scholarly journals Can Political Trust Weaken the Relationship between Perceived Environmental Threats and Perceived Nuclear Threats? Evidence from South Korea

Author(s):  
Jaeyoung Lim ◽  
Kuk-Kyoung Moon

As environmental movements rage, how to handle nuclear power plants has become a hotly contested issue globally. While concerns about nuclear power plants are warranted, nuclear power plants may play a crucial role in climate change discourse. In this context, this study examines the connections between individuals’ perceived environmental threats and their perceptions of the environmental threats posed by nuclear power plants (perceived nuclear threats). In particular, the study explores whether such connections are moderated by individuals’ level of political trust, such that political trust helps weaken perceptions of threats individuals may feel from nuclear power plants. Using the 2014 Korean General Social Survey and ordered probit, this study confirmed that individuals’ perceived environmental threats were positively associated with their perceived nuclear threats. Additionally, individuals with a high level of trust in the government can help alleviate the positive link between individuals’ perceived environmental threats and perceived nuclear threats.

10.6036/10156 ◽  
2021 ◽  
Vol 96 (4) ◽  
pp. 355-358
Author(s):  
Pablo Fernández Arias ◽  
DIEGO VERGARA RODRIGUEZ

Centralized Temporary Storage Facility (CTS) is an industrial facility designed to store spent fuel (SF) and high level radioactive waste (HLW) generated at Spanish nuclear power plants (NPP) in a single location. At the end of 2011, the Spanish Government approved the installation of the CTS in the municipality of Villar de Cañas in Cuenca. This approval was the outcome of a long process of technical studies and political decisions that were always surrounded by great social rejection. After years of confrontations between the different political levels, with hardly any progress in its construction, this infrastructure of national importance seems to have been definitively postponed. The present research analyzes the management strategy of SF and HLW in Spain, as well as the alternative strategies proposed, taking into account the current schedule foreseen for the closure of the Spanish NPPs. In view of the results obtained, it is difficult to affirm that the CTS will be available in 2028, with the possibility that its implementation may be delayed to 2032, or even that it may never happen, making it necessary to adopt an alternative strategy for the management of GC and ARAR in Spain. Among the different alternatives, the permanence of the current Individualized Temporary Stores (ITS) as a long-term storage strategy stands out, and even the possibility of building several distributed temporary storage facilities (DTS) in which to store the SF and HLW from several Spanish NPP. Keywords: nuclear waste, storage, nuclear power plants.


2018 ◽  
Vol 235 ◽  
pp. 644-668 ◽  
Author(s):  
Zhonglu Li ◽  
Xiaogang Wu

AbstractThis article analyses the data from the 2010 Chinese General Social Survey (CGSS) to investigate the effects of the New Rural Pension Scheme (NRPS) on people's political trust and policy expectations in China. Results from difference-in-differences (DID) analyses show that those in the NRPS pilot areas reported higher levels of trust in government at both central and local levels than their counterparts in non-NRPS areas, with the former gaining more support than the latter. Moreover, the potential NRPS beneficiaries show similarly higher levels of trust in both central and local governments than non-NRPS beneficiaries. However, the policy did not increase rural residents’ rights consciousness that the government should take the main responsibility for the provision of the old-age support. These findings suggest that citizens' political trust under an authoritarian regime is mainly determined by the material benefits they receive.


Author(s):  
Jay F. Kunze ◽  
James M. Mahar ◽  
Kellen M. Giraud ◽  
C. W. Myers

Siting of nuclear power plants in an underground nuclear park has been proposed by the authors in many previous publications, first focusing on how the present 1200 to 1600 MW-electric light water reactors could be sited underground, then including reprocessing and fuel manufacturing facilities, as well as high level permanent waste storage. Recently the focus has been on siting multiple small modular reactor systems. The recent incident at the Fukushima Daiichi site has prompted the authors to consider what the effects of a natural disaster such as the Japan earthquake and subsequent tsunami would have had if these reactors had been located underground. This paper addresses how the reactors might have remained operable — assuming the designs we previously proposed — and what lessons from the Fukushima incident can be learned for underground nuclear power plant designs.


2017 ◽  
Vol 4 ◽  
pp. 141-154
Author(s):  
Marcus Vitlin ◽  
Miroshan Naicker ◽  
Augustine Frederick Gardner

Generation III+ reactors are the latest generation of Nuclear Power Plants to enter the market. The key evolution in these reactors is the introduction of stringent safety standards. This is done through thorough incident scenario analysis and preparation, resulting in the addition of novel active and passive auxiliary safety systems, affecting the power consumption in the balance of plant. This paper analyses the parameters of PWR power plants of similar design, to determine the parameters for optimal efficiency, regarding gross and net electrical output, determining the impact the balance of plant has on this efficiency. While two of the three main factors affecting the Rankine cycle – boiler pressure and steam temperature – behaved as theoretically expected, there was a notable point of departure with the third parameter – condenser pressure. The relationship between steam temperature and gross electrical efficiency was linear across all reactors but the relation between the steam temperature and the net electrical efficiency ceased to be linear for secondary loop steam temperatures above 290°C. The relationship between boiler pressure and both gross and net electrical efficiency was linear, proving the Rankine cycle. A relationship was not observed between the condenser pressure and either the gross or net electrical efficiency


