Using time series InSAR to assess the deformation activity of open-pit mine dump site in severe cold area

Author(s):  
Chuangang Gong ◽  
Shaogang Lei ◽  
Zhengfu Bian ◽  
Yu Tian ◽  
Zhouai Zhang ◽  
...  
2020 ◽  
Author(s):  
Jihyun Moon ◽  
Heejeong Seo ◽  
Hoonyol Lee

<p>Musan mine in North Korea is the largest open-pit iron mine in Asia with the proved reserves of about 2.06 billion tons and more than 9 square kilometers. Open-pit mining is one of the surface mining technique extracting minerals from the surface. Vegetation is rarely distributed at the mining site because the topsoil is removed and the ore is mined directly from the surface. Therefore, it is effective to observe surface displacement at the mining site using Interferometric Synthetic Aperture Radar (InSAR) technology. InSAR coherence detects random surface change that measures the activity or stability of the interferometric phase of InSAR data. High coherence will be maintained on the surface where there is no movement and only surface scattering. On the other hand, the surface where there is a lot of movement and volumetric scattering has low coherence value. Therefore, using 12-days InSAR coherence images from Sentinel-1 satellites, for example, it is possible to analyze how active the open-pit mine is during the 12 days. Sentinel-1A satellite images were acquired from June 11, 2015 to May 24, 2016, followed by Sentine-1B satellite images from September 27, 2016 to April 21, 2019. A total of 102 SAR images were downloaded from European Space Agency (ESA) portal. There is a gap between May 24 and September 27, 2016 due to the transition of the data acquisition plan. Over 100 12-days coherence data were obtained by applying InSAR. Stable spots and target spots were selected through average and standard deviation of the entire coherence time series data. Coherence values include not only the mining activity but also the effects of perpendicular baseline, temporal baseline, and weather. Therefore, NDAI (Normalized Difference Activity Index) was newly defined to remove the noise and only the coherence value due to the influence of the mining activity was extracted. The degree of activities can be observed by the time series coherence and NDAI images. This study needs other references related to mining activities in order to analyze the mining activities in more detail. This method can be applied to other open-pit mine.</p>


Author(s):  
Wenmin Hu ◽  
Lixin Wu

Recognition and extraction of mining ground deformation can help us understand the deformation process and space distribution, and estimate the deformation laws and trends. This study focuses on the application of ground deformation detection and extraction combining with high resolution visible stereo imagery, LiDAR observation point cloud data and historical data. The DEM in large mining area is generated using high-resolution satellite stereo images, and ground deformation is obtained through time series analysis combined with historical DEM data. Ground deformation caused by mining activities are detected and analyzed to explain the link between the regional ground deformation and local deformation. A district of covering 200 km<sup>2</sup> around the West Open Pit Mine in Fushun of Liaoning province, a city located in the Northeast China is chosen as the test area for example. Regional and local ground deformation from 2010 to 2015 time series are detected and extracted with DEMs derived from ZY-3 images and LiDAR point DEMs in the case study. Results show that the mean regional deformation is 7.1 m of rising elevation with RMS 9.6 m. Deformation of rising elevation and deformation of declining elevation couple together in local area. The area of higher elevation variation is 16.3 km<sup>2</sup> and the mean rising value is 35.8 m with RMS 15.7 m, while the deformation area of lower elevation variation is 6.8 km<sup>2</sup> and the mean declining value is 17.6 m with RMS 9.3 m. Moreover, local large deformation and regional slow deformation couple together, the deformation in local mining activities has expanded to the surrounding area, a large ground fracture with declining elevation has been detected and extracted in the south of West Open Pit Mine, the mean declining elevation of which is 23.1 m and covering about 2.3 km<sup>2</sup> till 2015. The results in this paper are preliminary currently; we are making efforts to improve more precision results with invariant ground control data for validation.


