scholarly journals Causes of construction delay from contractors and suppliers in Thailand's oil and gas platform projects

2018 ◽  
Vol 192 ◽  
pp. 02008
Author(s):  
Pittayaporn Gomarn ◽  
Jakrapong Pongpeng

Construction project delays caused by contractors and suppliers are the top problems in Thailand's oil and gas industries. Recognizing this importance and their relationships between factors can help reduce the risk of delays in construction projects. Therefore, this study set out to confirm factors and inspect relationships between delay factors of contractors and suppliers. A 16 item questionnaire survey was distributed to 134 managers, engineers, and supervisors in oil and gas platform construction projects in Thailand. A confirmatory factor analysis (CFA) was performed by the use of Amos Version 20 software program. The analysis results showed that delays caused by the contractors and suppliers had high relationships, due to high regression weighs. The delays caused by the contractors included seven factors which included poor site management and supervision (17%), lack of safety rules and regulations (16%), poor communication and coordination with others (15%), poor procurement system management (15%), defective components and mistakes during construction (14%), supplier payments lateness (13%), and poor planning and scheduling (10%). The delays caused by the suppliers included six factors which included the supply of unqualified and unskilled personnel (22%), supply of low efficiency equipment (20%), late delivery of materials and equipment (20%), supply of low quality materials (16%), late supply of workers (16%), and price escalation (5%).

This research investigates the factors, which cause delay in construction projects in Afghanistan. Delay is one of the major challenges during the implementation of the construction projects, and it is the late completion of the activities or works of a project compared to the planned. A large number of construction projects in Afghanistan are facing delay during the implementation. Project delay negatively affects the prestige and dignity of the government organizations and in general, failures and weaknesses of the projects created distance between the people and the government and shows incapacity of the Government in the implementation of the projects all around the country in Afghanistan. Several similar studies from developing countries have been reviewed and a survey has been conducted for data collection from the different public organizations of Afghanistan. The analysis of the collected data points out the significant causes of delay in construction project in Afghanistan as; ineffective planning and scheduling of a project by contractor, delay in progress payments by client, poor site management and supervision of contractors by consultant and client, financial difficulties by contractor, insufficient controlling and monitoring by consultant and client, non-availability of experienced technical staff of contractor, late in reviewing and approving design documents by client, lack of communication and coordination between the parties, delay in delivery of materials to site, inadequate contractor experience, political influences and warlords intervention. Finally, this thesis provides applicable recommendations to minimize or eliminate the causes of delay in construction projects in Afghanistan.


2018 ◽  
Vol 8 (5) ◽  
pp. 3369-3372 ◽  
Author(s):  
M. A. Akhund ◽  
H. U. Imad ◽  
N. A. Memon ◽  
F. Siddiqui ◽  
A. R. Khoso ◽  
...  

Time overrun is a major issue in construction projects. Its causes vary, depending upon the nature and size of the project. Developing countries are more susceptible to this problem due to limited resources and lack of managerial skills. This paper focuses on the identification and classification of time overrun factors in public sector projects in Pakistan. Data was collected by the use of a questionnaire given to different professionals in the construction field. Average index (AI) was used to determine each factor’s relative importance. Results indicate that financial difficulties faced by constructor, inadequate planning and scheduling, financial difficulties faced by client, delays in payment by the client, delays in decision making by the client, design mistakes, frequent design changes, material shortage, incompetent sub-constructor assigned by the constructor, poor site management and supervision and inadequate constructor’s experience are the most significant factors of time overrun in public sector construction projects in Pakistan. This study aims to be useful in addressing the issue of time overrun in the construction industry.


2020 ◽  
Vol 10 (3) ◽  
pp. 179-186
Author(s):  
Abdullahi Ahmed Umar ◽  
Rashid Khalfan Al Rizeiqi ◽  
Atef Badr

AbstractDelays on construction projects constitute a major source of concern due to its associated cost increases and loss of revenue. The Gulf Cooperation Council (GCC), of which Oman is a member, faces huge delays on their projects. Such delays in the GCC were among factors fingered in the collapse of the UK’s Carillion. Despite cultural similarities, substantial variability exists within the GCC construction sector which requires country-specific studies. The quest to understand delay causes results from the need to curtail wastes and adjust to the new regime of low commodity prices. There is a dearth of studies specific to the governorate of Muscat exploring the causes of delays and this study seeks to fill that gap. A structured survey questionnaire was administered at two independent events organized by the RICS and ICE in Muscat. The top causes of delays ranked using the Relative Importance Index (RII) include variation and changes in design, Poor site management and supervision, ineffective planning and scheduling, unclear and inadequate details in drawing, poor qualification of the contractors and technical staff, delay in material delivery, and shortage of labor. Contractors were found to be most likely to cause delays among the 6 categories of sources.


