Abstract. The Heze section of Rizhao-Lankao High-speed Railway (RLHR-HZ) has been under construction since 2018 and will be operative by the end of 2021. However, there is a concern that land subsidence in Heze region may affect the normal operation of RLHR-HZ. In this study, we investigate the contemporary ground deformation in the region between 2015 and 2019 by using more than 350 C-band interferograms constructed from two tracks of Sentine-1 data over the region. The Small Baselines Subset (SBAS) technique is adopted to compile the time series displacement. We find that the RLHR-HZ runs through two main subsidence areas: One is located east of Heze region with rates ranging from −4 cm/yr to −1 cm/yr, and another one is located in the coal field with rates ranging from −8 cm/yr to −2 cm/yr. A total length of 35 km of RLSR-HZ are affected by the two subsidence basins. Considering the previous investigation and the monthly precipitation, we infer that the subsidence bowl east of Heze region is due to massive extraction of deep groundwater. Close inspections of the relative locations between the second subsidence area and the underground mining reveals that the subsidence there is probably caused by the groundwater outflow and fault instability due to mining, rather than being directly caused by mining. The InSAR-derived ground subsidence implies that it's necessary to continue monitoring the ground deformation along RLSR-HZ.

2020 ◽  
Vol 20 (12) ◽  
pp. 3399-3411
Author(s):  
Chuanguang Zhu ◽  
Wenhao Wu ◽  
Mahdi Motagh ◽  
Liya Zhang ◽  
Zongli Jiang ◽  
...  

Abstract. The Heze section of Rizhao–Lankao high-speed railway (RLHR-HZ) has been under construction since 2018 and will be in operation by the end of 2021. However, there is a concern that land subsidence in the Heze region may affect the regular operation of RLHR-HZ. In this study, we investigate the contemporary ground deformation in the region between 2015 and 2019 by using more than 350 C-band interferograms constructed from two tracks of Sentinel-1 data over the region. The small baseline subset (SBAS) technique is adopted to compile the time-series displacement. We find that the RLHR-HZ runs through two main subsidence areas: one is located east of the Heze region with rates ranging from −4 to −1 cm yr−1, and another one is located in the coalfield with rates ranging from −8 to −2 cm yr−1. A total length of 35 km of RLHR-HZ is affected by the two subsidence basins. Considering the previous investigation and the monthly precipitation, we infer that the subsidence bowl east of the Heze region is due to massive extraction of deep groundwater. Close inspections of the relative locations between the second subsidence area and the underground mining reveals that the subsidence there is probably caused by the groundwater outflow and fault instability due to mining, rather than being directly caused by mining. The InSAR-derived ground subsidence implies that it is necessary to continue monitoring the ground deformation along RLHR-HZ.


Author(s):  
Kaiwen Shi ◽  
Yong Luo

Abstract. The fast railway line B is a high-speed railway passenger passageway in Beijing, with a total length of 40.75 km. In the plain area, the railway passes through the land subsidence area of Beijing from south to north, which poses a certain threat to the normal operation of a high-speed railway. Using layered monitoring data for the period 2009–2014 from station A, this paper analyses dynamic changes in the annual subsidence rate and the rate and percentage of soil deformation at different depths, as well as the compression deformation law of soil with different lithology and depth with the change of the water level. The results show that (1) since 2012, the proportion of shallow-layer (≤82 m) compression and settlement contribution has gradually decreased, while the proportion of deep-layer (> 82 m) compression has significantly increased; (2) during the deformation process of layered soil, the amount of compression is closely related to the change of groundwater level; and (3) the shallow, middle and deep strata show obvious viscoelastic–plastic deformation characteristics on the whole.


