scholarly journals Infill drilling and well placement assessment for a multi-layered heterogeneous reservoir

Author(s):  
Fahad I. Syed ◽  
Shahin Negahban ◽  
Amirmasoud K. Dahaghi

AbstractThis paper presents an assessment of infill drilling opportunities in a complex multi-layered heterogeneous carbonate formation located in Abu Dhabi offshore. The subject field was developed last century and is currently undergoing further development with line drive horizontal wells. The field is being redeveloped for improved oil recovery at higher production rates with long horizontal wells. An infill assessment process is defined using sector model reservoir simulations for the specific reservoir. Reservoir simulations are performed on pattern sector models to establish the optimum grid for infill evaluation. Also, the models with an appropriate grid size are used to optimize infill placement (vertical and lateral well placement) and infill drilling timing for a couple of geologically similar areas. In the second step, the sector model results are applied to test the full-field infill development plan. The relatively homogeneous geological area shows very uniform displacement with 1-km spaced wells and gives no considerable benefit of incremental recovery through infill drilling. However, in a comparatively heterogeneous geological area, considerable incremental oil recovery is quantified. In brief, this paper presents a detailed infill drilling and well placement assessment process workflow for the re-development of a multi-layered heterogeneous reservoir.

2021 ◽  
Author(s):  
Hamid Pourpak ◽  
Samuel Taubert ◽  
Marios Theodorakopoulos ◽  
Arnaud Lefebvre-Prudencio ◽  
Chay Pointer ◽  
...  

Abstract The Diyab play is an emerging unconventional play in the Middle East. Up to date, reservoir characterization assessments have proved adequate productivity of the play in the United Arab Emirates (UAE). In this paper, an advanced simulation and modeling workflow is presented, which was applied on selected wells located on an appraisal area, by integrating geological, geomechanical, and hydraulic fracturing data. Results will be used to optimize future well landing points, well spacing and completion designs, allowing to enhance the Stimulated Rock Volume (SRV) and its consequent production. A 3D static model was built, by propagating across the appraisal area, all subsurface static properties from core-calibrated petrophysical and geomechanical logs which originate from vertical pilot wells. In addition, a Discrete Fracture Network (DFN) derived from numerous image logs was imported in the model. Afterwards, completion data from one multi-stage hydraulically fracked horizontal well was integrated into the sector model. Simulations of hydraulic fracturing were performed and the sector model was calibrated to the real hydraulic fracturing data. Different scenarios for the fracture height were tested considering uncertainties related to the fracture barriers. This has allowed for a better understanding of the fracture propagation and SRV creation in the reservoir at the main target. In the last step, production resulting from the SRV was simulated and calibrated to the field data. In the end, the calibrated parameters were applied to the newly drilled nearby horizontal wells in the same area, while they were hydraulically fractured with different completion designs and the simulated SRVs of the new wells were then compared with the one calculated on the previous well. Applying a fully-integrated geology, geomechanics, completion and production workflow has helped us to understand the impact of geology, natural fractures, rock mechanical properties and stress regimes in the SRV geometry for the unconventional Diyab play. This work also highlights the importance of data acquisition, reservoir characterization and of SRV simulation calibration processes. This fully integrated workflow will allow for an optimized completion strategy, well landing and spacing for the future horizontal wells. A fully multi-disciplinary simulation workflow was applied to the Diyab unconventional play in onshore UAE. This workflow illustrated the most important parameters impacting the SRV creation and production in the Diyab formation for he studied area. Multiple simulation scenarios and calibration runs showed how sensitive the SRV can be to different parameters and how well placement and fracture jobs can be possibly improved to enhance the SRV creation and ultimately the production performance.


Author(s):  
Oluwasanmi Olabode ◽  
Sunday Isehunwa ◽  
Oyinkepreye Orodu ◽  
Daniel Ake

AbstractThin oil rim reservoirs are predominantly those with pay thickness of less than 100 ft. Oil production challenges arise due to the nature of the gas cap and aquifer in such reservoirs and well placement with respect to the fluid contacts. Case studies of oil rim reservoir and operational properties from the Niger-Delta region are used to build classic synthetic oil rim models with different reservoir parameters using a design of experiment. The black oil simulation model of the ECLIPSE software is activated with additional reservoir properties and subsequently initialized to estimate initial oil and gas in place. To optimize hydrocarbon production, 2 horizontal wells are initiated, each to concurrently produce oil and gas. Well placements of (0.5 ft., 0.25 ft. and 0.75 ft.) are made with respect to the pay thickness and then to the fluid contacts. The results show that for oil rim with bigger aquifers, an oil recovery of 8.3% is expected when horizontal wells are placed at 0.75 ft. of the pay thickness away from the gas oil contact, 8.1% oil recovery in oil rims with larger gas caps with completions at 0.75 ft. of the pay zone from the gas oil contacts, 6% oil recovery with relatively small gas caps and aquifer and 9.3% from oil rims with large gas caps and aquifers, with completions at mid-stream of the pay zone.


