scholarly journals Mechanical interaction of a reinforced concrete slab and a steel beam in bridge spans

2020 ◽  
Vol 1479 ◽  
pp. 012140
Author(s):  
Vladimir A Kozlov ◽  
Alexey V Kozlov
Author(s):  
Ralph Alan Dusseau

The results of a study funded by the U.S. Geological Survey as part of the National Earthquake Hazards Reduction Program are presented. The first objective of this study was the development of a database for all 211 highway bridges along I-55 in the New Madrid region of southeastern Missouri. Profiles for five key dimension parameters (which are stored in the database) were developed, and the results for concrete highway bridges are presented. The second objective was to perform field ambient vibration analyses on 25 typical highway bridge spans along the I-55 corridor to determine the fundamental vertical and lateral frequencies of the bridge spans measured. These 25 spans included six reinforced concrete slab spans and two reinforced concrete box-girder spans. The third objective was to use these bridge frequency results in conjunction with the dimension parameters stored in the database to develop empirical formulas for estimating bridge fundamental natural frequencies. These formulas were applied to all 211 Interstate highway bridges in southeastern Missouri. Profiles for both fundamental vertical and lateral frequencies were then developed, and the results for concrete highway bridges are presented.


2021 ◽  
pp. 136943322199248
Author(s):  
Reza Masoudina

Stub girder flooring systems are a widely used system in modern steel buildings. This type of system is a composite flooring system consisting of a continuous steel beam and a reinforced concrete slab set apart by a series of short, and usually wide, flange parts known as stubs. While many studies and research have been conducted on this system in steel-concrete composite structures, comparable comprehensive research has not been done on Stub girder flooring system for timber construction. This study represents a review on stub girders, and focuses on experimental and analytical works in the area. Finally, pervious researches and experimental data about stub girder flooring system have been collected and summarized in a table format which has been listed parameters in the researches.


1985 ◽  
Vol 50 ◽  
Author(s):  
A. Atkinson ◽  
D. J. Goult ◽  
J. A. Hearne

AbstractA preliminary assessment of the long-term durability of concrete in a repository sited in clay is presented. The assessment is based on recorded experience of concrete structures and both field and laboratory studies. It is also supported by results of the examination of a concrete sample which had been buried in clay for 43 years.The enoineering lifetime of a 1 m thick reinforced concrete slab, with one face in contact with clay, and the way in which pH in the repository as a whole is likely to vary with time have both been estimated from available data. The estimates indicate that engineering lifetimes of about 103 years are expected (providing that sulphate resisting cement is used) and that pH is likely to remain above 10.5 for about 106 years.


2014 ◽  
Vol 606 ◽  
pp. 229-232 ◽  
Author(s):  
Petr Tej ◽  
Vítězslav Vacek ◽  
Jiří Kolísko ◽  
Jindřich Čech

The paper focuses on a computer nonlinear analysis of the formation and development of cracks in a concrete slab exposed to a uniform continuous load on the lower surface. The analysis is based on an actual example of the formation and development of cracks in a basement slab exposed to ground water buoyancy.


2011 ◽  
Vol 243-249 ◽  
pp. 1072-1084 ◽  
Author(s):  
Qiong Yu ◽  
Zhou Dao Lu ◽  
Jiang Tao Yu ◽  
Xing Zhuang Zhao ◽  
Jin Dai

Test of two specimens (four different joints) of steel secondary beam embedded in reinforced concrete girder in frame structure and one specimen with steel cantilever beam embedded in reinforced concrete girder under static load were conducted. The steel beam up-flange was pulled out because of the concrete cracks caused by the moment, shear and torsion at the upper zone of the concrete beam near the steel beam end. Shear failure of the concrete beam and the top flange pullout failure are the most hazardous failure modes. Lacking restraint of concrete and the reinforcement of steel bar in the concrete slab and catenary action of restraint steel beam, the capacity of steel cantilever beam is much smaller than other beams. Load-slip curve of top flange of steel beam, load-rotation curve of the steel beam end are obtained through experiment. Primary calculation method of joints flexural capacity related to section size of composite steel beam, embedded depth of steel beam, flange width of steel beam embedded end, height of frame girder, is put up with. Analytical results of ABAQUS are shown as follows. Top flange pullout failure of steel beam is caused by the detachment of concrete and steel beam end, and the warp of the concrete slab near the support plays an unfavorable action on the performance of the steel beam. The end rotational angle of the steel beam with anchor bar is smaller than that without. The steel beam with shear connectors develops a smaller rotational angle and a higher load capacity.


Sign in / Sign up

Export Citation Format

Share Document