The Process DNA Model of Significant Model Project

2011 ◽  
Vol 121-126 ◽  
pp. 504-508
Author(s):  
Bin Huai ◽  
Hai Cheng Yang ◽  
Neng Wan

To solve the problem of “two command line” existing in the significant model project management at present, this paper proposes a method of process DNA-based process management for significant model project. First, the technology process and management process of significant model project are analyzed. Second, the process DNA double-strand of significant model project is constructed employing the elements of technology and management as building blocks; and also, the two-level structure of the process DNA double-strand is analyzed. Third, the process DNA model of significant model project is established and the related formal definitions are given.

2020 ◽  
pp. 1-5
Author(s):  
Joanna Jasińska ◽  
◽  
Hab Hab ◽  

The aim of the article is both an attempt to identify the relationship between various disciplines of management sciences (change management, process management, project management) and a reference to the issue of their application and integration in healthcare organizations. It seems that this is a serious problem in the context of the inevitability of making changes in medical organizations, especially in the face of an ongoing pandemic (in a relatively short time). In addition, the ever-increasing complexity of healthcare organizations, while the pace of technological innovation in medicine. The article is a review - it integrates and interprets the current state of knowledge in the field of change management, process management and project management, indicating the need and possibilities of integration and symbiosis of various management sub-disciplines. It was developed primarily using critical literature analysis.


2021 ◽  
Vol 11 (1) ◽  
pp. 6
Author(s):  
Orazio Aiello

The paper deals with the immunity to Electromagnetic Interference (EMI) of the current source for Ultra-Low-Voltage Integrated Circuits (ICs). Based on the properties of IC building blocks, such as the current-splitter and current correlator, a novel current generator is conceived. The proposed solution is suitable to provide currents to ICs operating in the sub-threshold region even in the presence of an electromagnetic polluted environment. The immunity to EMI of the proposed solution is compared with that of a conventional current mirror and evaluated by analytic means and with reference to the 180 nm CMOS technology process. The analysis highlights how the proposed solution generates currents down to nano-ampere intrinsically robust to the Radio Frequency (RF) interference affecting the input of the current generator, differently to what happens to the output current of a conventional mirror under the same conditions.


2021 ◽  
Vol 13 (11) ◽  
pp. 6347
Author(s):  
Marco Nunes ◽  
António Abreu ◽  
Célia Saraiva

Projects are considered crucial building blocks whereby organizations execute and implement their short-, mid-, and long-term strategic visions. Projects are thought, developed, and implemented to solve problems, drive change, satisfy unique needs, add value, and exploit opportunities, just to name a few objectives. Although existing project management tools and techniques aim to deliver projects with success, according to the latest reviewed literature, projects still keep failing at an impressive pace. Among the extensive list of factors that may threaten project success, several articles from the research literature place particular importance on a still underexplored factor that may strongly lead to unsuccessful project delivery. This factor—usually known as corporate behavioral risks—usually emerges and evolves as organizations work together to deliver projects across a bounded period of time, and is characterized by the mix of formal and informal dynamic interactions between the different stakeholders that constitute the different organizations. Furthermore, several articles from the research literature also point out the lack of proper models to efficiently manage corporate behavioral risks as one of the major factors that may lead to projects failing. To efficiently identify and measure how such corporate behaviors may contribute to a project’s outcomes (success or failure), a heuristic model is proposed in this work, developed based on four fundamental fields ((1) project management, (2) risk management, (3) corporate behavior, and (4) social network analysis), to quantitatively analyze four critical project social networks ((1) communication, (2) problem-solving, (3) advice, and (4) trust), by applying the theory of social network analysis (SNA). The proposed model in this work is supported with a case study to illustrate its implementation and application across a project lifecycle, and how organizations can benefit from its application.


2021 ◽  
Vol 26 (4) ◽  
pp. 61-68
Author(s):  
Tomáš Novotný ◽  
Simona Novotná

This contribution deals with the specification of the current immunity of strategy and status and level of procedural management in special organizational structures referred to as industrial clusters. It represents selected specifics of the design and application of innovative tools, system integration, and agile project management of clusters. It describes and explains the context between the strategy, the organizational structure, and the need for project procedural management at the current position and competitiveness of clusters on the market in demanding energy and environmental conditions. In the end, it shall submit its own author's design scheme for a new organizational project aimed at a cluster structure and draft management process and coordination of clustered projects for their clients.


