Trends of integrated project delivery implementations viewed from an emerging innovation framework

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ahmed Rashed ◽  
Ivan Mutis

PurposeResearch into integrated project delivery (IPD) has attracted increased attention over the past 2 decades, and a significant number of IPD studies have been published more recently. The purpose of the study is to explore the state of IPD to reveal innovative areas of focus.Design/methodology/approachThe research presented puts forward a science mapping and bibliometrics methods to study systematic analysis of IPD scientific output published between 2006 and 2020. It uses a framework from emerging literature relating to innovation to incorporate a perspective of the process of innovation for the analysis of IPD. The adapted framework from the literature on innovation, called the Technology Innovation System (TIS), has functions that reveal novelty in the existing structures of IPD. The framework uses the analysis of scientific output from science mapping and bibliometric study techniques, using the ScienceDirect (SD) and Web of Science (WoS) databases as sources. The framework analyzes factors involved in the development and diffusion of the IPD approach and charts new knowledge development on IPD.FindingsFrom the analysis, future implementation of IPD will converge on cases of collaboration, as a systemic feature, among participating stakeholder teams. A significant and robust effect resulted from collaboration and integration as major mechanisms influence opportunities, problems and solutions within construction firms using IPD, marking a future trend. Reports further substantiate the importance and focus on collaboration and integration between IPD practitioners. With the same dynamic and gradual prominence, building information modeling (BIM) and new technology applications demonstrated the importance of the development and diffusion of IPD in the form of, for example, digital government initiatives. It is expected that the trend for IDS and resource mobilization functions will continue to grow – clear evidence of the benefits of the IPD approach in the construction sector. New evidence for gaining cognitive and normative legitimacy emerged. The expansion of new avenues for further legitimation is expected to enable growth.Research limitations/implicationsBeyond the innovative approach of viewing IPD from the emerging innovation framework, the research presented fully contributes to IPD literature, providing a comprehensive state-of-the-art status and a quantitative analysis of IPD scientific output, thereby illuminating promising work areas for future research into IPD. The main limitation is related to the dynamic process of indexing of IPD literature in the WoS and SD – although many new research publications are added in the discipline, only a part of them have been indexed in the WoS and SD core database.Practical implicationsThe study revealed key evolving trends within the field, including instructive findings and implications concerning possible deficiencies. Based on factors from network visualizations and quantitative evaluation from major influential articles, journals and authors, future critical IPD implementation focus will be on BIM and sustainability concepts – centerpiece concepts for the evolving line of IPD growth and development in the architecture, engineering and construction industry.Social implicationsThis study fills the gap created in a shortage of studies mapping out the most critical contributions in journals, authors and research perspectives related to IPD. It presents a framework that can be used as an objective procedure to evaluate the topic. It is expected that the study will serve as a cornerstone for researchers in this field, as it provides a bibliometric analysis and presents trends using an analytical framework of innovation.Originality/valueThe research presented is a keystone in the foundation of the literature review on this topic. The research draws on an existing framework for innovation – the TIS, developed from innovation studies using a robust theoretical framework to enable further analysis of IPD. This approach is one of a kind, using the results of scientometric analysis to study the scientific landscape and knowledge output of IPD in the AEC community. Science-mapping bibliometric analysis was conducted to shed light on IPD trends and explain factors that back or support the development and diffusion of IPD, including shaping and enabling evolution and growth. The framework helps to shed light on the interaction of socio-technical structures (i.e. stakeholders, technologies and rules) embedded in the industry, which helped create, direct and advance IPD in the project delivery system.

