore reservoir blocks the gas and liquid flow paths, affecting the normal production of gas wells. The analysis of scale samples shows that the scale compositions in the Hechuan gas field are complex, which are composed of calcium carbonate, calcium sulfate, barium sulfate, iron salt, silicate, and other inorganic scales. To dissolve these scales, 14 kinds of laboratory self-made chelating acids named AST-01 to AST-14, sequentially, were evaluated by the descaling rate, in which the chelating acid AST-01 was selected with a dissolution rate of 77.7%. Meanwhile, the optimal concentration and reaction time of AST-01 were investigated, and the concentrations of the corrosion inhibitor, the iron ion stabilizer, and surfactants were also optimized. Then, a chelating acid descaling formula was obtained, which was 15~20% of AST-01 chelating acid + 1.5~2.0% of corrosion inhibitor + 2.5% of iron ion stabilizer + 0.3% of drainage aid. A pilot field trial of this descaling formula was applied in a Hechuan X1 well. A remarkable result was obtained in that the shut-in tubing pressure recovery rate was increased by 14 times, the gas production was increased by 10 times, and the gas well resumed to produce continuously again.

2021 ◽  
Author(s):  
Bashirul Haq

Abstract Sour gas reservoirs are vital sources for natural gas production. Sulphur deposition in the reservoir reduces a considerable amount of gas production due to permeability reduction. Consequently, well health monitoring and early prediction of Sulphur deposition are crucial for effective gas production from a sour gas reservoir. Dynamic gas material balance analysis is a useful technique in calculating gas initially in place utilizing the flowing wellhead or bottom hole pressures and rates during the well's lifetime. The approach did not apply to monitor a producing gas's health well and detect Sulphur deposition. This work aims to (i) modify dynamic gas material balance equation by adding the Sulphur deposition term, (ii) build a model to predict and validate the issue utilizing the modified equation. A unique form of the flowing material balance is developed by including Sulphur residue term. The curve fitting tool and modified flowing gas material balance are applied to predict well-expected behaviour. The variation between expected and actual performance indicates the health issue of a well. Initial, individual components of the model are tested. Then the model is validated with the known values. The workflow is applied to active gas field and correctly detected the health issue. The novel workflow can accurately predict Sulphur evidence. Besides,the workflow can notify the production engineers to take corrective measures about the subject. Keywords: Sulfur deposition, Dynamic gas material balance analysis, Workflow


2021 ◽  
Vol 73 (07) ◽  
pp. 57-57
Author(s):  
Leonard Kalfayan

As unconventional oil and gas fields mature, operators and service providers are looking toward, and collaborating on, creative and alternative methods for enhancing production from existing wells, especially in the absence of, or at least the reduction of, new well activity. While oil and gas price environments remain uncertain, recent price-improvement trends are supporting greater field testing and implementation of innovative applications, albeit with caution and with cost savings in mind. Not only is cost-effectiveness a requirement, but cost-reducing applications and solutions can be, too. Of particular interest are applications addressing challenging well-production needs such as reducing or eliminating liquid loading in gas wells; restimulating existing, underperforming wells, including as an alternative to new well drilling and completion; and remediating water blocking and condensate buildup, both of which can impair production from gas wells severely. The three papers featured this month represent a variety of applications relevant to these particular well-production needs. The first paper presents a technology and method for liquid removal to improve gas production and reserves recovery in unconventional, liquid-rich reservoirs using subsurface wet-gas compression. Liquid loading, a recurring issue downhole, can severely reduce gas production and be costly to remediate repeatedly, which can be required. This paper discusses the full technology application process and the supportive results of the first field trial conducted in an unconventional shale gas well. The second paper discusses the application of the fishbone stimulation system and technique in a tight carbonate oil-bearing formation. Fishbone stimulation has been around for several years now, but its best applications and potential have not necessarily been fully understood in the well-stimulation community. This paper summarizes a successful pilot application resulting in a multifold increase in oil-production rate and walks the reader through the details of the pilot candidate selection, completion design, operational challenges, and lessons learned. The third paper introduces and proposes a chemical treatment to alleviate phase trapping in tight carbonate gas reservoirs. Phase trapping can be in the form of water blocking or increasing condensate buildup from near the wellbore and extending deeper into the formation over time. Both can reduce relative permeability to gas severely. Water blocks can be a one-time occurrence from drilling, completion, workover, or stimulation operations and can often be treated effectively with solvent plus proper additive solutions. Similar treatments for condensate banking in gas wells, however, can provide only temporary alleviation, if they are even effective. This paper proposes a technique for longer-term remediation of phase trapping in tight carbonate gas reservoirs using a unique, slowly reactive fluid system. Recommended additional reading at OnePetro: www.onepetro.org. SPE 200345 - Insights Into Field Application of Enhanced-Oil-Recovery Techniques From Modeling of Tight Reservoirs With Complex High-Density Fracture Network by Geng Niu, CGG, et al. SPE 201413 - Diagnostic Fracture Injection Test Analysis and Simulation: A Utica Shale Field Study by Jeffery Hildebrand, The University of Texas at Austin, et al.


2013 ◽  
Vol 712-715 ◽  
pp. 1096-1099
Author(s):  
Ling Feng Li

For natural gas well in sour gas reservoirs, very serious corrosion in the completed well system is an important factor of gas production system life. In order to ensure the long-term development of gas wells, this paper mainly introduces material corrosion prevention technology in the completed well system, such as corrosion-resistant alloy steel corrosion control technology, bimetallic combination tubing, corrosion inhibitor technology and so on. By taking LJ Gas Field as an example, this paper introduces the material corrosion prevention technology in the completed well system in LJ Gas Field. For application in the completed well system in LJ Gas Field, the technology above have good performance of corrosion resistance.