Author(s):  
Abdullah Alhajri ◽  
Adel Alshaibani

This paper presents a study conducted to identify, assess, rank, and compare the most influencing factors causing schedule delay during construction phase of petrochemical projects in Saudi Arabia. The methodology followed in this research to achieve the main aims is a combination of comprehensive review of the literature and interviewing number of local experts, which have resulted in identifying of 23 factors. Through a web-based questionnaire survey, the identified factors were ranked. Total of 90 completed responses were gathered from 106 received responses. The completed responses gathered from 38 contractors and 52 owners. Of 90 participants, there are 32 project managers, 22 project engineers, 7 construction supervisors and the other 31 having different positions in projects departments The study has found that the most influencing factors causing schedule delay during construction in petrochemical projects in Saudi Arabia are “Poor site management and supervision by contractors”; “Conflict between main contractor and subcontractor”; “poor planning and scheduling of projects by contractor”; “Delay of material or equipment delivery”; and followed by “Delay in Handing Over Construction Site to Contractor”. This paper is original in the sense that the areas of knowledge and practice covered in the identified factors were distributed and not available in one source. The factors are derived from personal interviews with selected project managers, project engineers, construction supervisors and the others from different positions in project department and from the relevant literature.


Buildings ◽  
2019 ◽  
Vol 9 (2) ◽  
pp. 41 ◽  
Author(s):  
Abdulaziz Bin Seddeeq ◽  
Sadi Assaf ◽  
Abdullatif Abdallah ◽  
Mohammad A. Hassanain

Many construction projects exceed time and budget. The Saudi Arabian construction projects are not an exception to this phenomenon. However, the causes of time and cost overrun of Saudi Arabian oil and gas construction projects have never been studied. Thus, this paper endeavors to investigate the main causes of time and cost overrun in Saudi Arabian oil and gas construction projects. Thirty-eight causes of time and cost overrun were identified through the literature and an interview. Responses from 48 professionals based in the Eastern Province of Saudi Arabia were obtained. The respondents were solicited to evaluate the significance of the causes, which were then ranked and a test of agreement was conducted. All survey participants agreed that the five major causes of time and cost overrun, combined, were found to be “changing of design and scope by client during construction”, “poor planning and scheduling of project”, “design errors”, “Inadequate comprehension of scope of work at the bidding stage”, and “underestimating of cost and schedules/overestimating of benefits”. On the other hand, the major cause of time overrun was found to be “changing of design and scope by client during construction”. Finally, the major cause of cost overrun was found to be “underestimating of cost and schedules/overestimating of benefits”, respectively. The findings of this study will be beneficial to project stakeholders who must operate in an industry that is highly sensitive. The findings will also facilitate organizations planning to conduct construction projects in the Saudi Arabian oil and gas industry.


2019 ◽  
Vol 13 (1) ◽  
pp. 20-46 ◽  
Author(s):  
Serdar Durdyev ◽  
M. Reza Hosseini

Purpose The purpose of this paper is to present a systematic review of studies on CPD published between 1985 and 2018. Design/methodology/approach Before identifying common CPD, research trends were examined in terms of the number of publications in selected journals, as well as the contributions made by countries, institutions and researchers. Findings The findings reveal that researchers from developing countries have contributed the most to identifying the causes of CPD. A total of 149 causes of CPD were identified in a thorough review of 97 selected studies. Weather/climate conditions, poor communication, lack of coordination and conflicts between stakeholders, ineffective or improper planning, material shortages, financial problems, payment delays, equipment/plant shortage, lack of experience/qualification/competence among project stakeholders, labour shortages and poor site management were identified as the ten most common CPDs. Originality/value Being the first study of its type, this study provides insight into the research output related to this area and identifies a common set of CPDs, which may provide a better understanding of the key areas requiring attention where steps should be taken to minimise or control factors causing delays in construction projects.


