scholarly journals Novel Responsive Controllable Solidification Plugging Agent to Overcome Lost Circulation Problems in Long Open Hole Intervals

2020 ◽  
Vol 1637 ◽  
pp. 012008
Author(s):  
Long Li ◽  
Da Yin ◽  
Weiwei Hao
Author(s):  
Majeed Abimbola ◽  
Faisal Khan ◽  
Vikram Garaniya ◽  
Stephen Butt

As the cost of drilling and completion of offshore well is soaring, efforts are required for better well planning. Safety is to be given the highest priority over all other aspects of well planning. Among different element of drilling, well control is one of the most critical components for the safety of the operation, employees and the environment. Primary well control is ensured by keeping the hydrostatic pressure of the mud above the pore pressure across an open hole section. A loss of well control implies an influx of formation fluid into the wellbore which can culminate to a blowout if uncontrollable. Among the factors that contribute to a blowout are: stuck pipe, casing failure, swabbing, cementing, equipment failure and drilling into other well. Swabbing often occurs during tripping out of an open hole. In this study, investigations of the effects of tripping operation on primary well control are conducted. Failure scenarios of tripping operations in conventional overbalanced drilling and managed pressure drilling are studied using fault tree analysis. These scenarios are subsequently mapped into Bayesian Networks to overcome fault tree modelling limitations such s dependability assessment and common cause failure. The analysis of the BN models identified RCD failure, BHP reduction due to insufficient mud density and lost circulation, DAPC integrated control system, DAPC choke manifold, DAPC back pressure pump, and human error as critical elements in the loss of well control through tripping out operation.


2021 ◽  
Author(s):  
David Salinas Sanchez ◽  
Mario Noguez Lugo ◽  
Oscar Zamora Torres ◽  
Cuauhtemoc Cruz Castillo ◽  
Moises Muñoz Rivera ◽  
...  

Abstract A 7-in. liner was successfully cemented in the south east region of Mexico at 7530 m MD despite significant pressure and temperature challenges. The entire 1,370-m, 8.5" open hole section needed cement coverage and isolation to test several intervals. The challenge of the ultranarrow working pressure window was overcome by using managed pressure cementing (MPC) along with lost circulation solutions for the cement slurry and spacer. Due to the narrow pressure window (0.05 g/cc density gradient), mud losses could not be avoided during the cementing job. To limit and manage losses, an MPC placement technique was proposed, in conjunction with using lost circulation fiber technology in the cement slurry and spacer. After addressing the losses and narrow working pressure window, the next main challenge was the extremely high temperature (Bottom hole static temperature of 171°C). Extensive lab testing provided the fluid solution: HT formulations for cement slurry and spacer to maintain stability and rheology for placement and management of equivalent circulating density and set cement properties for long-term zonal isolation. After the liner was run to bottom, the mud density was homogenized from 1.40 g/cc to 1.30 g/cc (pore pressure: 1.38 g/cc). During this process, 32.5 m3 of mud was lost to the formation. During the previous circulation, the backpressure required to maintain the equivalent circulation density (ECD) above pore pressure, which was calculated and validated resulting in 1,100 psi annulus surface pressure (close to the limit of the equipment capacity) during the stopping time. The cementing job was pumped flawlessly with only 10 m3 of mud loss at the end of the job. During reverse circulation, contaminated spacer at surface indicated no cementing fluid had been lost to the formation and adequate open-hole coverage. The liner was successfully pressure tested to 4,500 psi, and cement logs showed that the cement had covered the open hole completely. MPC is not a conventional cementing technique. After the successful result on this job and subsequent operations, this technique is now being adopted to optimize cementing in even deeper wells in Mexico, where losses during cementing operations in the past had modified or limited the whole well construction and designed completion, and production of the well.