2017 ◽  
Vol 33 (3) ◽  
pp. 179-200 ◽  
Author(s):  
Ryszard Hejmanowski ◽  
Agnieszka A. Malinowska

AbstractThe modeling of strains and deformations in salt mine areas encounters considerable difficulties because of the varying strength properties of salt, the complex morphological build of dome deposits and the rheological properties of salt. These properties have impacted the development of salt extraction for hundreds of years and the fact that the accurate determining of strains in a given specified moment and place are burdened with high uncertainty. Numerical modeling is useful when the model is reduced to one or several salt chambers. A broader range of underground post mining void considerably lowers the accuracy and efficiency of the calculations of such models. Stochastic models allow for a 3D modeling of the entire mining complex deposit, provided the model has been parametrized in detail. The methods of strains and deformations modeling were presented on the example of one of the biggest salt mines in Europe, where a volume of over 21 million m3 of salt was extracted. The stochastic model could be parametrized thanks to the documented results of measurements of convergence of the underground mining panels and leveling on the surface. The use of land subsidence inversion in the least squares method allowed for estimating the optimum values of parameters of the model. Ground deformation modeling was performed using the two-parameter time function, which allows for a simulation to be carried out in time. In the simulation, the convergence of underground excavations and the transition in time the effects of convergence into ground subsidence was taken into account. The detailed analysis of the geological conditions lead to modeling deviation of the subsidence trough. The accuracy of the modeling results was qualitatively and quantitatively confirmed by a comparison of the modeled to measured values of the vertical ground movement. The scaled model can be applied in future mining extraction projects in order to predict the strains and deformations for an arbitrary moment in time.


Annals of GIS ◽  
2010 ◽  
Vol 16 (2) ◽  
pp. 91-102 ◽  
Author(s):  
Linlin Ge ◽  
Xiaojing Li ◽  
Hsing-chung Chang ◽  
Alex Hayman Ng ◽  
Kui Zhang ◽  
...  

Author(s):  
Yun Zhang ◽  
Lianhuan Wei ◽  
Jiayu Li ◽  
Shanjun Liu ◽  
Yachun Mao ◽  
...  

More and more high-speed railway are under construction in China. The slow settlement along high-speed railway tracks and newly-built stations would lead to inhomogeneous deformation of local area, and the accumulation may be a threat to the safe operation of high-speed rail system. In this paper, surface deformation of the newly-built high-speed railway station as well as the railway lines in Shenyang region will be retrieved by time series InSAR analysis using multi-orbit COSMO-SkyMed images. This paper focuses on the non-uniform subsidence caused by the changing of local environment along the railway. The accuracy of the settlement results can be verified by cross validation of the results obtained from two different orbits during the same period.


Author(s):  
Jie-Ling Xiao ◽  
Pu Jing ◽  
Si-Xin Yu ◽  
Ping Wang

Polyurethane-reinforced ballasted track (PRBT) can improve the integrity of ballasted track structures and satisfy the high-stability requirements of high-speed railways. In this study, the quality evolution law of PRBT structures after being launched into train service was analyzed, and a reference for structural optimization and maintenance operation was provided. The track geometric state of the PRBT test section of a high-speed railway was measured and monitored for nearly one year after it was launched into operation, and the ballastless track of the adjacent section was selected as a reference. The geometric states of the tracks were evaluated and compared using various parameters, including sliding standard deviation, average standard deviation, and track irregularity spectrum density. Results show that the track quality indexes of the test section, which were in operation for nearly one year, were slightly over the limit. Moreover, the fastener can be finely adjusted for the high-value index sections to further improve the ride comfort. The application effect of PRBT in the subgrade fracture zone was good, which could satisfy the requirements of high-quality transportation as well as the normal operation and maintenance of high-speed railway.


2011 ◽  
Vol 383-390 ◽  
pp. 2201-2205
Author(s):  
Xin Xi Liu ◽  
Xue Zhi Wang

Analysis on the characters of ground subsidence of Yangjiaping mining area, with same excavation depth and recovery coefficient, the numerical simulations to nonlinear large deformation using finite-difference method(FLAC) are achieved on the different strip extraction schemes that adopted different mining and reservation width. The result indicates that the subsidence values and horizontal deformation increases with the increasing of the strip extraction width on condition of the same recovery rate. Based on probability density function (PDF) method, the relationship of the coal pillar width, the mining width and ground deformation is acquired, which is some useful reference for using the strip extraction method to control the surface movement and deformation.