2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Lamis Yasser Wagih Youssef

Purpose This paper aims to develop a framework for implementing the integrated project delivery (IPD) approach during the design process in architecture design firms (ADFs) in Egypt. Design/methodology/approach A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, literature review was used to identify and categorise the challenges of implementing IPD during the design process. Second, four case studies were analysed to investigate the values delivered to the client or missed due to the use of IPD or traditional procurement approaches, respectively. Finally, a survey questionnaire was carried out with a representative sample of ADFs in Egypt to investigate their perception towards the challenges of IPD implementation in Egypt. Based on the results of the above, the research developed a framework to facilitate the implementation of IPD in ADFs in Egypt. Findings Through literature review, the research identified 30 challenges that hamper the implementation of IPD in ADFs. These challenges were categorised due to their nature into five groups, namely, integration, cooperation, commitment and trust challenges, knowledge, experience skills and decision-making challenges, cultural challenges, legal and contractual challenges and technical and financial challenges. Results of data analysis showed that “poor communication and spirit of collaboration between project stakeholders” was ranked the highest influential challenge as IPD is based on collaboration and trust between project participants. In addition, “lack of training and motivation in investing for using IPD” was ranked the lowest influential challenge due to the poor attention paid to training in the construction industry. Moreover, despite the benefits of IPD implementations in many countries worldwide, it is not implemented in the Egyptian context. This necessitated taking action towards developing a framework to facilitate IPD implementation in ADFs in Egypt. Research limitations/implications The research focussed on ADFs in Egypt. Practical implications Adopting the proposed framework developed through this research will help implementing IPD during the design process in ADFs. Originality/value The research identified, categorised and analysed the challenges that obstruct the implementation of IPD in ADFs. The research tackled a topic that received scant attention in construction literature in the Middle East generally and Egypt in particular. In addition, this paper presented a framework to facilitate the implementation of IPD during the design process, which represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2019 ◽  
Vol 27 (1) ◽  
pp. 186-204 ◽  
Author(s):  
Serdar Durdyev ◽  
M. Reza Hosseini ◽  
Igor Martek ◽  
Syuhaida Ismail ◽  
Mehrdad Arashpour

Purpose The purpose of this paper is to quantify the barriers to the use of integrated project delivery (IPD), as assessed by 115 construction professionals in Malaysia. Design/methodology/approach Barriers recording highest citation amongst researchers worldwide were collated in the form of a conceptual model. This model was validated via a partial least squares structural equation modelling technique. Findings Findings advance the body of knowledge on IPD by providing original insights into the nature of key barriers, quantifying the relative importance of each barrier. Research limitations/implications Despite the above-mentioned contributions, and before drawing any conclusion, it is prudent to acknowledge limitations, particularly the chosen research approach in focusing on the Malaysian context. Therefore, caution must be exercised in direct application of findings to other contexts; research findings should be seen through the lens of moderatum generalisations (see Payne and Williams, 2005). Practical implications Apart from contributions to the body of knowledge, for the world of practice, conditions impacting a transition to IPD are discussed, with a recommendation for change management through a tested mechanism like the European Corporate Sustainability Framework. Originality/value Being the first empirical study undertaken to quantify the relationship among the identified barriers and IPD, the present study contributes to the field by addressing the gap in IPD research in Malaysia, as an exemplar of a developing country; it creates knowledge to inform further improvements in project performance through facilitating IPD use. The study also offers insight to construction stakeholders in other developing countries for tackling issues that hinder the adoption of an IPD approach, and it also points to major barriers such that resources for tackling barriers may be allocated properly.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Eymen Cagatay Bilge

PurposeTechnological developments are having an impact on the construction sector and are creating a paradigm shift in project delivery methods. Traditional project delivery systems are inadequate in current project development processes. A more integrated project delivery system and the establishment of contractual and financial structures are needed. The purpose of this study is to incorporate integrated project delivery and real estate certificate concepts and propose a model for real estate development.Design/methodology/approachAs a methodology, both integrated project delivery and real estate certificate concepts are reviewed individually, and a case to real estate certificate in Turkey is examined.FindingsA real estate certificate is a new method for financing the development process. The system covers the financial dimension of the integrated project delivery system. When these two concepts are combined, they provide an alternative to the real estate development process.Research limitations/implicationsThis study is a preliminary study and lays the foundation for future studies.Practical implicationsIn theory, both concepts have many advantages, in practice, it is essential to create the necessary legal basis for these advantages to be valid. As this process requires significant planning and contract management, the proposed model must be properly designed at the start of the project.Originality/valueThis study proposes a new model for real estate development by combining integrated project delivery and real estate certificate concepts.


