scholarly journals Research on displacement prediction of shield tunneling through existing tunnel based on LSSVM

2021 ◽  
Vol 237 ◽  
pp. 03034
Author(s):  
Xianguo Wu ◽  
Tiemei Zeng ◽  
Yanyan Tao ◽  
Hongyu Chen

The construction scale of the shield tunnel underpass is expanding day by day. In order to study the safety influence and deformation control of the shield tunnel underpass on the existing tunnel, the LSSVM model is established. Based on the collected soil storage pressure, foam volume, simultaneous grouting volume and other six shield construction parameters and corresponding sample data of the tunnel bottom displacement, the horizontal displacement and settlement displacement of the existing tunnel bottom caused by the approach construction are predicted. Taking a subway project as an example, the research results show that the prediction model of shield tunneling under the existing tunnel bottom level and settlement displacement has strong generalization ability and rapid and accurate prediction effect. This method can provide reference for similar projects.

2015 ◽  
Vol 777 ◽  
pp. 3-7
Author(s):  
Pei Sheng Xi ◽  
Xiao Zhao ◽  
Zhen Li

Shield tunneling have varying degrees of impact on the surrounding buildings and the surrounding environment. Based on the shield tunneling of Hefei Subway Line 1 Ma'anshan viaduct, a 3D Fast Lagrangian Analysis of Continua is be used to simulate the shield tunnel construction and analyze the ground settlement and bridge pile deformation caused by tunnel construction. The numerical modeling results by analyzing the displacement variation and soil affected area at different distances show that when the shield tunnel excavation, the ground settlement becomes smaller with increasing distance from the shield center line of the pile and the maximum ground settlement is 10.778mm. The main deformation of bridge pile is in horizontal direction with a maximum horizontal direction of 2.0758mm. Horizontal displacement changes lager at the top of the pile, along with changes in the horizontal displacement of the pile depth becomes smaller, 15m is a turning point.


2011 ◽  
Vol 243-249 ◽  
pp. 3370-3375 ◽  
Author(s):  
Gang Wei ◽  
Jie Hong ◽  
Zhao Lin ◽  
Xin Jiang Wei

Due to its better advantages, Double-O-Tube(DOT) shield has been widely applied in shield tunnel construction. But the impact caused by shield tunnel construction on buildings hasn’t been taken seriously. Considering the interaction of building-soil-tunnel, the independent foundation frame building vertical crossed by DOT shield tunnel was simulated by 3D MIDAS/GTS software, and the impact of construction on the building was analyzed. The results show that: during the passage of the shield tunneling through the building, the settlement of the building increased. The settlement was stable and had a little rebound when shield machine already passed the building. The building’s longitudinal displacement was great larger than lateral horizontal displacement. With the increase of driving distance, the first principal stress P1 and maximum shear strain MSmax increased and then were stable. With the increase of L, the first principal stress P1 and maximum shear strain MSmax tended to gradually reduce the security value, and the maximum differential settlement between columns increased first and then decreased. Finally, the safety of the building was assessed comprehensively.


2011 ◽  
Vol 368-373 ◽  
pp. 2711-2715 ◽  
Author(s):  
De Yun Ding ◽  
Xiu Ren Yang ◽  
Wei Dong Lu ◽  
Wei Ning Liu ◽  
Mei Yan ◽  
...  

In more and more complicated urban building environment, a new construction method that metro engineering is constructed by large-diameter shield and shallow mining method can be regarded as a great attempt in China. By taking the Gaojiayuan station of Beijing metro line 14 as an engineering background, the main construction steps for the platform of the metro station built by a large-size shield with an outer diameter of 10 m and the Pile-Beam-Arch (PBA) method are introduced. Based on the soil-structure interaction theory, a two-dimensional finite element model is used to simulate the shield tunneling and the platform construction by the PBA method to enlarge the shield tunnel. The ground deformation and structural stress of the platform are predicted. The numerical results can be regarded as a valuable reference for the application of the new construction method in Beijing metro line 14.


2011 ◽  
Vol 71-78 ◽  
pp. 32-36 ◽  
Author(s):  
Xin Jiang Wei ◽  
Jie Hong ◽  
Gang Wei

Considering the interaction of building-soil-tunnel, the grillage beams foundation frame building vertical crossed by Double-O-Tube (DOT) shield tunnel was simulated by 3D MIDAS/ GTS software, and the impact of construction on the building was analyzed. The results show that: the ground settlement trough caused by DOT shield tunnel can be fitted by peck formula; during the passage of the shield tunneling through the building, the settlement of the building increased and settlement trough was wilder; the settlement was stable and had a little rebound when shield machine already passed the building; with the increase of driving distance, the first principal stress P1 increased and then was stable; with the increase of L, the shape of foundation settlement curve changed, and the maximum differential settlement between columns increased but was small.


2014 ◽  
Vol 915-916 ◽  
pp. 108-113
Author(s):  
Wei Kai Zong

Shield construction will cause surface subsidence, and the presence of underground structures above the tunnel has an impact on surface subsidence. Based on this, with the engineering of undercross shield tunnel construction on railway station as background, used numerical simulation method to analyze the effect of surface subsidence of underground passage, and studied the influence of depth and width of underpasses on ground movement induced. The results show that: The impact of the underground passage to the wire surface subsidence caused by the shield cannot be ignored. Surface subsidence caused by double shield will be decreased because of the existence of the underground passage, and that related to the channel depth and width. The greater the depth of underground channel, the greater the surface subsidence; greater the underground channel width, the smaller surface subsidence. Meanwhile, the surface subsidence trough width and the largest settlement scope unrelated to the depth of underground tunnels but the underground channel width, and increases with the increasing of the underpass width.


2014 ◽  
Vol 580-583 ◽  
pp. 1013-1018 ◽  
Author(s):  
Hui Feng Su ◽  
Wei Ning Liu ◽  
Fu Chun Liu

Confronting with the difficulties of the construction metro station in the Northeast of China, a new idea of shield method combined prefabricated method is put forward. In the paper the research status of the underground engineering precast assembly technology was analyzed and classified firstly. The method of single round interval shield combined with open-cut (or covered excavation) prefabricated sections and on the basis of shield tunnel to build single arch station is especially worth studying and promotion. Then the key prefabricate theory needing to deal with such as how to calculating the spring stiffness and so forth of the calculating model. The key technology such as joint formation, waterproof and the other of shield method combined with prefabricated method was discussed.


2013 ◽  
Vol 734-737 ◽  
pp. 502-506
Author(s):  
Meng Lin Xu ◽  
De Shen Zhao

The shield tunneling will be bound to disturb surrounding strata, induced stress redistribution in soil, soil deformation and surface subsidence. We analyzed characteristics of soil disturbance by shield tunneling with numerical simulation. To provide technical support for the future urban shield tunnel construction. It shows practically significant in studying shield tunnel construction.


2011 ◽  
Vol 299-300 ◽  
pp. 110-113
Author(s):  
Hai Xia Sun ◽  
Hai Yu Wu ◽  
Si Li Chen

Against the background of shenyang subway shield tunnel construction, the method of numerical simulation methods are used to analyze the factors of surface subsidence caused by shield construction comprehensively, and the universal finite element program ABAQUS is used to establish mechanical model depended on comprehensive consideration the influence factors of soil warehouses pressure, seepage and groundwater. A dynamic finite element simulation of shield advance process and conclude the surface deformation rule of soil are studied.


Sign in / Sign up

Export Citation Format

Share Document