Analysis and control technique of fixturing deformation mechanism of thin-walled workpiece

2007 ◽  
Vol 43 (04) ◽  
pp. 211 ◽  
Author(s):  
Guohua QIN
2017 ◽  
Vol 180 ◽  
pp. 647-663 ◽  
Author(s):  
Xiao Wang ◽  
Marco Morandini ◽  
Pierangelo Masarati

Energies ◽  
2021 ◽  
Vol 14 (22) ◽  
pp. 7514
Author(s):  
S.M. Ferdous ◽  
Farhad Shahnia ◽  
GM Shafiullah

The two common mechanisms of load-shedding and renewable curtailment can prevent provisional overloading and excessive generation and the subsequent unacceptable voltage and frequency deviation in standalone microgrids (MGs), which makes MGs less resilient and reliable. However, instead of enabling load-shedding or renewable curtailment, such overloading or over-generation problems can be alleviated more efficiently and cost-effectively by provisionally interconnecting the neighboring MGs to exchange power amongst themselves. In such a scheme, the interconnected MGs can supply their local demand, as well as a portion of the demand of the adjacent MGs. In order to implement this strategy, a three-phase ac link can be used as the power exchange network, while each MG is coupled to the link through a back-to-back power electronics converter, in order to maintain the autonomy of each MG if they are eachoperated under different standards. This paper proposes a suitable decentralized power management strategy without a communication link between the MGs to achieve power-sharing amongst them and alleviate unacceptable voltage and frequency deviation along with the required control technique for the power electronic converters, which can be implemented at the primary level based on the measurement of the local parameters only. To this end, one of the converters should always regulate the dc link voltage while the other converter should operate in droop control mode when the MG is healthy and in constant PQ mode when overloaded or over-generating. Suitable status detection and mode transition algorithms and controllers were also developed and are proposed in this paper. The performance of the proposed power exchange and control mechanisms were evaluated and verified via PSIM®-based numerical simulation studies. The stability and sensitivity of the proposed power exchange topology are also analyzed against several critical design and operational parameters.


2014 ◽  
Vol 889-890 ◽  
pp. 380-384
Author(s):  
Zhi Liu ◽  
Peng Fang ◽  
Di Wu ◽  
Dong Li

This article describes the design process of pumping stations of crawler full hydraulic drilling rig. The principle of full hydraulic drilling rig pumping station,scheme selection, hydraulic components selection and structural design of the tank were presented. The system used double loops in which some advanced hydraulic components and control technique were adopt.


2013 ◽  
Vol 712-715 ◽  
pp. 831-834
Author(s):  
Xiao Jie Chen

Materials in sports building space plays not only a supporting role but also an important part of building exhibition. With the rise of intelligent and ecological buildings, as a building enclosure material properties and role will become more prominent. New advances in technology make material has been not just enclosure system, but with the external environment for building dialogue interface, visual, structure and control technique of bonding layer. How effectively function technology element integration in material artistic expressive force is the important thing in current material design.


Sign in / Sign up

Export Citation Format

Share Document