2017 ◽  
Vol 17 (1) ◽  
pp. 45-49 ◽  
Author(s):  
Steve Rowlinson

Purpose This paper aims to review the development of building information modelling (BIM) and integrated project delivery (IPD) in recent years and the process changes that BIM and IPD require. Design/methodology/approach A qualitative research methodology was applied which involved a comprehensive review of relevant literature leading to a better understanding of the history and development of BIM and IPD. A way forward is suggested for the future development of BIM and IPD. Findings The research revealed that the IPD approach is already ingrained within certain organisations and their supply chains. The issues of political will and business desire to change the existing procurement systems are examined. The need for fit with regional and national economic and cultural characteristics is a pre-requisite for successful change. Collaborative working, information exchange and trust only exist within the context of a trusted and reliable building information model that all can access, understand and manage. Originality/value This research pointed out that there is a need to overcome the institutional inertia that besets governments and their agencies and suggested that exemplar institutions and their projects are needed to lead the industry by integrating BIM into IPD through process change.


Facilities ◽  
2016 ◽  
Vol 34 (1/2) ◽  
pp. 85-100 ◽  
Author(s):  
Mikko Kantola ◽  
Arto Saari

Purpose – The paper aims to reveal the most functioning project delivery systems for nearly zero-energy building (nZEB) projects. The focus is set to reveal the qualities of the systems that support the nZEB goals and sustainability. Design/methodology/approach – Research method used in this paper is inductive reasoning. The reasoning is based on existing literature, and conclusions are drawn by combining pieces of that literature. Findings – The state-of-the-art heating, ventilation and air conditioning (HVAC) and insulation requirements of nZEB technology and the lack of experience in the industry regarding nZEB projects suggest that modern collaboration-based project delivery systems should be favoured. The authors found that the most suitable project delivery system for a standard nZEB project is the integrated project delivery (IPD), which binds the financial goals of the main parties together via a reimbursement solution: target pricing. The authors also found the construction management (CM) at-risk system a suitable solution, especially if it is modified by adding the tools utilised in the IPD approach, thereby making it an IPD lite system. Originality/value – The paper has value for the entire construction industry in Finland and European Union (EU). The owners and construction companies can use the findings in their development efforts towards nZEB construction. The EU 2020 nZEB degree makes all the findings concerning practicalities of nZEB projects valuable due to the lack of time and the lack of experience in the industry.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Faris Elghaish ◽  
Sepehr Abrishami ◽  
M. Reza Hosseini ◽  
Soliman Abu-Samra