Author(s):  
Eugene Imbro ◽  
Thomas G. Scarbrough

The U.S. Nuclear Regulatory Commission (NRC) has established an initiative to risk-inform the requirements in Title 10 of the Code of Federal Regulations (10 CFR) for the regulatory treatment of structures, systems, and components (SSCs) used in commercial nuclear power plants. As discussed in several Commission papers (e.g., SECY-99-256 and SECY-00-0194), Option 2 of this initiative involves categorizing plant SSCs based on their safety significance, and specifying treatment that would provide an appropriate level of confidence in the capability of those SSCs to perform their design functions in accordance with their risk categorization. The NRC has initiated a rulemaking effort to allow licensees of nuclear power plants in the United States to implement the Option 2 approach in lieu of the “special treatment requirements” of the NRC regulations. In a proof-of-concept effort, the NRC recently granted exemptions from the special treatment requirements for safety-related SSCs categorized as having low risk significance by the licensee of the South Texas Project (STP) Units 1 and 2 nuclear power plant, based on a review of the licensee’s high-level objectives of the planned treatment for safety-related and high-risk nonsafety-related SSCs. This paper discusses the NRC staff’s views regarding the treatment of SSCs at STP described by the licensee in its updated Final Safety Analysis Report (FSAR) in support of the exemption request, and provides the status of rulemaking that would incorporate risk insights into the treatment of SSCs at nuclear power plants.


Author(s):  
Jaroslav Bartonicek ◽  
Klaus-Juergen Metzner ◽  
Friedrich Schoeckle

A comprehensive life time management has to take care of all safety and availability relevant components in nuclear power plants, with different intensity, of course. For instance, mechanical systems and components can be basically classified/ranked into three different groups: (1): The quality status of the components in this group has to be guaranteed on a pre-defined (high) level. (2): The quality status of the components in this group has to be maintained on its actual level. (3): Other components with no specific quality demands. Regarding the first group, integrity has to be guaranteed. Therefore it is necessary to monitor the possible root causes of degradation mechanisms during plant operation; thus the degradation effects can be assessed and — more important — controlled to maintain the safety standard on the demanded high level without any compromise. The monitoring of consequences of degradation mechanisms is being performed as an additional redundant measure. The requirements to maintain the quality status of the second group of components can be fulfilled by monitoring of the consequences of operational degradation mechanisms to be performed by preventive maintenance activities, in terms of tests, inspections and repairs, using either time dependant procedures or component condition orientated methods. For the third group of components, no preventive action is necessary. However, failures and malfunctions have to be assessed statistically to avoid a reduction of the required basic component quality. In the first two groups all safety relevant components and systems are included. Generally, aging management programs cover these two groups of components; life time management covers all of above groups. This paper concentrates on mechanical systems and components; it summarizes the practical approach to life time management as it is realized in German nuclear power plants. The application is discussed using dedicated examples.


Author(s):  
Andre´ Voßnacke ◽  
Wilhelm Graf ◽  
Roland Hu¨ggenberg ◽  
Astrid Gisbertz

The revised German Atomic Act together with the Agreement between the German Government and the German Utilities of June 11, 2001 form new boundary conditions that considerably influence spent fuel strategies by stipulation of lifetime limitations to nuclear power plants and termination of reprocessing. The contractually agreed return of reprocessing residues comprises some 156 casks containing vitrified highly active waste, the so-called HAW or glass canisters, coming form irradiated nuclear fuel assemblies to be shipped from COGEMA, France and BNFL, UK to Germany presumably until 2011. Several hundred casks with compacted residues and other waste will follow. The transports are scheduled presumably beyond 2020. The central interim storage facilities in Ahaus and Gorleben, formerly intended to accumulate up to 8,000 t of heavy metal (HM) of spent fuel from German nuclear power plants, offer sufficient capacity to receive the totality of residues to be returned from reprocessing abroad. GNB has developed, tested, licensed, fabricated, loaded, transported and stored a large number of casks for spent fuel and is one of the world leaders for delivering spent fuel and high level waste casks. Long-term intermediate storage of spent fuel is carried out under dry conditions using these casks that are licensed for transport as well as for storage. Standardized high performance casks such as the types CASTOR® HAW 20/28 CG, CASTOR® V/19 and CASTOR® V/52 meet the needs of most nuclear power plants in Germany. Up to now GNS has co-ordinated the loading and transport of 27 casks loaded with 28 canisters each from COGEMA back to Germany for storage in Gorleben for up to 40 years. In all but one case the cask type CASTOR® HAW 20/28 CG has been used.


1985 ◽  
Vol 50 ◽  
Author(s):  
Sten Bjurström ◽  
Tönis Papp

Nuclear power plays an important role in the Swedish power production. From this year on 45–50% of the Swedish electricity will be produced by nuclear power plants, the rest being hydro power.


Sign in / Sign up

Export Citation Format

Share Document