IS Project Risk in Polish Organizations

1997 ◽  
pp. 375-389
Author(s):  
Marian Kuras ◽  
Agnieszka Zajac
Keyword(s):  
2019 ◽  
Vol 16 (6) ◽  
pp. 60-77
Author(s):  
E. V. Vasilieva ◽  
T. V. Gaibova

This paper describes the method of project risk analysis based on design thinking and explores the possibility of its application for industrial investment projects. Traditional and suggested approaches to project risk management have been compared. Several risk analysis artifacts have been added to the standard list of artifacts. An iterative procedure for the formation of risk analysis artifacts has been developed, with the purpose of integrating the risk management process into strategic and prompt decision-making during project management. A list of tools at each stage of design thinking for risk management within the framework of real investment projects has been proposed. The suggested technology helps to determine project objectives and content and adapt them in regards to possible; as well as to implement measures aimed at reducing these risks, to increase productivity of the existing risk assessment and risk management tools, to organize effective cooperation between project team members, and to promote accumulation of knowledge about the project during its development and implementation.The authors declare no conflict of interest.


2008 ◽  
Vol 1 (2) ◽  
pp. 200-212
Author(s):  
ELIZABETH BULLEN

This paper investigates the high-earning children's series, A Series of Unfortunate Events, in relation to the skills young people require to survive and thrive in what Ulrich Beck calls risk society. Children's textual culture has been traditionally informed by assumptions about childhood happiness and the need to reassure young readers that the world is safe. The genre is consequently vexed by adult anxiety about children's exposure to certain kinds of knowledge. This paper discusses the implications of the representation of adversity in the Lemony Snicket series via its subversions of the conventions of children's fiction and metafictional strategies. Its central claim is that the self-consciousness or self-reflexivity of A Series of Unfortunate Events} models one of the forms of reflexivity children need to be resilient in the face of adversity and to empower them to undertake the biographical project risk society requires of them.


2000 ◽  
Vol 32 (11) ◽  
pp. 58-64
Author(s):  
Mikhail Z. Zgurowsky ◽  
Igor I. Kovalenko ◽  
Kuteiba Kondrak ◽  
Elias Kondrak

2017 ◽  
Vol 8 (1) ◽  
pp. 43-47
Author(s):  
Sufa'atin Sufa'atin

One of the obstacles in project construction is that the project is experiencing delays. The delay is influenced by several factors including the absence of risk recording, the unavoidability of the opportunities and the impact of risks that arise in the project and its handling, and the neglected risks that may disrupt the project. Project risk is the cumulative effect of an uncertain event opportunity, which affects the project objectives. Several methods can be used to handle the occurrence of project risk, one of the methods used to perform a risk assessment is the Probability Impact Matrix (PIM). PIM is a method that can be used to analyze risk qualitatively based on probability and its impact. By using the PIM method, some of the opportunities and impacts of risks that may arise in the project can be identified. In addition, the PIM method can minimize the risks that arise in the project and quickly resolve the risks. Index Terms— Project, Risk, PIM, Possibility, Impact


2014 ◽  
Vol 7 (2) ◽  
pp. 263-284 ◽  
Author(s):  
Budi Hartono ◽  
Deo F.N. Wijaya ◽  
Hilya M. Arini

Purpose – The purpose of this paper is to develop and to empirically verify a model of project risk management maturity (PRMM). Design/methodology/approach – Theoretical work to develop the initial model of risk maturity. Empirical study by a cross-sectional survey to the Indonesian construction industry. Findings – A new model of PRMM is developed and empirically tested. The model is valid (face validity, content validity, discriminant validity, convergent validity, and criterion validity) and reliable. Research limitations/implications – A more comprehensive, follow-up study is required to gain more insights on the actual maturity level of Indonesian construction industry. Practical implications – The model is applicable to assess the organizational maturity level which in turn could be used for improving organization performance. Originality/value – The work demonstrates a novel approach in developing models by emphasizing on the empirical verification.


IEEE Access ◽  
2021 ◽  
pp. 1-1
Author(s):  
Amir Farmahini Farahani ◽  
Kaveh Khalili-Damghani ◽  
Hosein Didehkhani ◽  
Amir Homayoun Sarfaraz ◽  
Mehdi Hajirezaie

Sign in / Sign up

Export Citation Format

Share Document