2003 ◽  
Vol 20 (1) ◽  
pp. 557-561 ◽  
Author(s):  
A. Carter ◽  
J. Heale

AbstractThis paper updates the earlier account of the Forties Field detailed in Geological Society Memoir 14 (Wills 1991), and gives a brief description of the Brimmond Field, a small Eocene accumulation overlying Forties (Fig. 1).The Forties Field is located 180 km ENE of Aberdeen. It was discovered in 1970 by well 21/10-1 which encountered 119 m of oil bearing Paleocene sands at a depth of 2131 m sub-sea. A five well appraisal programme confirmed the presence of a major discovery including an extension into Block 22/6 to the southeast. Oil-in-place was estimated to be 4600 MMSTB with recoverable reserves of 1800 MM STB. The field was brought onto production in September 1975. Plateau production of 500 MBOD was reached in 1978, declining from 1981 to 77 MBOD in 1999.In September 1992 a programme of infill drilling commenced, which continues today. The earlier infill targets were identified using 3D seismic acquired in 1988. Acquisition of a further 3D survey in 1996 has allowed the infill drilling programme to continue with new seismic imaging of lithology, fluids and saturation changes. The performance of the 1997 drilling showed that high step-out and new technology wells, including multi-lateral and horizontal wells, did not deliver significantly better targets than drilling in previous years.In line with smaller targets, and in the current oil price environment, low cost technology is being developed through the 1999 drilling programme. Through Tubing Rotary Drilling (TTRD) is currently seen as the most promising way of achieving a step


2021 ◽  
Author(s):  
Usman Ahmed ◽  
Zhiheng Zhang ◽  
Ruben Ortega Alfonzo

Abstract Horizontal well completions are often equipped with Inflow Control Devices (ICDs) to optimize flow rates across the completion for the whole length of the interval and to increase the oil recovery. The ICD technology has become useful method of optimizing production from horizontal wells in a wide range of applications. It has proved to be beneficial in horizontal water injectors and steam assisted gravity drainage wells. Traditionally the challenges related to early gas or water breakthrough were dealt with complex and costly workover/intervention operations. ICD manipulation used to be done with down-hole tractor conveyed using an electric line (e-line) cable or by utilization of a conventional coiled tubing (CT) string. Wellbore profile, high doglegs, tubular ID, drag and buoyancy forces added limitations to the e-line interventions even with the use of tractor. Utilization of conventional CT string supplement the uncertainties during shifting operations by not having the assurance of accurate depth and forces applied downhole. A field in Saudi Arabia is completed with open-hole packer with ICD completion system. The excessive production from the wells resulted in increase of water cut, hence ICD's shifting was required. As operations become more complex due to fact that there was no mean to assure that ICD is shifted as needed, it was imperative to find ways to maximize both assurance and quality performance. In this particular case, several ICD manipulating jobs were conducted in the horizontal wells. A 2-7/8-in intelligent coiled tubing (ICT) system was used to optimize the well intervention performance by providing downhole real-time feedback. The indication for the correct ICD shifting was confirmed by Casing Collar Locator (CCL) and Tension & Compression signatures. This paper will present the ICT system consists of a customized bottom-hole assembly (BHA) that transmits Tension, compression, differential pressure, temperature and casing collar locator data instantaneously to the surface via a nonintrusive tube wire installed inside the coiled tubing. The main advantages of the ICT system in this operation were: monitoring the downhole force on the shifting tool while performing ICD manipulation, differential pressure, and accurately determining depth from the casing collar locator. Based on the known estimated optimum working ranges for ICD shifting and having access to real-time downhole data, the operator could decide that required force was transmitted to BHA. This bring about saving job time while finding sleeves, efficient open and close of ICD via applying required Weight on Bit (WOB) and even providing a mean to identify ICD that had debris accumulation. The experience acquired using this method in the successful operation in Saudi Arabia yielded recommendations for future similar operations.


Sign in / Sign up

Export Citation Format

Share Document