Mathematical modeling of methane flow in a borehole coal mining system

1989 ◽  
Vol 4 (2) ◽  
pp. 199-212 ◽  
Author(s):  
L�szl� Balla
2020 ◽  
Vol 12 (3) ◽  
pp. 444-453
Author(s):  
Igor SOKOLOV ◽  
◽  
Yury ANTIPIN ◽  
Artem ROZHKOV ◽  
◽  
...  

The purpose work. Substantiation and selection of a safe and effective option of mining technology of the experimental block in the pilot industrial mining of the Skalistoe deposit. Method of research. Analysis and synthesis of project solutions, experience in mining inclined low-thickness ore bodies, economic and mathematical modeling and optimization of the parameters of options mining systems in the conditions of the experimental block. Results of research. As a result of research it was established: - the sublevel caving mining system with the parameters adopted in the project does not guarantee the completeness of the extraction of reserves and the effectiveness of mining operations. Project indicators of extraction by sublevel caving technology with frontal ore drawing are overestimated and difficult to achieve in these geological and technical conditions (combination of low thickness and angle of ore body); project scheme for the delivery and transportation of rock mass seems impractical due to the significant volume of heading workings and increased transportation costs; - eight technically rational options of various mining systems were constructed, most relevant to the geological and technical conditions of the deposit. Five variants of the sublevel chamber system and pillar caving, a project variant of sublevel caving technology with frontal ore drawing and two options flat-back cut-and-fill system were considered; - for mining the Skalistoe deposit, according to the results of economic and mathematical modeling, optimal by the criterion of profit per 1 ton of balance reserves of ore is a option of the technology of chamber extraction with dual chambers, frontal drawing of ore by remote-controlled load-haul-dump machine and subsequent pillars caving, as having the greatest profit; - the calculations justified stable spans of dual chambers (25.3 m) and the width of panel pillars (3 m). With an allowable span of 25.3 m, the roof of the dual chambers will be stable with a safety factor of 1.41, and a panel pillar with a width of 3 m has a sufficient margin of safety (more than 1.6) in the whole range of ore body thickness variation; - the proposed scheme of delivery and transportation of rock mass, which allows to reduce the volume of tunnel works by 26% and the average length of transportation by 10-15% compared with the project. Findings. Developed in the process of modernization the technology sublevel chamber system with double-chamber, compared with the project technology, it is possible to significantly increase the efficiency of mining of the low thickness deposit of rich ores Skalistoe by reducing the specific volume of preparatory-rifled work by 34%, the cost of mined ore by 12%, losses and ore dilution – by 2 and 2.9 times, respectively.


2022 ◽  
Author(s):  
Zhe Bing ◽  
Xing Wang ◽  
Zhenliang Dong ◽  
Luobing Dong ◽  
Tao He

2012 ◽  
Vol 252 ◽  
pp. 207-210
Author(s):  
Jing Zhao Li ◽  
Hui Mei Deng

The framework of initiative coal mining system based on the perception layer of Internet of things (IOT), took the way of combination initiative acquisition, with timing and real time to implement “people, ring, and material” perception of the underground of coal mining is proposed. On this basis, coal mining material active perception system is designed. This system applies computer and IOT perception instead artificial operation in the current coal manufacturing equipment and material field. It is analyzed that design concepts of coal mining material active perception system, function and characteristics, system structure, information collecting, data synchronization and EPC coding of coal manufacturing equipment and material.


Author(s):  
CHUNMING DUAN ◽  
ERTUGRUL TOPUZ

This paper presents a systematic approach to evaluation of the availability of an automated underground coal mining system, the longwall system. Five analytical models are developed by applying the techniques of reliability modeling and stochastic systems analysis. Each model is formulated to evaluate the availability of a longwall system with unique longwall operating logic. The application of these models is illustrated with a case study and the uses of the results are discussed.


1980 ◽  
Author(s):  
Elisabeth J. Dutzi ◽  
Patrick J. Sullivan ◽  
Charles F. Hutchinson ◽  
Christopher M. Stevens

2017 ◽  
Vol 13 (2) ◽  
pp. 223
Author(s):  
Iwan Hermawan

Romusha was a form of labor force mobilization during the Japanese occupation. They are employed to build military infrastructure and explore mining or digging foxholes. One of the center of romusha was Bayah in South Banten. Romusha were came from different parts of Java Island and employed in the Bayah Kozan coal mine. The coal mining system carried out in Bayah, is a closed mine. Mining is done by making a hole to reach ader (ore tree). The mining pits and coal mining activities were conducted with simple equipment under the pressure and torture of the Japanese soldiers who supervised romusha. This paper aims to uncover traces romusha in South Banten through the remains of Japan in the form of Coal Mine Hole. The writing method used is descriptive analysis. Data collection through the activities of literature studies, field surveys, and interviews. The suffering experienced by the romusha in Bayah reflected from the pits where coal mines are numerous in the region Gunungmadur Bayah.Romusha merupakan bentuk mobilisasi tenaga kerja pada masa Pendudukan Jepang. Mereka dipekerjakan untuk membangun sarana prasarana militer dan menggali bahan tambang atau lubang perlindungan. Salah satu daerah yang menjadi tempat pemusatan romusha adalah Bayah di Banten Selatan. Mereka berasal dari berbagai daerah di Pulau Jawa dan dipekerjakan di tambang batu bara Bayah Kozan. Sistem penambangan batu bara yang dilakukan di Bayah adalah tambang tertutup. Penambangan dilakukan dengan cara membuat lubang untuk mencapai ader, yaitu pohon bijih. Kegiatan penggalian lubang tambang dan penambangan batu bara dilakukan dengan peralatan sederhana di bawah tekanan dan siksaan tentara Jepang yang menjadi pengawas romusha. Tulisan ini bertujuan untuk mengungkap jejak romusha di Banten Selatan melalui tinggalan masa Jepang berupa lubang tambang batu bara. Metode penulisan yang digunakan adalah deskriptif analisis. Pengumpulan data melalui kegiatan studi pustaka, survei lapangan, dan wawancara. Penderitaan yang dialami oleh para romusha di Bayah tergambar dari keberadaan lubang-lubang tambang Batu bara yang banyak terdapat di kawasan Gunungmadur, Bayah.