2021 ◽  
Author(s):  
Harpreet Kaur Dalgit Singh ◽  
Ho Ching Shearn ◽  
Bao Ta Quoc ◽  
Dien Nguyen Van

Abstract When drilling from a deepwater semisubmersible rig, the operator encountered wells problems, including lost circulation, influxes, and ballooning, in the 14 3/4-in. hole section. Managed Pressure Drilling (MPD) equipment that helped to mitigate these issues specifically, when stripping in the hole with the bottom hole assembly through the Rotating Control Device (RCD) bearing assembly while managing surge and swab pressures, monitoring the well while displacing heavy mud into the open hole, conditioning the contaminated mud, removing gas from the well, and fingerprinting the flow back to verify ballooning against influxes, and finally stripping out of the hole. The operator experienced a total loss of circulation at the 16-in. liner shoe at 1,633m while drilling the 14 3/4-in. hole section. Several lost-circulation material (LCM) pills of different weights were pumped to cure the losses without success. Then the well was flow-checked, the gain was noted, and the well shut-in. Having the MPD chokes and the Coriolis flowmeter in place made it possible to adjust the surface back pressure (SBP) accordingly within a small operating window. As a result, the operator could achieve the key objectives of stripping the drillstring in the hole, stripping out of the hole, and rolling over to spot 1.88SG heavy mud on the bottom using the pump and pull method. After LCM was pumped and a hesitation squeeze performed, well operations were stabilized, and the casing was run to a 2,111m measured depth. Advanced flow monitoring enabled the MPD to determine the required SBP for balancing the well. MPD applied 60psi of SBP and noted a gain of 8.3bbl/hr from the flowmeter. Next, MPD applied 65psi SBP and the well was static. Then, MPD applied 70psi SBP, and the well took losses at a rate of 19bbl/hr. MPD allowed to successfully strip the BHA in the hole through the RCD bearing assembly to the shoe. Correct string displacement observed via the MPD Virtual Trip Tank, achieved by adjusting the SBP from 62psi to 125psi. The closed-loop circulating system enabled safely circulating and conditioning contaminated gas-cut mud in the hole back to homogeneous mud. MPD reduced SBP incrementally and fingerprinted flow back at every step to give assurance that well ballooning, and not influxes, caused the flow back. Dynamically adjusting SBP, coupled with advanced monitoring of the returns flow using the Coriolis flowmeter, enabled balancing the well despite the challenges of a mixed mud gradient in the annulus and a narrow operational window. The MPD riser consisted of an RCD below-tension-ring (BTR)-s, flow spool, and top and bottom crossovers. Rig modifications involved fabricating the fixed piping to allow integrating MPD equipment with the rig system.


2014 ◽  
Vol 136 (3) ◽  
Author(s):  
Aniket Kumar ◽  
Robello Samuel

The “Smear Effect” observed during a casing-while-drilling operation helps reduce lost circulation, provides wellbore strengthening, and improves the fracture gradient so we can drill more effectively through depleted reservoirs. Several case studies have been reported confirming the formation of a smear zone around the wellbore wall, due to the plastering of cuttings and added lost circulation materials. However, even after successful application in a number of cases, a thorough understanding of the parameters affecting the formation of the smear zone and the subsequent increase in the fracture gradient is not available. This study analyses the theory behind the phenomenon of the smear effect mechanism using case studies and existing literature, and then applies analytical models to estimate the improvement in the fracture gradient based on the drilling parameters and reservoir properties. The formation of the smear zone has been investigated by modeling the mechanism of initiation of micro-fractures around the wellbore wall due to high equivalent circulating densities (ECDs) occurring during casing while drilling. The effect of plugging of these generated micro-fractures by the drilled cuttings and additional lost circulation material added has then been modelled, to estimate the resultant improvement in fracture gradients expected along the wellbore open hole section. In addition, the appropriate particle size distribution required to successfully plug the micro-fractures has also been presented. These analytical models have then been applied to a simulated field case study and the results have been analysed in the context of recorded field observations to simulate the smear effect using the proposed models. The contribution of the casing size and length, formation properties, and operating parameters on the initiation of micro-fractures and the increase in fracture gradient has also been presented to better demonstrate the mechanism of the formation of the smear zone. This analysis is one of the first of its kind of theoretical study to understand the fundamentals of the smear effect mechanism and can be suitably applied to enhance our understanding of the smear effect to use it better to our advantage.


