Although project management is often said to have its roots in other traditional fields, such as construction, Morris (2002) asserts that modern project management practices have their origins in the 1950s US aerospace agencies. Much has been written about Information System (IS) / Information Technology (IT) project initiatives in both the public and private sectors. In fact, many information systems frequently fall short of their requirements, and are, more often than not, costlier and arrive later than anticipated, if indeed they are completed at all. For instance, according to a report for the Organization for Economic Co-operation and Development (2001), failures of major IT investments and key systems development projects have raised concerns for the achievement of service improvement through information technology. Additionally, it has been argued that failures in IT projects are more common than failures in any other aspect of modern business (Nulden, 1996). The widely-cited Standish Group (1994) study, carried out in the US, classified IT projects as follows: • Resolution Type 1 (Project Success): The project is completed on-time and on-budget, with all features and functions as initially specified. • Resolution Type 2 (Project Challenged): The project is completed and operational but over-budget, over the time estimate, and offers fewer features and functions than originally specified. • Resolution Type 3 (Project Impaired): The project is cancelled at some point during the development cycle. The report estimated the success rate was only 16.2%, while challenged projects accounted for 52.7%, and impaired projects (cancelled) amounted to 31.1%. Since large complex projects in any area are difficult to organize, it could be said that the level of abstraction required often leads to a lack of understanding between all stakeholders involved with the project. Callahan and Moretton (2001) describe software design as being “in the code”. They assert that since it is not visible, it makes it hard to use software design as a focal point for development project coordination and integration, unlike many physical designs which can be made visible to all project participants. As a result of this “invisibility”, managing the development of an IS project is arguably more problematic than project management within the manufacturing sector because software development is often a highly conceptual and complex process. Indeed, a lack of adequate project management knowledge could be said to be a major contributing factor to unsuccessful IS projects. For instance, as project managers should be aware, unless specific objectives and clear-cut end points have been set, it can be difficult to know if a milestone has been reached and indeed if the required end-product has been produced. However, making use of proprietary tools such as Microsoft™ Project is sometimes mistakenly thought of as project management, whereas real project management expertise goes beyond the mere production of Gantt or Pert (Program Evaluation Review Technique) charts, which simply represent project activities in the form of bar charts or flow diagrams. As Mandl-Striegnitz et al. (1998) point out, important project management techniques include estimation of costs and explicit identification of risks. Clearly, there is a need for more in-depth research to gain a better understanding relating to the complex role of project management within the whole IS design and development process. This discussion considers how these problems affect contemporary IS project management research and explores the methodological approaches open to researchers carrying out investigations in this area.

Author(s):  
Maggie McPherson

Although project management is often said to have its roots in other traditional fields, such as construction, Morris (2002) asserts that modern project management practices have their origins in the 1950s US aerospace agencies. Much has been written about Information System (IS) / Information Technology (IT) project initiatives in both the public and private sectors. In fact, many information systems frequently fall short of their requirements, and are, more often than not, costlier and arrive later than anticipated, if indeed they are completed at all. For instance, according to a report for the Organization for Economic Co-operation and Development (2001), failures of major IT investments and key systems development projects have raised concerns for the achievement of service improvement through information technology. Additionally, it has been argued that failures in IT projects are more common than failures in any other aspect of modern business (Nulden, 1996).


Author(s):  
Jeffrey L. Brewer

Utilizing good project management practices has become one of the key differentiators in delivering successful information technology projects. Kerzner (2001) defines project management as “the planning, organizing, directing, and controlling of company resources for a relatively short-term objective that has been established to complete specific goals and objectives” (p. 4). The field of project management has seen explosive growth in the amount of individuals holding a job title such as project manager, in the amount of research being conducted, and in the amount of books and articles being published. This paper explores the reasons for this growth, the reasons why project management has become so important to the on-going success of IT projects and thus the success of organizations and what future directions the field of project management will travel.


2013 ◽  
pp. 84-117
Author(s):  
Salmiza Saul Hamid ◽  
Mohd Hairul Nizam Md Nasir ◽  
Shamsul Sahibuddin ◽  
Mustaffa Kamal Mohd Nor

Despite the widespread use of sound project management practices and process improvement models over the last several years, the failure of software projects remains a challenge to organisations. As part of the attempt to address software industry challenges, several models, frameworks, and methods have been developed that are intended to improve software processes to produce quality software on time, under budget, and in accordance with previously stipulated functionalities. One of the most widely practised methods is the Team Software Process (TSP). The TSP was designed to provide an operational framework for establishing an effective team environment and guiding engineering teams in their work. This chapter provides an overview of the TSP and its associated structures and processes. It also highlights how the TSP operational framework can assist project manager and software development team to deliver successful projects by controlling and minimizing the most common software failure factors. Comparative analysis between the TSP and conventional project management has also been presented. Additionally, the results of TSP implementation in industrial settings are highlighted with particular reference to scheduling, quality, and productivity. The last section indicates additional advantages of TSP and comments on the future of TSP in the global software development project.