2012 ◽  
Vol 485 ◽  
pp. 429-432
Author(s):  
Ling Feng Li ◽  
Xiao Ming Liu ◽  
Zhi Qiang Huang

For natural gas well with high content of CO2 and H2S, very serious corrosion in the gas well string is an important factor of gas production system life. In order to ensure the long-term development of gas wells, this paper mainly study the corrosion-resistant material selection of tubing and casing in sour gas reservoirs under coexistence of H2S and CO2 and proposes the optimization idea and technique of tubing and casing material selection. By taking Puguang gas field as an example, this paper optimizes the material selection of production casing for Puguang gas field. By testing, the optimal materials of gas well string in Puguang gas field have good performance of erosion resistance


2014 ◽  
Vol 1044-1045 ◽  
pp. 401-405
Author(s):  
Hai Dong Shi

Dynamic reserves are the important basis for determining the reasonable deliverability of gas wells and well spacing density and also the foundation for the overall development plan of a gas field. Therefore, the evaluation of dynamic reserves of gas wells is crucially important to developing gas fields with high efficiency, optimizing well pattern and shortening development period. For this reason, this paper arranges and analyzes systematically a series of calculation methods for dynamic reserves of single gas well, which have arisen in recent years, and identifies the calculation methods for different types of gas reservoirs.


2020 ◽  
Vol 980 ◽  
pp. 483-492
Author(s):  
Lei Ji ◽  
Ju Hua Li ◽  
Guan Qun Li ◽  
Jia Lin Xiao ◽  
Sean Unrau

In order to optimize the layout and economic exploitation of horizontal fracturing wells and completion in shale gas reservoirs, we propose a model for evaluating shale gas fractured sections based on an improved principle component analysis (PCA) algorithm with logistic regression. The 229 gas production sections in 22 fractured shale gas wells in the main block of the Fuling Shale Development Demonstration Zone were selected, and PCA is used for dimensionalite reduction. According to the PCA results, 6 key parameters are chosen to determine the productivity of fractured wells. Taking the probability distribution of high production after fracturing as the research objective, a logistic regression discriminant model was constructed using the dichotomy method. The prediction results show that the model has 82.1% accuracy and is reliable. The model can be used to classify and gas wells to be fractured, and it provides guiding significance for reasonable optimization of well sections in the area selected for fracturing.


2020 ◽  
Vol 10 (8) ◽  
pp. 3557-3568
Author(s):  
Md. Shaheen Shah ◽  
Md Hafijur Rahaman Khan ◽  
Ananna Rahman ◽  
Stephen Butt

Abstract The overall performance of gas reservoirs and the optimization of production, as well as its sensitivity analysis, are affected by several factors such as reservoir pressure, well configuration and surface facilities. The Habiganj well no. 06 (HBJ-06) is one of the significant gas-producing vertical wells of the Habiganj gas field, currently producing 14.963 MMscfd of natural gas from the upper gas sand. The widely used Nodal analysis is an optimization technique to improve the performance and was applied for the HBJ-06 to increase its production rate by optimizing manners. By this analysis, each component starting from the reservoir to the outlet pressure of the separator was identified as a resistance in the system by evaluating their inflow performance relationship and vertical lift performance. The F.A.S.T. VirtuWell™ software package was used to perform this analysis, where the declinations of wellhead pressures were suggested as 1300, 1200, 1100 and 1000 psi(a) without any modification of the tubing diameter and skin factor. Hence, the respective optimized rates of the daily gas production were increased to 38.481, 40.993, 43.153 and 46.016 MMscfd. At the same time, the optimized condensate gas ratio was calculated as 0.07, 0.06, 0.06 and 0.05, associated with the optimized condensate water ratio of 0.11, 0.10, 0.09 and 0.08, respectively.


2021 ◽  
Author(s):  
Magdy Farouk Fathalla ◽  
Mariam Ahmed Al Hosani ◽  
Ihab Nabil Mohamed ◽  
Ahmed Mohamed Al Bairaq ◽  
Djamal Kherroubi ◽  
...  

Abstract An onshore gas field contains several gas wells which have low–intermittent production rates. The poor production has been attributed to liquid loading issue in the wellbore. This study will investigate the impact of optimizing the tubing and liner completion design to improve the gas production rates from the wells. Numerous sensitivity runs are carried out with varying tubing and liner dimensions, to identity optimal downhole completions design. The study begins by identifying weak wells having severe gas production problems. Once the weak wells have been identified, wellbore schematics for those wells are studied. Simulation runs are performed with the current downhole completion design and this will be used as the base case. Several completion designs are considered to minimize the effect of liquid loading in the wells; these include reducing the tubing diameter but keeping the existing liner diameter the same, keeping the original tubing diameter the same but only reducing the liner diameter, extending the tubing to the Total Depth (TD) while keeping the original tubing diameter, and extending a reduced diameter tubing string to the TD. The primary cause of the liquid loading seems to be the reduced velocity of the incoming gas from the reservoir as it flows through the wellbore. A simulation study was performed using the various completion designs to optimize the well completion and achieve higher gas velocities in the weak wells. The results of the study showed significant improvement in gas production rates when the tubing diameter and liner diameter were reduced, providing further evidence that increased velocity of the incoming fluids due to restricted flow led to less liquid loading. The paper demonstrates the impact of downhole completion design on the productivity of the gas wells. The study shows that revisiting the existing completion designs and optimizing them using commercial simulators can lead to significant improvement in well production rates. It is also noted that restricting the flow near the sand face increases the velocity of the incoming fluid and reduces liquid loading in the wells.


Sign in / Sign up

Export Citation Format

Share Document