2020 ◽  
Vol 194 ◽  
pp. 04043
Author(s):  
Guo Xiaoli ◽  
Yan Jiancheng ◽  
Li Xueliang ◽  
Wen Xin ◽  
Li Xingli

The dumps in the open-pit mining area in the eastern grassland are prone to landslides due to the fragile ecological environment, so it is inevitable to reshape the dump slopes. In order to explore a more scientific method for slope shaping of open-pit mine dump, slope stability analysis were used to compare effect of three types of slope-type (wave-shaped, slope-shaped and step-shaped slope shaping method)in outside dumping site of Baori Hiller open-pit mine. The results show that the slope stability is negatively correlated with the slope angle, and the stability of different shaping slopes is realized as wave-shaped slope (F=2.711)> Slope-shaped slope(F=2.513)>Step-shaped slope(F=1.047), in which the wave type and slope type are all within the safe range, but the step type slope is unstable; in consideration of cost, stability and erosion resistance, it is better to set the slope angle of the dump to 15°.The wave-shaped shaping method of the natural dumping of the excavation field outside the Baori Hiller open-pit mine has the best effect and is worth promoting.


CONVERTER ◽  
2021 ◽  
pp. 582-596
Author(s):  
Haoran Li, Et al.

In order to optimize the shape of the compound slope at the end of the open-pit mine under the condition of non-irregular boundary, the compound slope composed of the stope end and the inner dump in the south of the open-pit mine in Pingshuo is studied. Due to the impact of land acquisition, the space of external dump is seriously insufficient, and with the development and change of mining engineering and the influence of geological structure, the problem of compound form optimization and the release and utilization of internal drain space in the south side is generated. Through field investigation and theoretical analysis and numerical analysis method, on the basis of investigating the ore party production status, to establish a 3 d geological model, select two battery profile typical position, using rigid body limit equilibrium method from the perspective of 2 d, in the full study south help shrink battery limit compound stope side slope and mine safety distance, flat width, and the direction of dump active line and the relationship between the stability design of multiple slope configuration scheme, through the various methods of slope stability, enforceability and comparing some important parameters such as displacement capacity, ultimately determine the technology feasible economic and reasonable boundary zone composite slope space form. Based on the above research results, FLAC3D software was used to study the stress-strain relationship inside the slope, revealing the deformation and failure mechanism and stability of the composite slope in the south bound area. The results show that the landslide mode and stability of the composite slope in the south bound area of pingshuoAndaobao open-pit coal mine are mainly controlled by the safe distance between stope and dump and the weak layer of 11 coal floor. According to the design, the economic and reasonable parameters of the composite slope in the south slope shrinkage boundary area are as follows: the safe distance between the stope end side and the dump site is 50m, the width of the dump flat plate is 60m, and the working line Angle of the dump line with the abandonment height of 255m is 125°, the total discard space was95,934,100 m3.


2014 ◽  
Author(s):  
José C. Mura ◽  
Waldir R. Paradella ◽  
Fabio F. Gama ◽  
Athos R. Santos ◽  
Mauricio Galo ◽  
...  

Author(s):  
Wenmin Hu ◽  
Lixin Wu

Recognition and extraction of mining ground deformation can help us understand the deformation process and space distribution, and estimate the deformation laws and trends. This study focuses on the application of ground deformation detection and extraction combining with high resolution visible stereo imagery, LiDAR observation point cloud data and historical data. The DEM in large mining area is generated using high-resolution satellite stereo images, and ground deformation is obtained through time series analysis combined with historical DEM data. Ground deformation caused by mining activities are detected and analyzed to explain the link between the regional ground deformation and local deformation. A district of covering 200&thinsp;km<sup>2</sup> around the West Open Pit Mine in Fushun of Liaoning province, a city located in the Northeast China is chosen as the test area for example. Regional and local ground deformation from 2010 to 2015 time series are detected and extracted with DEMs derived from ZY-3 images and LiDAR point DEMs in the case study. Results show that the mean regional deformation is 7.1&thinsp;m of rising elevation with RMS 9.6&thinsp;m. Deformation of rising elevation and deformation of declining elevation couple together in local area. The area of higher elevation variation is 16.3&thinsp;km<sup>2</sup> and the mean rising value is 35.8&thinsp;m with RMS 15.7&thinsp;m, while the deformation area of lower elevation variation is 6.8&thinsp;km<sup>2</sup> and the mean declining value is 17.6&thinsp;m with RMS 9.3&thinsp;m. Moreover, local large deformation and regional slow deformation couple together, the deformation in local mining activities has expanded to the surrounding area, a large ground fracture with declining elevation has been detected and extracted in the south of West Open Pit Mine, the mean declining elevation of which is 23.1&thinsp;m and covering about 2.3&thinsp;km<sup>2</sup> till 2015. The results in this paper are preliminary currently; we are making efforts to improve more precision results with invariant ground control data for validation.