Author(s):  
Muhammad T. Hatamleh

The majority of the approaches to managing project risk follow the logic of process groups. Project Management Institute (PMI) has 29 tools and techniques related to risk management process groups. Consequently, engineering and business schools have been accused of educating managers with sharp analytical skills but little understanding of social problems. The literature suggests that too much attention is focused on learning the techniques and formalities of risk management but not enough on the advanced issues of management. Also, the literature argues that there are two approaches to project management (hard and soft). The hard side only covers part of the managerial aspects which helps to manage foreseeable uncertainties. However, unforeseeable uncertainties need skills that related to soft side approaches such as emotional intelligence, navigating the organization’s culture, risk attitude, participative leadership style, and managing the relationship with stakeholders. This study provides an intensive review of the literature to discuss the need for integrating the hard and soft sides of management to achieve an effective risk management process. In addition, it proposes a conceptual framework that provides guidelines to enhance overall risk management efficiency.


2019 ◽  
Vol 5 (2) ◽  
pp. 76-82
Author(s):  
Cornelius Mellino Sarungu ◽  
Liliana Liliana

Project management practice used many tools to support the process of recording and tracking data generated along the whole project. Project analytics provide deeper insights to be used on decision making. To conduct project analytics, one should explore the tools and techniques required. The mostcommon tool is Microsoft Excel. Its simplicity and flexibility make project manager or project team members can utilize it to do almost any kind of activities. We combine MS Excel with R Studio to brought data analytics into the project management process. While the data input process still using the old way that the project manager already familiar, the analytic engine could extract data from it and create visualization of needed parameters in a single output report file. This kind of approach deliver a low cost solution of project analytics for the organization. We can implement it with relatively low cost technology onone side, some of them are free, while maintaining the simple way of data generation process. This solution can also be proposed to improve project management process maturity level to the next stage, like CMMI level 4 that promote project analytics. Index Terms—project management, project analytics, data analytics.


2016 ◽  
Vol 6 (2) ◽  
pp. 26-35
Author(s):  
Vladimír Krajčík ◽  
Pavel Vlček

Abstract The article focuses on process management in public administration using the specific case study of the statutory city of Ostrava. Based on the selected part of the PAPRIS methodology, the process management is verified, and conclusions from the application of information system e-SMO ("Electronic Statutory City of Ostrava") are generalized. Ostrava is third the biggest city in Czech Republic with approximately 320 thousand citizen. Article describes experiences with SW implements, which are used for model of process in public administration. Particulary at local authority of Ostrava town. Model of process is a basis for reengineering of process in state administration and preparation for implementation of big information systems. Mapping of process is providing implement and confirmation methodology to identify existing processes. Problem with its using consist in that, senior manager don’t informs, what organization is determination by processes. If are not described in given to organization current processes, or how would have had look new optimum processes, will not endeavour about reengineering successful. Procedural analysis namely offer tool and check methodology to identification current suit („ at") and it is possible him use either as instruction („ how so about to be") for reengineering function handling administrative and self-rule activities. Purpose of the article: The PAPRIS methodology was used when defining the objectives for implementation of the information system for public administration (PAPRIS - Process Approach - Public and Regional Information System). This methodology has been elaborated by one of the authors and published in a very general scheme when solving many case studies (Krajčík, 2006), (Krajčík, 2007), (Krajčík, 2013) (Krajčík, 2014). We assume that the PAPRIS is primarily a methodology with incorporated elements of procedural approach for project management in public administration information systems (PAIS). The specific supporting process of communication between the client and the e-SMO ("Electronic Statutory City of Ostrava") system has been chosen for verification. The model of supporting communication process, created by ARIS tools, is crucial, and the structure of scripts (ICM and IVR) is subsequently made. The aim of this article is to verify that the methodology is sufficient and appropriate to manage such a large project such, undoubtedly, is the e-SMO (Vlček, 2009). Methodology/methods: Defined productive and non-productive processes with their defined process cuts represent a crucial category for the process structure of IS projects. This is fully accepted by the PAPRIS methodology. Process cuts are understood, in the logic modelling according to the PAPRIS methodology, as clearly defined logic directional cuts in three-dimensional space of all project processes. The process set is systemically categorized, in a given logic directional cut, into mutually disjoint process subsets, which are characterized by this particular directional operator. The directional operator always has a clear logical allocation that is based on the construction of a process view. Theoretically, an infinite number of process views can be used. One of the important issues in a methodology for the case studies includes the size of the research sample. It is usually assumed that there is no ideal number of cases and that the number between four and ten usually provides good results. Other authors defining against any quantitative standards for any determination of the sample size of the case studies, since such an approach denies the internal logic of this methodology and the richness of the information obtained from participants in the research. Research which is carried out using case studies does not aspire on compliance with the requirement the representativeness of the sample. (Štrach, 2007). Methodology of case studies is among the established guidelines of qualitative research (Štrach, 2007). Research on using case studies in the last 30 years has seen an extraordinary increase in social-scientific research, including research on business and management (Dul, Hak, 2008). Scientific aim: The essential aim of this study is to describe the way the process cut defines a productive process and non-productive process, in accordance with the PAPRIS methodology using the specific example. While the triggering mechanism of the project production process is an event causing its own production - i.e. the specific output with added value for the customer, the project of non-productive process is caused by the project management event. Therefore, it is caused by the need to control, monitor, track, inspect, evaluate outputs, decide and regulate the project implementation. Findings: Within the support of the communication process, two examples were used to verify the methodology. The global perspective on the process was created in ARIS tools and the communication between the call centre and the client was made in Visio tools. The PAPRIS methodology is based on the concept of process variability, which has been clearly formulated. The fundamental direction of the process development, anticipated changes and the opportunity to react to them in accordance with defined objectives of the PAIS project are guaranteed.