PurposeThe amalgamation of integrated project delivery (IPD) and building information modelling (BIM) is highly recommended for successful project delivery. However, IPD lacks an accurate cost estimation methodology at the “front-end” of projects, when little project information is available. This study aims to tackle this issue, through presenting analytical aspects, theoretical grounds and practical steps/procedures for integrating target value design (TVD), activity-based costing (ABC) and Monte Carlo simulation into the IPD cost structure, within a BIM-enabled platform.Design/methodology/approachA critical review was conducted to study the status of cost estimation within IPD, as well as exploring methods and tools that can enhance the cost estimation process for IPD. Thereafter, a framework is developed to present the proposed methodology of cost estimation for IPD throughout its entire stages. A case project is used to validate the practicality of the developed solution through comparing the profit-at-risk percentage for each party, using both traditional cost estimation and the proposed solution.FindingsAfter applying the proposed IPD's cost estimation framework, on a real-life case project, the findings demonstrated significant deviations in the profit-at-risk value for various work packages of the project (approximately 100% of the finishing package and 22% of openings package). By providing a precise allocation of overhead costs, the solution can be used in real-life projects to change the entire IPD cost structure and ensure a fair sharing of risk–rewards among the involved parties in IPD projects.Practical implicationsUsing the proposed methodology of cost estimation for IPD can enhance the relationship among IPD's core team members; all revealed financial deficiencies will be considered (i.e. compensation structure, profit pooling), hence enhancing the IPD performance.Originality/valueThis paper presents a comprehensive solution for integrating BIM and IPD in terms of cost estimation, offering three main contributions: (1) an innovate approach to utilise five-dimensional (5D) BIM capabilities with Monte Carlo simulation, hence providing reliable cost estimating during the conceptual TVD stage; (2) mathematical models that are developed through integrating ABC into the detailed 5D BIM to determine the three IPD's cost structure limbs; and (3) a novel mechanism of managing cost saving (rewards) through distinguishing between saved resources from organisation level, to daily task level, to increase trust among parties.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Martin Evans ◽  
Peter Farrell ◽  
Emad Elbeltagi ◽  
Helen Dion

Purpose The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International businesses, multinational AEC organisations, technical professionals, project and portfolio management organisations face global connectivity challenges between business units, especially during the outbreak of novel coronavirus pandemic, to manage construction megaprojects (CMPs). That raises the need to manage global connectivity as a main strategic goal of global organisations. This paper aims to investigate barriers to integrating lean construction (LC) practices and integrated project delivery (IPD) on CMPs towards the global integrated delivery (GID) transformative initiatives and develop future of work (FOW) global initiatives in contemporary multinational AEC organisations. Design/methodology/approach A two-stage quantitative and qualitative research approach is adopted. The qualitative research methodology consists of a literature review to appraise barriers to integrating LeanIPD&GID on CMPs. Barriers are arranged into six-factor clusters (FCs), with a conceptualisation of LeanIPD&GID, GID strategy placements and FOW global initiatives with multiple validations. This analysis also involved semi-structured interviews and focus group techniques. Stage two consisted of an empirical questionnaire survey that shaped the foundation of analysis and findings of 230 respondents from 23 countries with extensive cosmopolitan experience in the construction of megaprojects. The survey examined a set of 28 barriers to integrating LeanIPD&GID on CMPs resulting from a detailed analysis of extant literature after validation. Descriptive and inferential statistical tests were exploited for data analysis, percentage scoring analysis, principal component analysis (PCA) and eigenvalues were used to elaborate on clustered factors. Findings The research conceptualised LeanIPD&GID principles and proposed GID strategy placements for LeanIPD&GID transformative initiatives and FOW global initiatives. It concluded that the most significant barriers to integration of LeanIPD&GID on CMPs are “lack of mandatory building information modelling (BIM) and LC industry standards and regulations by governments”, “lack of involvement and support of governments”, “high costs of BIM software licenses”, “resistance of industry to change from traditional working practices” and “high initial investment in staff training costs of BIM”. PCA revealed the most significant FCs are “education and knowledge-related barriers”, “project objectives-related barriers” and “attitude-related barriers”. Awareness of BIM in the Middle East and North Africa (MENA) region is higher than LC and LC awareness is higher than IPD knowledge. Whilst BIM adoption in the MENA region is higher than LC; the second is still taking its first steps, whilst IPD has little implementation. LeanBIM is slightly integrated, whilst LeanIPD integration is almost not present. Originality/value The research findings, conclusion and recommendation and proposed GID strategy placements for LeanIPD&GID transformative initiatives to integrating LeanIPD&GID on CMPs. This will allow project key stakeholders to place emphasis on tackling LeanIPD&GID barriers identified in this research and commence GID strategies. The study has provided effective practical strategies for enhancing the integration of LeanIPD&GID transformative initiatives on CMPs.


