scholarly journals Improving comfort conditions as an energy upgrade tool for housing stock: Analysis of a house prototype

2022 ◽  
Vol 66 ◽  
pp. 209-221
Author(s):  
Alicia Alonso ◽  
Carmen María Calama-González ◽  
Rafael Suárez ◽  
Ángel Luis León-Rodríguez ◽  
Miguel Hernández-Valencia
Keyword(s):  
Author(s):  
Luke Bo'sher ◽  
Sewin Chan ◽  
Ingrid Gould Ellen ◽  
Brian Karfunkel ◽  
Hsi-ling Liao

The success of the Program of housing stock renovation in Moscow depends on the efficiency of resource management. One of the main urban planning documents that determine the nature of the reorganization of residential areas included in the Program of renovation is the territory planning project. The implementation of the planning project is a complex process that has a time point of its beginning and end, and also includes a set of interdependent parallel-sequential activities. From an organizational point of view, it is convenient to use network planning and management methods for project implementation. These methods are based on the construction of network models, including its varieties – a Gantt chart. A special application has been developed to simulate the implementation of planning projects. The article describes the basic principles and elements of modeling. The list of the main implementation parameters of the Program of renovation obtained with the help of the developed software for modeling is presented. The variants of using the results obtained for a comprehensive analysis of the implementation of large-scale urban projects are proposed.


2020 ◽  
Vol 65 (1) ◽  
pp. 17-26
Author(s):  
Gergely Olt ◽  
Adrienne Csizmady

AbstractThe growth of the tourism and hospitality industry played an important role in the gentrification of the post-socialist city of Budapest. Although disinvestment was present, reinvestment was moderate for decades after 1989. Privatisation of individual tenancies and the consequent fragmented ownership structure of heritage buildings made refurbishment and reinvestment less profitable. Because of local contextual factors and global changes in consumption habits, the function of the dilapidated 19th century housing stock transformed in the 2000s, and the residential neighbourhood which was the subject of the research turned into the so called ‘party district’. The process was followed in our ongoing field research. The functional change made possible speculative investment in inner city housing and played a major role in the commodification of the disinvested housing stock.


Author(s):  
Vladimir A. Lapin ◽  
Erken S. Aldakhov ◽  
S. D. Aldakhov ◽  
A. B. Ali

For the first time in Almaty full passport of apartment stock of multiapartment building was carried out. The structure of the housing stock was revealed with the allocation of groups of buildings according to structural solutions and assessment of their seismic resistance. Based on the results of certification, quantitative estimates of failure probability values for different types of buildings were obtained. Formulas for estimation of quantitative value of seismic risk are obtained. The number of deaths in the estimated zem-shakes was estimated. The results of the assessments will be used for practical recommendations to reduce risk and expected losses in possible earthquakes.


1990 ◽  
Vol 22 (3-4) ◽  
pp. 291-298
Author(s):  
Frits A. Fastenau ◽  
Jaap H. J. M. van der Graaf ◽  
Gerard Martijnse

More than 95 % of the total housing stock in the Netherlands is connected to central sewerage systems and in most cases the wastewater is treated biologically. As connection to central sewerage systems has reached its economic limits, interest in on-site treatment of the domestic wastewater of the remaining premises is increasing. A large scale research programme into on-site wastewater treatment up to population equivalents of 200 persons has therefore been initiated by the Dutch Ministry of Housing, Physical Planning and Environment. Intensive field-research work did establish that the technological features of most on-site biological treatment systems were satisfactory. A large scale implementation of these systems is however obstructed in different extents by problems of an organisational, financial and/or juridical nature and management difficulties. At present research is carried out to identify these bottlenecks and to analyse possible solutions. Some preliminary results are given which involve the following ‘bottlenecks':-legislation: absence of co-ordination and absence of a definition of ‘surface water';-absence of subsidies;-ownership: divisions in task-setting of Municipalities and Waterboards; divisions involved with cost-sharing;-inspection; operational control and maintenance; organisation of management;-discharge permits;-pollution levy;-sludge disposal. Final decisions and practical elaboration of policies towards on-site treatment will have to be formulated in a broad discussion with all the authorities and interest groups involved.


2017 ◽  
Author(s):  
Eric Wilson ◽  
Craig Christensen ◽  
Scott Horowitz ◽  
Joseph Robertson ◽  
Jeff Maguire

Sign in / Sign up

Export Citation Format

Share Document