2015 ◽  
Vol 764-765 ◽  
pp. 895-899
Author(s):  
Shiow Luan Wang ◽  
Thi Hoa Vu

Construction projects are becoming ever more complex and time driven, especially as the amount of project data and active project participants’ increase. For achieving a project success, project management not only must to meet time, cost, quality objectives, but also satisfies the project stakeholders needs related to the project management process. Project managers were difficult to effectively seizing, collecting and handling information which are generated from different systems. The elements of information presentation in web-based was contributed an important role to project management success. The purpose of this study is to provide a background to denote the enhancing project management via information presentation based on effective information technology/information systems which are emphasized in web-based.


2021 ◽  
Author(s):  
marco nunes ◽  
Antônio José de Abreu Pina

Projects can be seen as the crucial building blocks whereby organizations execute and implement their short, and long-term strategic vision. Projects are thought to solve problems, drive change, satisfy unique needs, add value, or exploit opportunities, just to name a few. In order to successful deliver projects, project management tools and techniques are applied throughout a project´s lifecycle, essentially to efficiently and in a timely manner, identify and manage project risks. However, according to latest reviewed literature, projects keep failing at an impressive rate. Although research in the project management field argues that such failure rate is due to a huge variety of reasons, it highlights particular importance to a still underexplored and not quite well understood (regarding how it emerges and evolves) risk type, that may lead projects to failure. This risk type, called as corporate behavioral risks, usually emerge, and evolve as organizations work together across a finite period of time (for example, across a project lifecycle) to deliver projects, and is characterized by the mix of countless formal and informal dynamic interactions between the different elements that constitute the different organizations. Understanding the extent to which such corporate behavior influences project´s outcomes, is a breakthrough of high importance that positively impacts two dimensions; first, enables organizations that deliver projects (but not only), to increase the chances of project success, which in turn is a driver of sustainable business, because it allows the development and implementation of effective, and timely corrective measures to project´s tasks and activities, and second, it contributes to the scientific community (on the organizations field), to generate valuable and actionable new knowledge regarding the emergence and evolution of such cooperative risks, which can lead to the development of new theories and approaches on how to manage them. In this work, we propose a heuristic model to efficiently identify and analyze how corporate behavioral risks may influence project´s outcomes. The proposed model in this work, lays its foundations on four fundamental fields ((1) project management, (2) risk management, (3) corporate behavior, and (4) social network analysis), and will quantitatively measure four critical project social networks ((1) communication, (2) problem-solving, (3) advice, and (4) trust) that usually emerge as projects are being delivered, by applying the theory of social network analysis (SNA), more concretely, SNA centrality metrics. The proposed model in this work is supported with a case study to illustrate its implementation across a project lifecycle, and how organizations can benefit from its application.