2021 ◽  
Vol 13 (9) ◽  
pp. 1861
Author(s):  
Jihyun Moon ◽  
Hoonyol Lee

In this study, time-series of Sentinel-1A/B Interferometric Synthetic Aperture Radar (InSAR) coherence images were used to monitor the mining activity of Musan open-pit mine, the largest iron mine in North Korea. First, the subtraction of SRTM DEM (2000) from TanDEM-X DEM (2010–2015) has identified two major accumulation areas, one in the east (+112.33 m) and the other in the west (+84.03 m), and a major excavation area (−42.54 m) at the center of the mine. A total of 89 high-quality coherence images with a 12-day baseline from 2015 to 2020 were converted to the normalized difference activity index (NDAI), a newly developed activity indicator robust to spatial and temporal decorrelation. An RGB composite of annually averaged NDAI maps (red for 2019, green for 2018, and blue for 2017) showed that overall activity has diminished since 2018. Dumping slopes were categorized into shrinking, expanding, or transitional, according to the color pattern. Migration and expansion of excavation sites were also found on the pit floor. Time series of 12-day NDAI graphs revealed the date of activities with monthly accuracy. It is believed that NDAI with continuous acquisition of Sentinel-1A/B data can provide detailed monitoring of various types of activities in open-pit mines especially with limited in situ data.


Author(s):  
G. N. Shapovalenko ◽  
S. N. Radionov ◽  
V. V. Gorbunov ◽  
V. A. Khazhiev ◽  
V. Yu. Zalyadnov ◽  
...  

Chernogosky open pit mine integrates truck-and-shovel system of mining with overburden rehandling to internal dump with a set of walking excavators for rehandling of overburden to mined-out area of the pit. It is possible to improve efficiency of stripping in the conditions of Chernogorsky OPM by reducing percentage of stripping with more expensive handling system. The relevant research and solutions to this effect are presented in this article. Comparative characterization of mining conditions and parameters of mining systems applied is given for open pit mines Chernogorsky, Turnui, Nazarovsky, Vostochno-Beisky and Izykh. The comparative analysis points at the need to account for difficulty of mining and process sites in comparison of equipment productivity. High concentration of mining machines, which is conditioned by narrow mining front and simultaneous operation of five faces, as well as blasting operation implemented every 1-2 days, are recognized as the main constraints of excavator capacity in mining with direct dumping in Chernogorsky open pit mine. The management and engineering solutions implemented in the mine and resulted in higher efficiency of draglines are described.


Author(s):  
E. A. Vakulin ◽  
V. A. Ivashkevich ◽  
E. I.I. Gnitsak ◽  
V. S. Baikin ◽  
S. P. Maslyukov

Uniform schedule maintenance of mining and haulage machines is one of the key conditions for increasing productive time of maintenance personnel and decreasing monthly average servicing time. Currently, Russian mines infringe regulated maintenance schedule aimed to improve output per shift. The loss of time of maintenance personnel and equipment as a consequence maintenance irregularity is never assessed. This article presents assessment results on maintenance schedule uniformity in terms of dump trucks BelAZ-7513 and BelAZ-7530 at Chernogorsky open pit mine, SUEK-Khakassia. A variant of calculation of time loss owing to inconsistent maintenance schedule for dump trucks is proposed. The loss of time by maintenance personnel and by mining/haulage machines is assessed. The fleet of dump trucks BelAZ-7513 and BelAZ-7530 is analyzed depending on overtime of operation between maintenance periods. It is recommended to improve uniformity of maintenance schedule for mining and haulage equipment.