Author(s):  
Demetrios Sarantis ◽  
Yannis Charalabidis ◽  
Dimitris Askounis

The implementation of electronic Government projects in public sector organisations is a challenging task, due to technical, organisational and cultural specificities of the domain. Research shows that such IT projects have higher failure rates than similar approaches in the private sector, also indicating the lack of a method to transfer knowledge and apply best management practices in an effective way. The proposed management approach aims to recognise structure and reuse past successful attempts, in ways that support the overall viability of an e-Government project. After stating the fundamental principles of project management that apply to public sector IT projects, the authors present a conceptual model for e-Government project management, including entities such as dimensions, goals, activities, deliverables and roles that can be structured and adapted to cover all types of relevant projects in an out-of-the-box approach. This knowledge base of predefined project components can then be populated and utilised in making more informed decisions for effective project management of e-Government initiatives. This way, the proposed method supports public officials and practitioners in learning from past experience projects and in designing and running e-Government projects in a more systematic manner, thus, significantly increasing the likelihood of project success.


Author(s):  
Alice S. Etim ◽  
Chandra Prakash Jaiswal ◽  
Marsheilla Subroto ◽  
Vivian E. Collins Ortega

The management of information technology (IT) projects has experienced a shift from predictive and traditional project management methodology to more adaptive practices like Agile. Agile method and its developmental stages are a response to current business-changing trends and computing needs of society. The process assists in accelerating product delivery with rapid feedback and cost-conscious, consecutive iteration, distinguishing it from other traditional practices like the waterfall method. This chapter contributes to the existing literature by discussing agile project management for IT projects, with a specific case of the Africa IT project – the Books for Africa Project (hereafter called, Book Project). The first part of the chapter is used to review the literature on Agile IT projects. The Book Project as a case is an IT project, and it is discussed in detail in the chapter. The chapter concludes with transferable lessons for projects in developing countries, specifically those located in Sub-Saharan Africa.


Author(s):  
Evon M.O. Abu-Taieh ◽  
Jeihan M. Abu-Tayeh ◽  
Alia Abu-Tayeh

Information Technology project management lingers between science and art. Many will not dwell on such a thought, and define the information technology project manager as the one person that gets the information technology project done. This paper introduces 74 best practices and traits for the novice information systems project manager. The 74 personal traits and best practices were collected from 35 project managers and are based on personal experiences on a number of IT projects. This article provides an interactive platform for the information system technology project manager by catering to their needs for practical insights toward efficient and individually tailored project management.


Author(s):  
Joseph T. Catanio ◽  
Gary Armstrong ◽  
Joanne Tucker

This research paper describes key information technology (IT) project management activities in terms of project scope, time, and cost management, namely the triple constraint. The authors contend that the ability to properly manage and execute these activities is the quintessential component that oftentimes drives whether projects succeed or fail. The literature shows that IT projects have a dismal success rate but successful projects have been on the rise. The authors attempt to determine if the increase of successful projects correlates to the increase in the number of certified project managers. Empirical evidence is presented that indicates certified project managers do not perform project scope, time, and cost management activities better than project managers without professional certification credentials.


Author(s):  
Rudy M Harahap ◽  
Andri Setiawan ◽  
Adi Subakti Kurniawan ◽  
Merlin Mulia

The success rate of information technology (IT) projects is still low. Based on one survey done in 1990s, only about 10% of software development project could be finished according to its planned budget and schedule. Another study in 1995 found that only 16.2% IT project succeed, and at the same time more than 31% IT projects were cancelled before finished. It has been found a lot of IT projects had been implemented with swelling budget. Although it is still debatable, one of the reasons of IT project implementation failure is because risk management in some IT projects is not implemented by the IT providers. The objectives of this research are to get knowledge and assess risks in implementing IT projects. This research also gives recommendations in mitigating IT project risks. In two projects that were used as sample of this research, it has been found some risks that could be happened in IT projects. That risks were then assessed based on the probability and its impact, and finally produced the recommendation for risk mitigation. All risks are described in the Risk Priority, moreover risk probability and impact is described in the probability-impact matrix from all of 4 levels. This research could improve the awareness of IT providers in Indonesia about the important of implementing IT risk management so that more IT projects in Indonesia could be run successfully.Keywords: Risk assessment, information technology project, impact, frequency


Author(s):  
Charity Udodirim Ugonna ◽  
Edward Godfrey Ochieng

The aim of this study was to assess the application of strategic project management (SPM) in Nigerian public research organisations. A case study approach involving four R and D organisations in Nigeria was used. A total of 213 questionnaires were retrieved and these were analysed using quantitative research software, SPSS version 21. The results revealed that 95 per cent of respondents acknowledged that projects executed by public research organisations were planned, but the conventional project management practices were used instead of strategic project management (SPM) principles. In addition, it was found that the level of implementation of the project management practices were also inadequately implemented as such affected the organisation's performance adversely. As established in this study, the concept of strategy is changing and to address the factors that affect research and development project implementation, senior project practitioners need to pay more attention to strategic, operational and project risks.