The Numerical Simulation and Deformation Analysis to the Deep Foundation Pit of Diaphragm Wall Based on Midas/GTS
2015 ◽
Vol 733
◽
pp. 456-459
Keyword(s):
Taking the J2 area YK10+615~YK10+650 miles section related to the connection line of River-crossing tunnel to Nanjing plum delta--the youth Olympic axis underground traffic system engineering as the background, the 3d model is established by using finite element software MIDAS/GTS, the mileage period of excavation process is simulated, discuss the influence of excavation on adjacent soils. Calculation results show that the excavation will inevitably cause deformation of adjacent soil, and comparing the results of calculate and the actual monitoring data show that the method has certain guiding significance to actual engineering.
2015 ◽
Vol 744-746
◽
pp. 579-583
2021 ◽
Keyword(s):
2019 ◽
Vol 652
◽
pp. 012002
2019 ◽
Vol 304
◽
pp. 032046
Keyword(s):
2011 ◽
Vol 368-373
◽
pp. 542-548
2014 ◽
Vol 1055
◽
pp. 131-134
2014 ◽
Vol 536-537
◽
pp. 1589-1593
◽
Keyword(s):
2013 ◽
Vol 353-356
◽
pp. 3598-3605
2011 ◽
Vol 368-373
◽
pp. 1327-1331