Author(s):  
Aderemi Adeyemi ◽  
Olefile Segwabe

Claims are considered to be one of the most serious disruptive forces to successful project delivery in the construction industry. In a small developing economy like Botswana, it is germane to identify the sources and the frequency of occurrence of claims so that the burden of project cost overrun, a hallmark of the country’s construction industry is substantially reduced. Detailed literature review and preliminary field investigations were used to identify causes of claims related to road construction projects. The study identified six major types of claim and twenty seven causes of claims. Using questionnaire as research instrument, respondents (construction industry major stakeholders i.e. clients, consultants and contractors) were asked to rank the frequency of occurrence of the types and causes of claims in road construction projects on a Likert-type scale. Relative importance index (RII) method was used to analyze the data collected from the questionnaire survey. The analysis was carried out for each group of respondents and on the overall results (all the parties combined). A total of 27 useful responses made up of nine clients, ten consultants and eight contractors) were analyzed. Findings indicated that the clients and consultants specified delay claims followed by extra work claims were the most frequent type of claims in the construction of roads in Botswana. Contractors perceived differing site conditions followed by delay claims as the most frequent type of claims. From the overall response, delay claims were ranked first followed by extra work claims. Acceleration claims were ranked least. The top five most frequent causes of claims based on overall ranking were: variation in quantities, design errors, poor site management and supervision by contractor, ineffective planning and scheduling of project by contractor, and low price of contract due to high competition. Construction industry research in Botswana has never looked into the issue of claims and yet it is one of the hidden sources of construction project failure in the country. It is perceived that hedging against the most adverse causes of claims will stem the tide of incessant cost overrun, litigation and project abandonment on road projects in Botswana.


2021 ◽  
Vol 17 (2) ◽  
pp. 1-17
Author(s):  
Shitaw Tafesse ◽  
◽  
Tamene Adugna ◽  

Construction sites generate a large amount of material wastes and have become a common problem with associated risks in Ethiopia. However, the sources of such wastes are not well recognised. Therefore, the purpose of this research was to analyse the risk factors that contribute to material wastes in building construction projects. To achieve this goal, the factors that cause construction wastes were identified from literature and construction experts via focus group discussions and personal interviews. Following this, the factors were subjected to a questionnaire survey to identify the most critical factors of construction wastes. The questionnaire was distributed purposively to 85 construction experts representing contractors, consultants, and clients and 70 questionnaires were duly received for analysis. The data were analysed with a mean score and ranked to identify the most critical factors generating material wastes at construction sites. According to the results of the study frequent changes made to the design, poor strategies for waste minimisation, improper storage of material, poor site management, poor planning and supervision, and errors of contract document were the most critical factors causing construction wastes.


2015 ◽  
Vol 735 ◽  
pp. 109-116 ◽  
Author(s):  
Mahdi Rafieizonooz ◽  
Mohd Razman Salim ◽  
Elnaz Khankhaje ◽  
Mohd Warid Hussin ◽  
Ali Zarebidaki ◽  
...  

Construction industry is one of the most profitable sectors in Iran’s economic. Delay is common problem in the construction projects in Iran. By considering all viewpoints of the parties, this research identified the most effective and severe causes of delay in construction projects in the Capital of Iran, Tehran. Questionnaires were distributed among respondents who are involved in the construction project in Tehran. The process of data analysis and discussions were conducted based on the two statistical techniques namely descriptive analysis (RII) and factor analysis. Using factor analysis, most critical factors of Tehran’s construction delay were recognized as: (1) lack of commitment; (2) inefficient site management; (3) poor site coordination; (4) Complexity in heritage and legislation; (5) Lack of estimation skills and skilled workers; (6) Lack of communication between parties; (7) Improper planning; and (8) Lack of clarity in contract. These results are anticipated to be important contributions to construction projects in Tehran in controlling the time overruns in construction contracts.


Author(s):  
Raj Kapur Shah

<p>Cost and time overruns are the key problems of any construction projects. These issues are causing the negative impact on the development of country economic growth and prosperity. To overcome these issues, the paper is aimed to discover the most influence factors causing the project delay and cost overruns and recommend the possible measures by investigating case studies in three different countries in the world. Each country’s quantitative data from the past studies was selected to analyze and recommend the effective measures. A questionnaire survey was conducted in all three case studies adopting different data collection strategy. The reason of selecting three case studies is to outline the compare analysis of delay factors and to classify why different delay factors have different priority level of influence in project delay from one country to another country. The findings from the case studies exposed that the most influential factors in Australia are (1) planning and scheduling deficiencies, (2) methods of construction, (3) effective monitoring and feedback process, whereas in Ghana, (1) delay in payment certificates (2) underestimating of project cost, (3) complexity of projects are the most influential factors.  However, in Malaysia (1) Contractor’s improper planning, (2) poor site management, (3) inadequate contractor experience are the most influential factors. This paper has also analysed the average and least impact of the delay factors causing project delay and cost overruns in those countries. The paper concludes that there are diverse groups of delay factors from one country to another country that causing project delay and cost overruns. It also concludes that there are diverse measures according to the nature of delay factors to reduce the impact on project delay and cost overruns in construction industry.</p><p><strong>Journal of Advanced College of Engineering and Management</strong>, Vol. 2, 2016, Page: 41-55</p>