Caught Between Traditional Inspection and Performance Measurement: Regulation of the Israeli Education System

2020 ◽  
pp. 145-169
Author(s):  
Varda Shiffer
2020 ◽  
Vol 10 (1) ◽  
pp. 63-71
Author(s):  
Nurhaeda Abbas ◽  
Anggraini Sukmawati ◽  
Muhammad Syamsun

Today the performance measurement of Muhammadiyah Luwuk uUniversity’s performance has not formulated yet based on University’s vision and mission. It will affect the strategic steps needed and performance improvement efforts in the future.  Human resource scorecard is the right system to be applied in Muhammadiyah Luwuk University. The purpose of this study is to designed a performance measurement system at Muhammadiyah Luwuk University using the Human Resource Scorecard with four perspectives: stakeholder, academic management and kemuhammadiyaan, operational and innovation, as well as and learning. Data was analyzed by analytical hierarchy process method. This research was conducted by distributing questionnaires, focus group discussions and in-depth interview with stakeholders at Muhammadiyah Luwuk University. The results showed that there were 14 strategic objectives and 33 key performance indicators to be achieved by the priority objectives, which are: empowerment and development of faculty, increased administrative process quality, improved sound budget performance and, improvement of the relationship with stakeholders.


2015 ◽  
Vol 4 (3) ◽  
Author(s):  
Shradha Gawankar ◽  
Sachin S. Kamble ◽  
Rakesh Raut

This paper aims to propose the idea of briefly explaining the balance scorecard by highlighting its use, application in depth. A critical enabler in achieving desired performance goals is the ability to measure performance. Despite the importance of accurately measuring organizational performance in most areas of academic research, there have been very few studies that have directly addressed the question of how overall organizational performance is or should be measured. Perhaps more importantly, none of these studies seems to have significantly influenced how overall organizational performance is actually measured in most of the empirical research that uses this construct as a dependent measure. The most popular of the performance measurement framework has been the balanced scorecard abbreviated as BSC. The BSC is widely acknowledged to have moved beyond the original ideology. It has now become a strategic change management and performance management process. The approach used in this paper is the combination of literature review on evolution of balance score card and its applications in various sectors/organizations/ areas. This paper identify that the balanced scorecard is a powerful but simple strategic tool and the simplicity of the scorecard is in its design. By encompassing four primary perspectives, the tool allows an organization to turn its attention to external concerns, such as the financial outcomes and its customers expectations, and internal areas, which include its internal processes to meet external requirements and its integration of learning and growth, to successfully meet its strategic expectations. This paper provides a comprehensive overview of the balanced scorecard combined with application and strategy, which are now in a better position to begin to recognize managements expectations and to discover new ways to build value for workplace learning and performance within organization.


Author(s):  
B. Verhaelen ◽  
F. Mayer ◽  
S. Peukert ◽  
G. Lanza

AbstractThe trend of globalization has led to a structural change in the sales and procurement markets of manufacturing companies in recent decades. In order not to be left behind by this change, companies have internationalized their production structures. Global production networks with diverse supply and service interdependencies are the result. However, the management of global production networks is highly complex. Key performance indicator (KPI) networks already exist at the corporate level and site level to support the management of complex systems. However, such KPI networks are not yet available to support the management of entire production networks. In this article, a KPI network for global production networks is presented, which links the key figures of the site level and the corporate level. By integrating both levels into a comprehensive KPI network, cause and effect relationship between the production-related KPIs and the strategic KPIs of a corporate strategy become transparent. To this end, this KPI network is integrated into a Performance Measurement and Management (PMM) methodology. This methodology consists of three phases: performance planning, performance improvement, and performance review. For testing the practical suitability, the PMM methodology is applied to the production network of an automotive supplier using a simulation model to estimate the effects of proposed improvement actions of the methodology.


2021 ◽  
Vol 13 (14) ◽  
pp. 7600
Author(s):  
Wenting Ma ◽  
Rui Mu ◽  
Martin de Jong

Co-production is a solution by which the government provides public services. Co-production theory is built upon Western experience and currently focuses on the types of co-production in different policy stages, the barriers and governance strategies for co-production. However, little attention is paid to how political background will influence the co-production process. To fill the gap, we analyzed a case of co-production that occurred in China, and we characterized the political background as consisting of three main political features: political mobility, central–local relations, and performance measurement. Based on an in-depth case study of a government project in a medium-sized Chinese city, the impact and the changes of political features affecting governmental projects in different co-production stages are analyzed and assessed. We find that political features play a critical role in the co-production of China’s large government projects and may separately and jointly affect co-production. Government performance measurement affects the co-design and co-implementation of projects. Political mobility and changes in local government and performance measurement also affect the co-implementation continuity of the project. Political focus affects the co-design of projects. Central-local relations influence the support from higher government and the actual practices of lower government in the co-implementation stage.


Sign in / Sign up

Export Citation Format

Share Document