2013 ◽  
Vol 651 ◽  
pp. 717-721 ◽  
Author(s):  
Jin Feng Wang ◽  
Jin Gen Deng

Fuzzy ball drilling fluids have been developed in order to effectively control lost circulation during CBM drilling. Depending upon fuzzy balls and colloids in fuzzy balls, the fuzzy ball drilling fluids changed their shapes and properties to completely plug underground heterogeneous seepage channels so as to strengthen the pressure bearing capacity of formations. This paper describes the available features of the fuzzy ball drilling fluid including efficient plugging, good carrying and suspension, formation damage control, compatible weighted by any weighted materials without auxiliary equipment. The fuzzy ball drilling fluids can finish drilling in low pressure natural gas zone, control CBM leakage; control the natural fractures, drilling in different pressures in the same open hole, combination with the air drilling mode, etc. during Ordos CBM drilling. The fuzzy ball drilling fluid will not affect down-hole motors and MWD. The fuzzy ball drilling fluid will be blend simply as conventional water based drilling fluids. The existing CBM drilling equipment can completely meet the fuzzy ball drilling mixing and it is maintained conveniently. The fuzzy ball drilling fluid is the efficient drilling fluid.


2021 ◽  
Author(s):  
Gerard O'Reilly ◽  
Alvin W. Chan

Abstract Depleted Fracture Gradients have been a challenge for the oil and gas industry during drilling and cementing operations for over 30 years. Yet, year after year, problems related to lost circulation, borehole instability (low mud weight due a low fracture gradient), and losses during cementing operations leading to NPT and remedial work continue to rank as some of the top NPT events that companies face. This paper will demonstrate how the geomechanical modeling, well execution and remedial strengthening operations should be implemented to provide for a successful outcome. The use of a Fracture Gradient (FG) framework will be discussed, and the use of a negotiated fracture gradient will highlight how the fracture gradient can be changed during operations. This paper will also show actual examples from Deepwater operations that have successfully executed a detailed borehole strengthening program. Through our offset studies and operational experience, we will provide a format for navigating complex depleted drilling issues and show an example on recovering from low fracture gradients. This paper will demonstrate (1) how our framework facilitated multi-disciplinary collaborative discussion among our subsurface and well engineering communities; (2) how the impacts of drilling fluids and operational procedures can change this lost circulation threshold; and (3) how our negotiated FG approach has successfully delivered wells drilled in narrow margins.


Author(s):  
Yuanhang Chen ◽  
Mengjiao Yu ◽  
Stefan Miska ◽  
Evren Ozbayoglu ◽  
Yongfeng Kang ◽  
...  

Lost circulation is one of the most persistent and costly drilling problems that drilling engineers have been struggling with for decades. The main reason why some of the remedial procedures are not working as planned is the lack of information, such as the location of the loss zone. The pinpointing of the zone of loss will allow the treatment to be applied directly to the point of loss rather than to the entire open hole. This paper presents an approach to predict the location of loss zone from the transient mud circulation temperature profile altered by the mud loss. A numerical model in estimating the transient mud circulating temperature profile during a lost circulation event is developed. The temperature profile in both the flow conduits (drillpipe and annulus) are modeled using mass and energy balance. The flow rate of drilling mud decreases in the annulus above the loss zone as part of the fluids lost into the fractures, which in turn alters the heat transfer between the drillpipe, annulus, and formation. The wellbore is divided into two multiple sections, which account for single multiple loss circulation zones. Rigorous heat transfer in the formation is included. Case studies are performed and numerical solution results are presented and analyzed. According to the results, temperature alterations induced by mud loss include: 1) Declines in both bottom-hole temperature (BHT) and mud return temperature over time, and 2) Discontinuity in the first order derivative of annulus temperature with respect to depth at the location of loss zone; meanwhile, the temperature alterations are mainly controlled by the mud loss rate and location of loss. By matching the simulated results with the distributed temperature measurements at different times, the depth of the loss zone can be identified. This piece of information is important for the spotting of LCM (lost circulation material) pills, the optimization of overbalance squeezing pressure, as well as the consideration of setting the cement plug or additional casing.


Author(s):  
M. A. Ojinnaka ◽  
J. J. Beaman ◽  
S. Fish

The risk of kick and lost circulation at the wellbore open-hole increases with water depth due to narrow pressure margins. The safety of drilling operations and mitigation of risk to drilling personnel, equipment, and the environment hinges on the ability of the drilling crew to detect these undesirable events in their early stages and quickly bring the well under control. This paper presents an approach for the estimation of unobserved bottom-hole phenomena during drilling ahead operations by means of combining multiple surface measurements with predictions from a hydraulic model of the well. Bond graph technique is used to formulate a lumped-parameter hydraulic model of the drilling ahead process, the model is linearized, and an estimation method is applied to the proposed stochastic model. This methodology was tested offline with drilling ahead data from a well where a kick occurred and the results showed kick detection earlier than traditional methods allowed.


