scholarly journals Shorten Lead Time of the Procurement Process in Aluminium Smelter

Author(s):  
Ade Buandra ◽  
Duan Ricky Hutauruk ◽  
Mazaya Dini Ramadhani
2018 ◽  
Vol 5 (2) ◽  
pp. 27-41
Author(s):  
Charles Okeyo Owuor

County governments in Kenya have been consistently accused of poor budget absorption. This article sought to assess misallocation of county funds and the delays in procurement process on budget absorption in county governments in Kenya. Descriptive research design was used. The study found out that there was misallocation of funds from the national governments to county treasuries and from the county treasuries to various department projects and activities which in effect affected the procurement processes. Procurement functions in the county governments were inefficient owing to the lead time and bureaucracies involved in procurement. The study therefore recommended for county governments in collaboration with commission for revenue allocation and the national treasuries to come up with a criterion for ensuring smooth flow of funds from the national treasury to the end user departments.


2019 ◽  
Vol 10 (1) ◽  
pp. 1-27
Author(s):  
Aniek Wijayanti

Business Process Analysis can be used to eliminate or reduce a waste cost caused by non value added activities that exist in a process. This research aims at evaluating activities carried out in the natural material procurement process in the PT XYZ, calculating the effectiveness of the process cycle, finding a way to improve the process management, and calculating the cost reduction that can achieved by activity management. A case study was the approach of this research. The researcher obtained research data throughout deep interviews with the staff who directly involved in the process, observation, and documentation of natural material procurement. The result of this study show that the effectiveness of the process cycle of natural material procurement in the factory reached as much as 87,1% for the sand material and 72% for the crushed stone. This indicates that the process still carry activities with no added value and still contain ineffective costs. Through the Business Process Mechanism, these non value added activities can be managed so that the process cycle becomes more efficient and cost effectiveness is achieved. The result of the effective cycle calculation after the management activities implementation is 100%. This means that the cost of natural material procurement process has become effective. The result of calculation of the estimated cost reduction as a result of management activity is as much as Rp249.026.635,90 per year.


2011 ◽  
Author(s):  
B. Mazumder ◽  
B. K. Mishra
Keyword(s):  

2018 ◽  
Vol 2 (3) ◽  
pp. 427
Author(s):  
Dewi Kania Sugiharti ◽  
Muhammad Ziaurahman ◽  
Sechabudin Sechabudin

Universities that apply the concept of Public Service Agency (BLU - PK PTN ) in performing functions as an organ which is engaged in the service infrastructure support through goods or services . As an institution under the auspices of the government and the state budget receives PTN PK - BLU implement mechanisms to acquire goods or services in accordance with the law. However, the procurement process in obtaining goods or services sometimes poses problems that arise as a consequence of the passage of the procurement of goods or services involving the organs in it as PA / KPA , KDP , ULP , and Committee / Receiver Procurement Officer. Rector of the KPA in PK - BLU PTN has the authority to control the organs that carry out the process of procurement of goods / services in the environment . Errors in the procurement process of goods / services performed by the CO and the ULP / Procurement Officer causing state losses due to these errors, either due to negligence or unlawful acts. As the KPA in the process of procurement of goods / services Rector can control the organs in accordance with the authority given. The consequences are acceptable if the authorities ultimately the procurement of goods / services did not heed the warning Rector officials related procurement process of goods / services will receive sanctions. Keywords: Authorized Budget, Financial State.


INFO ARTHA ◽  
2017 ◽  
Vol 1 (1) ◽  
pp. 17-34
Author(s):  
Fadlil Usman

Probity audit is an independence assessment activity to ensure the goods/services procurement processes have been implemented consistently appropriate with the principle of upholding integrity, uprightness, honesty and fulfill certain occur legislation aimed for improving the accountability for the use of public sector fund. Probity audit is done in real time simultaneously with the goods/services procurement process. This study aims to evaluate the suitability of the implementation of probity audit conducted by BPKP Headquarter as agency that initiated the implementation of probity audit in Indonesia compared with the Probity audit Guidelines for Procurement of Goods/Services as criteria. The results of this study indicate that the implementation of probity audit conducted by BPKP Headquarter has been implemented adequately, but there are activities that do not fit the criteria, especially in the activities of the determination of the scope of the audit, the preparation of working papers and the follow-up monitoring of the audit results. Probity audit merupakan kegiatan penilaian (independen) untuk memastikan bahwa proses pengadaan barang/jasa telah dilaksanakan secara konsisten sesuai dengan prinsip penegakan integritas, kebenaran, kejujuran dan memenuhi ketentuan perundangan yang berlaku yang bertujuan meningkatkan akuntabilitas penggunaan dana sektor publik. Probity audit dilakukan secara real time yaitu bersamaan dengan pelaksanaan pengadaan barang/jasa. Penelitian ini bertujuan untuk melakukan evaluasi kesesuaian pelaksanaan probity audit yang dilakukan oleh BPKP Pusat selaku instansi yang menginisiasi pelaksanaan probity audit di Indonesia dibandingkan dengan kriteria berupa Pedoman Probity audit Pengadaan Barang/Jasa Pemerintah. Hasil dari penelitian ini menunjukkan bahwa pelaksanaan probity audit yang dilakukan oleh BPKP Pusat sudah dilaksanakan secara memadai, namun masih terdapat hal yang belum sesuai dengan kriteria terutama dalam kegiatan penentuan ruang lingkup audit, penyusunan kertas kerja dan pemantauan terhadap tindak lanjut hasil audit.


2019 ◽  
Vol 6 (1) ◽  
pp. 48-50
Author(s):  
Ikram Uddin

This study will explain the impact of China-Pak Economic Corridor (CPEC) on logistic system of China and Pakistan. This project is estimated investment of US $90 billion, CPEC project is consists of various sub-projects including energy, road, railway and fiber optic cable but major portion will be spent on energy. This project will start from Kashgar port of china to Gwadar port of Pakistan. Transportation is sub-function of logistic that consists of 44% total cost of logistic system and 20% total cost of production of manufacturing and mainly shipping cost and transit/delivery time are critical for logistic system. According to OEC (The Observing Economic Complexity) currently, china is importing crude oil which 13.4% from Persian Gulf. CPEC will china for lead time that will be reduced from 45 days to 10 days and distance from 2500km to 1300km. This new route will help to china for less transit/deliver time and shipping cost in terms of logistic of china. Pakistan’s transportation will also improve through road, railway and fiber optic cabal projects from Karachi-Peshawar it will have speed 160km per hour and with help of pipeline between Gwadar to Nawabshah gas will be transported from Iran. According to (www.cpec.inf.com) Pakistan logistic industry will grow by US $30.77 billion in the end of 2020.


Sign in / Sign up

Export Citation Format

Share Document