Combined effect of tetracycline and copper ion on catalase activity of microorganisms during the biological phosphorus removal

2022 ◽  
Vol 304 ◽  
pp. 114218
Author(s):  
Yacan Man ◽  
Hua Zhang ◽  
Jian Huang ◽  
Shanshan Xi ◽  
Jinhua Wang ◽  
...  
2006 ◽  
Vol 41 (1) ◽  
pp. 72-83 ◽  
Author(s):  
Zhe Zhang ◽  
Eric R. Hall

Abstract Parameter estimation and wastewater characterization are crucial for modelling of the membrane enhanced biological phosphorus removal (MEBPR) process. Prior to determining the values of a subset of kinetic and stoichiometric parameters used in ASM No. 2 (ASM2), the carbon, nitrogen and phosphorus fractions of influent wastewater at the University of British Columbia (UBC) pilot plant were characterized. It was found that the UBC wastewater contained fractions of volatile acids (SA), readily fermentable biodegradable COD (SF) and slowly biodegradable COD (XS) that fell within the ASM2 default value ranges. The contents of soluble inert COD (SI) and particulate inert COD (XI) were somewhat higher than ASM2 default values. Mixed liquor samples from pilot-scale MEBPR and conventional enhanced biological phosphorus removal (CEBPR) processes operated under parallel conditions, were then analyzed experimentally to assess the impact of operation in a membrane-assisted mode on the growth yield (YH), decay coefficient (bH) and maximum specific growth rate of heterotrophic biomass (µH). The resulting values for YH, bH and µH were slightly lower for the MEBPR train than for the CEBPR train, but the differences were not statistically significant. It is suggested that MEBPR simulation using ASM2 could be accomplished satisfactorily using parameter values determined for a conventional biological phosphorus removal process, if MEBPR parameter values are not available.


1990 ◽  
Vol 22 (7-8) ◽  
pp. 35-43
Author(s):  
K. D. Tracy ◽  
S. N. Hong

The anaerobic selector of the A/0™ process offers many advantages over conventional activated sludge processes with respect to process performance and operational stability. This high-rate, single-sludge process has been successfully demonstrated in full-scale operations for biological phosphorus removal and total nitrogen control in addition to BOD and TSS removal. This process can be easily utilized in upgrading existing treatment plants to meet stringent discharge limitations and to provide capacity expansion. Upgrades of two full-scale installations are described and performance data from the two facilities are presented.


1985 ◽  
Vol 17 (11-12) ◽  
pp. 297-298 ◽  
Author(s):  
Takao Murakami ◽  
Atsushi Miyairi ◽  
Kazuhiro Tanaka

In Japan various biological phosphorus removal processes have recently been researched by laboratory or pilot plant scale studies and most of them have shown good results. Based on these results, the Japan Sewage Works Agency has conducted a full scale study of the biological phosphorus removal process from June 1982 until February 1983, which was the first full scale operation of this process in Japan. The main purpose of the study was to evaluate phosphorus removal efficiency and also nitrogen removal efficiency of the process and in addition, to ascertain the important operating factors of the process. For the study a treatment train of a large scale sewage treatment plant was remodelled. The aeration tank of 3.825 m3 volume was divided into four equal cells. The whole train including return sludge line was operated entirely independently of the other trains. During the experiment the train was operated under two different modes, Mode 1 and Mode 2. In Mode 1, the train was operated as an A/O process, the first cell of the aeration tank being anaerobic and the other cells oxic. In Mode 2, the train was operated as a Modified Phoredox process. In this case, the first cell was anaerobic, but the second cell was anoxic and nitrified liquor was returned to it from the end of the oxic cells. Mode 1 and Mode 2 were further divided into many ‘runs' and the flow rate varied between 12,550 m3 d−1 and 25,270 m3 d−1 , corresponding to retention times of 7.3 hours and 3.6 hours, respectively. Throughout the experimental period the mean value of influent (primary effluent) total-P concentration was 3.38 mg 1−1 , and that of the final effluent was 0.47 mg 1−1 . A cumulated frequency curve of the data showed that about 93% of measured effluent total-P was below 1.0 mg l−1 . Therefore, it can be concluded that with these influent total-P levels, biological phosphorus removal processes can sufficiently satisfy the effluent standard of 1 mg 1−1 total-P. Even when the process was operated as a Modified Phoredox Process, no obstruction to phosphorus removal because of nitrification was observed and phosphorus removal remained good. However, since the sewage treatment plant treated influent from a combined sewerage system, phosphorus removal was sometimes affected by heavy rainfalls. In such cases phosphorus release in the anaerobic cell was insufficient because of increased influent NOx concentration and accordingly increased denitrification level in the anaerobic cell. Therefore, as a result, enhanced phosphorus uptake in the following cells could not be observed. Higher process stability can be expected if an effective countermeasure to high influent NOx concentration can be made. Influence of flow rate fluctuation on the process was also studied. The treatment train was operated for a week under a daily flow rate fluctuation pattern which ranged between 460 m3 hr−1 and 820 m3 hr−1 . Nevertheless, the effluent total-P concentration showed no increase and stayed constantly lower than 0.5 mg 1−1. The oxidation reduction potential (ORP) was an effective control index to evaluate the degree of phosphorus release in the anaerobic cell. Water temperature did not affect phosphorus release and uptake rates.