2019 ◽  
Vol 26 (1) ◽  
pp. 104-117 ◽  
Author(s):  
Hamid Abdirad ◽  
Carrie S. Dossick

Purpose The purpose of this paper is to clarify that while integrated project delivery (IPD) methods can be momenta for restructuring architectural practice, they do not predetermine specific patterns of restructuration for the roles, responsibilities and services of architects. Design/methodology/approach This paper is based on a multiple case study design; two IPD projects were theoretically sampled and studied. The data collection methods included semi-structured interviews and observations. An inductive data analysis approach was applied to frame the phenomena, conduct cross-case comparisons and develop propositions. Findings While IPD implementations set expectations for new structures for practices, it is the project participants’ situated decisions that lead to the restructuration of some dimensions of architectural practice. The dimensions in this study included team formation, design leadership and collaboration and architectural services. IPD project participants locally changed and redefined conventional roles, responsibilities and project artifacts (e.g. drawings and models) that concerned design development and coordination. Practical implications IPD context, by itself, does not predetermine a fixed pattern of change in establishing designers’ roles, responsibilities and services because restructuration is highly negotiated amongst the IPD parties and can lead to different responses to this contractual setting. Contracts set expectations for collaborative behavior, but the fulfillment of these expectations is situated and emerging as project participants negotiate to develop practices. Originality/value While IPD research and guidelines aim to provide recipes for IPD implementation, this study contributes to the body of knowledge by clarifying that IPD is a context in which unprecedented ways of practice restructuration could emerge.


2019 ◽  
Vol 27 (3) ◽  
pp. 609-633 ◽  
Author(s):  
Elie Georges Andary ◽  
Caesar Abi Shdid ◽  
Arindam Chowdhury ◽  
Irtishad Ahmad

Purpose The public nature of water and wastewater construction capital projects has rendered design-bid-build (DBB) as the delivery method of choice for such projects over the past years. Shortcomings inherent to DBB have had a negative effect on the key performance indicators (KPIs) of these projects. Numerous studies have been published about the benefits offered by integrated project delivery (IPD) in improving the delivery of DBB projects. Links correlating IPD principles to improvements in KPIs of DBB construction projects have not been established scientifically, thus leaving owners with no guidance on which IPD principle(s) to implement in order to improve a particular project KPI. The paper aims to discuss this issue. Design/methodology/approach Actual data were collected from 43 water and wastewater construction projects – including two control projects with full implementation of selective IPD principles – and used to compute major projects KPIs. Regression analysis and a focus group are then utilized to determine the effect of each implemented IPD principle on various project KPIs. Findings Implementation of open communication was found to have a significant effect on reducing project cost overrun, and the co-location of teams significantly reduced the time to respond to RFIs. Collaborative decision making significantly reduced the cost of field rework. Other IPD principles showed less-significant effects on project KPIs and were concluded to be ineffective at improving the projects’ performance. Practical implications An implementation framework is developed that can guide utility owners on which IPD principle(s) to implement in order to improve specific project KPIs. Originality/value This study demonstrates that not all IPD principles will result in performance improvement of a project. A selective and cost-effective implementation of certain IPD principle will have to be based on the nature of the project and the particular KPIs targeted for improvement.


2019 ◽  
Vol 26 (10) ◽  
pp. 2432-2446
Author(s):  
Seoung-Wook Whang ◽  
Kenneth Sungho Park ◽  
Sangyong Kim

Purpose The purpose of this paper is to identify the critical success factors (CSFs) to implement integrated project delivery (IPD) systems in the Korean construction industry. Design/methodology/approach This study categorized potential CSFs and analyzed them using factor analysis and multiple regression analysis to choose the best ones based on responses from Korean construction experts. Findings In total, 29 potential factors were selected and categorized into 7 CSFs using factor analysis. Originality/value The outcomes of the study are useful as a reference for applying the IPD system in different developing countries and mid-sized construction industries.