Author(s):  
C. Ye ◽  
Y. Yang ◽  
F. Tian ◽  
Y. Luo ◽  
Y. Zhou

Abstract. More than 10 high-speed railway routes with top speeds of 300 km h−1 are expected to be operational from Beijing by the year 2020. However, the safety of these routes is affected by the occurrence of land subsidence. This paper focuses on the Beijing–Tianjin Intercity High-Speed Railway (BTR), the first high-speed railway in China, to analyze the operational safety of high-speed railway routes by analyzing both regional land subsidence and local differential subsidence caused by groundwater drawing. The Beijing construction stratum is mainly composed of cohesive soil, and the BTR has a maximum accumulative subsidence of > 800 mm and a maximum subsidence rate of > 80 mm a−1. In this paper, finite-element software ABAQUS is used to analyze groundwater drawdown and land subsidence caused by local water drawing, and its effect on the bearing capacity of railway bridge pile foundations and the orbit concrete supporting course. The analysis provides a technical basis for developing prevention and control engineering measures against land subsidence so as to guarantee the safe operation of these high-speed railway routes.


Author(s):  
H. Zhou ◽  
Y. Wang ◽  
S. Yan

This paper, obtaining 39scenesof images of the Sentinel-1 A/B, monitored the Cangzhou area subsidence from Mar. 2015 to Dec. 2016 basing on using PS-InSAR technique. The annual average subsidence rate and accumulative subsidence were obtained. The results showed that the ground surface of Xian County,Cang County, Cangzhou urban area had a rebound trend; Qing County, the east of Cang County ,the west of Nanpi County and Dongguang County appeared obvious subsidence, and the accumulated subsidence in Hezhuang village of Dongguang County reached 47 mm. And from that the main reason leading to these obvious subsidence was over-exploitation of ground-water. At last, it analyzed the settlement of the High-Speed Railway (HR) which was north from the Machang town of QingCounty and south to the Lian town of Dongguang County in Cangzhou.The relative deformation of the HR between the two sections which was Lierzhuang village of Cang County and Chenxin village of Nanpi County arrived at 30 mm. Moreover, this paper discussed the application of Sentinel-1 A/B SAR images in monitoring urban land subsidence and the results provided important basic data for the relevant departments.


Author(s):  
Min Shi ◽  
Beibei Chen ◽  
Huili Gong ◽  
Xiaojuan Li ◽  
Wenfeng Chen ◽  
...  

High-speed railways have strict standards of infrastructure deformation and post-construction settlement. The interferometric synthetic aperture radar (InSAR) has the ability to detect ground deformation with a high accuracy and wide coverage and is becoming a useful tool for monitoring railway health. In this study, we analyzed the Beijing–Tianjin Intercity Railway (BTIR) track using InSAR time-series analysis with different data sets. First, by using RADARSAT-2 images, we examined the areas along the BTIR with significant subsidence. Then, we characterized these areas by means of X-band TerraSAR-X data. We adopted the expectation (Ex) and entropy (En) method, combined with GIS spatial analysis, to analyze the ground settlement differences on both sides of the railway. The results show that the area with the most severe differential settlement occurs between 12 and 20 km along the railway and within 120 to 20 m on both sides of the Chaoyang–Tongzhou section (CTS). Thereafter, we analyzed the reasons for the large difference in this area by considering different factors, e.g., regional land subsidence, groundwater level changes, and the dynamic load. In addition, we studied the impact of regional subsidence on the safe operation of the BTIR. The results show that the maximum different settlement along the BTIR is within the safe range, according to the high-speed railway design standard between 2010 and 2015. This study aims to provide technical support for assessing the impact of subsidence on the safety of railway operations.