2021 ◽  
Author(s):  
Manchukarn Naknaka ◽  
Chimere Nkwocha ◽  
Pattarapong Prasongtham ◽  
Tossapol Tongkum ◽  
Trinh Dinh Phu ◽  
...  

Abstract Well X is an infill horizontal well designed for the Gulf of Thailand. It is challenging due to the following factors - A long 8 ½ inch open hole section, An extended reach section at horizontal or near horizontal, the presence of loss circulation zones, an Extended Reach Drilling (ERD) ratio of 2.725 and a Drilling Difficulty Index (DDI) of 6.762. The key challenge was to successfully deploy the 7 inch casing across 12,350 ftMD of open hole, with potential loss circulation zones. In spite of these difficulties, the 7 inch casing was successfully landed with the use of an Ultra-High Speed Rotational Reamer Shoe. Historically, losses of circulation have posed significant challenges to well delivery in the Gulf of Thailand wells. In Well X, this is further complicated by a long open-hole section with a step-out of over 10,000 ftMD. It was determined that the successful deployment of the 7 inch casing would require some degree of agitation at the nose, and such a device must be tolerant to the Lost Circulation Materials (LCM) type and the composition of the drilling fluid and the cement. An ultra-high speed rotational reamer shoe was specially configured to meet the LCM requirements in the displaced fluid, for use in deploying the casing. While deploying the 7 inch casing, losses of up to 20 bbls/hr occurred from 7,043 ftMD while running at 15 joints/hr. A loss circulation recipe comprising of 60 bbls of 30 ppb Tiger LCM was mixed and successfully displaced through the customized ultra-high speed reamer shoe to cure losses. The casing was washed down from 10,569 to 11,610 ftMD, filling casing each stand. The 7 inch casing was successfully landed at the target depth of 12,353 feet and subsequently cemented. Drill out operations took 1.5 hours to complete. A formation integrity test (FIT) showed good shoe strength which was later confirmed by the cement evaluation logs. The comprehensive Ultra-High Speed Reamer Shoe was configured with a minimum restriction of 15mm, which is 5 times the diameter of the maximum particle size in the LCM of 3 mm. The tool was designed to tolerate the prescribed loss circulation materials, making it possible to cure the losses while running the casing string. The innovative Ultra-High Speed Reamer Shoe has demonstrated its usefulness by providing a higher probability for successfully deploying the 7 inch production casing over the extended reach section of Well X. The application of this technology can mitigate against non-productive time such as wiper trips or excessive washing down or casing rotation. It has proven to be a reliable technology that can be used in the industry in challenging well designs.


2012 ◽  
Vol 602-604 ◽  
pp. 843-846
Author(s):  
Zuo Chen Li ◽  
Zhi Heng Zhang ◽  
Liang Zhan ◽  
Jia Rong Cai

Fuzzy ball drilling fluids have been developed in order to effectively control lost circulation during CBM drilling. Depending upon fuzzy balls and colloids in fuzzy balls, the fuzzy ball drilling fluids changed their shapes and properties to completely plug underground heterogeneous seepage channels so as to strengthen the pressure bearing capacity of formations. This paper describes the available features of the fuzzy ball drilling fluid including efficient plugging, good carrying and suspension, formation damage control, compatible weighted by any weighted materials without auxiliary equipment. The fuzzy ball drilling fluids can finish drilling in low pressure natural gas zone, control CBM leakage; control the natural fractures, drilling in different pressures in the same open hole, combination with the air drilling mode, etc. during Ordos CBM drilling. The fuzzy ball drilling fluid will not affect down-hole motors and MWD. The fuzzy ball drilling fluid will be blend simply as conventional water based drilling fluids. The existing CBM drilling equipment can completely meet the fuzzy ball drilling mixing and it is maintained conveniently. The fuzzy ball drilling fluid is the efficient drilling fluid.


Sign in / Sign up

Export Citation Format

Share Document