1991 ◽  
Vol 24 (7) ◽  
pp. 133-148 ◽  
Author(s):  
A. Peter ◽  
F. Sarfert

In investigations concerning sludge bulking in Berlin enhanced biological phosphorus removal was first observed unexpectedly. Because since 1986 an officially preset limit of 2 mg TP/l must be kept in all Berlin wastewater discharges it was decided to explore the capabilities of the observed mechanism under the specific circumstances of the exciting two large treatment plants in Ruhleben (240,000 m3/d) and Marienfelde (100,000 m3/d). For this purpose some of the existing units at both plants were equipped with anaerobic zones which were generated mainly by process modifications. Additionally stage one of the Ruhleben plant was altered completely in order to investigate the combination of biological phosphorus and nitrogen removal as a special pilot study in three parallel trains. The research activities and treatment results gained in each of the two stages of the Ruhleben and in the Marienfelde plant are reported in detail. For example BOD-related phosphorus removal rates were obtained ranging from 2.3-4.5 mg TP per 100 mg BOD removed. It must be stressed that all examinations were performed on full-scale conditions. At present the given limit of 2 mg TP/l in the Ruhleben plant is met without any chemical precipitation at least on average. From the beginning biological phosphorus removal will be integrated into further projected extensions.


1994 ◽  
Vol 29 (7) ◽  
pp. 153-156 ◽  
Author(s):  
D. Wedi ◽  
P. A. Wilderer

Most of the fundamental processes responsible for enhanced biological phosphorus removal (EBPR) were obtained through laboratory tests under defined conditions with pure or enriched cultures. Acinetobacter sp. was identified as the most important group of bacteria responsible for bio-P removal. Full scale data showed, however, that laboratory results do not match full scale results well enough. There is a lack of data on the effects of sub-optimal process conditions such as inadequate availability of volatile fatty acids (VFA), high nitrate recycle, storm water inflow or low temperatures. In this paper the results of full scale experiments on P-release are presented and compared with theoretical values. Measurements at a full scale Phoredox-system showed a surprisingly low P-release in the anaerobic reactor. Only 4 to 10% of the phosphorus in the activated sludge was released in the bulk liquid. With laboratory batch-tests, a maximum of 20% of the P in the sludge could be released. It is assumed that under the prevailing process conditions either the fraction of Acinetobacter sp. was very small, or bacteria other than Acinetobacter sp. were responsible for the P-removal, or most of the phosphorus was bound chemically but mediated by biological processes.


1998 ◽  
Vol 37 (4-5) ◽  
pp. 609-613
Author(s):  
J. Pramanik ◽  
P. L. Trelstad ◽  
J. D. Keasling

Enhanced biological phosphorus removal (EBPR) in wastewater treatment involves metabolic cycling through the biopolymers polyphosphate (polyP), polyhydroxybutyrate (PHB), and glycogen. This cycling is induced through treatment systems that alternate between carbon-rich anaerobic and carbon-poor aerobic reactor basins. While the appearance and disappearance of these biopolymers has been documented, the intracellular pressures that regulate their synthesis and degradation are not well understood. Current models of the EBPR process have examined a limited number of metabolic pathways that are frequently lumped into an even smaller number of “reactions.” This work, on the other hand, uses a stoichiometric model that contains a complete set of the pathways involved in bacterial biomass synthesis and energy production to examine EBPR metabolism. Using the stoichiometric model we were able to analyze the role of EBPR metabolism within the larger context of total cellular metabolism, as well as predict the flux distribution of carbon and energy fluxes throughout the total reaction network. The model was able to predict the consumption of PHB, the degradation of polyP, the uptake of acetate and the release of Pi. It demonstrated the relationship between acetate uptake and Pi release, and the effect of pH on this relationship. The model also allowed analysis of growth metabolism with respect to EBPR.


2000 ◽  
Vol 41 (4-5) ◽  
pp. 503-508 ◽  
Author(s):  
R.F. Gonçalves ◽  
F. Rogalla

This work describes laboratory scale research about Enhanced Biological Phosphorus Removal (EBPR) in a submerged biofilter under Anaerobic/Oxic (A/O) alternation and continuous feed. Its main purpose is to detail the behaviour of the reactor throughout the anaerobic and the aerobic phases of the A/O cycle, to study the importance of the anaerobic phase in the selection of the EBPR bacteria in the biofilm and to evaluate the consumption and the importance of the organic substrate during the anaerobic phase. The mass balance over the Phosphorus (P) element indicates that long anaerobic phases (6 h) are more efficient than short ones (3 h) as a selector of EBPR bacteria in biofilms. In both comparisons, thespecific mass of P released in a 6 h period represents almost 50% more than the amount of P release in the shorter period (3 h). However, the presence of rapidly biodegradable COD in the influent of the anaerobic phase is a more effective selector, more important than the duration of the anaerobic phase: by doubling the amount of acetic acid in the influent, a similar 50% increase of P-release can be achieved at short anaerobic periods of 3 h. The effect of the strategy adopted in this study, focusing on selecting EBPR bacteria in biofilm, is shown by the P levels of 4% (total P/SST) in the sludge removed from the BF by backwashing in all periods.


2015 ◽  
Vol 2015 (10) ◽  
pp. 3527-3541
Author(s):  
Alyssa Mayer ◽  
Dan Miklos ◽  
Joe Rohrbacher ◽  
Katya Bilyk ◽  
Sarah Galst

Sign in / Sign up

Export Citation Format

Share Document