Normative and descriptive models for COBie implementation: discrepancies and limitations

2019 ◽  
Vol 26 (8) ◽  
pp. 1820-1836 ◽  
Author(s):  
Hamid Abdirad ◽  
Carrie S. Dossick

Purpose The purpose of this paper is to inquire into the reasons why Construction Operation Building Information Exchange (COBie) has not become mainstream across the construction industry despite the significant attempts to promote it. Design/methodology/approach This paper framed and compared the normative model of COBie to a descriptive model of COBie. The normative model was based on the assumptions and planned procedures outlined in the COBie documentation. The descriptive model was developed through a case study of COBie implementation, with ethnographic observations, interviews and artifact analysis as the data collection methods and thematic analysis as the data analysis method. Findings The comparative analysis of the normative and descriptive models showed that the underlying normative assumptions of COBie can be challenged in its implementation. In the case study, implementing COBie disrupted the conventional practice of few participating firms as the data requirements and the expected sequences and timelines of tasks were not aligned with the industry norms for exchanging data. Furthermore, the normative model of COBie could not account for the unanticipated variability in the internal routines of firms for submittal production. Practical implications COBie, as an instruction-based model, may not provide enough flexibility for some firms to adapt to its requirements such that COBie tasks become integrated with their existing workflows. COBie tasks may become additional efforts, and at times, conflict with the industry norms and firms’ routines, and therefore, disrupt the efficiency goals. Originality/value This paper provides empirical evidence to clarify why implementing COBie has not been as efficient for all industry players as expected.

2019 ◽  
Vol 17 (3) ◽  
pp. 301-316 ◽  
Author(s):  
Marjan Sadeghi ◽  
Jonathan Weston Elliott ◽  
Nick Porro ◽  
Kelly Strong

PurposeThis paper aims to represent the results of a case study to establish a building information model (BIM)-enabled workflow to capture and retrieve facility information to deliver integrated handover deliverables.Design/methodology/approachThe Building Handover Information Model (BHIM) framework proposed herein is contextualized given the Construction Operation Information Exchange (COBie) and the level of development schema. The process uses Autodesk Revit as the primary BIM-authoring tool and Dynamo as an add-in for extending Revit’s parametric functionality, BHIM validation, information retrieval and documentation in generating operation and maintenance (O&M) deliverables in the end-user requested format.FindingsGiven the criticality of semantics for model elements in the BHIM and for appropriate interoperability in BIM collaboration, each discipline should establish model development and exchange protocols that define the elements, geometrical and non-geometrical information requirements and acceptable software applications early in the design phase. In this case study, five information categories (location, specifications, warranty, maintenance instructions and Construction Specifications Institute MasterFormat division) were identified as critical for model elements in the BHIM for handover purposes.Originality/valueDesign- and construction-purposed BIM is a standard platform in collaborative architecture, engineering and construction practice, and the models are available for many recently constructed facilities. However, interoperability issues drastically restrict implementation of these models in building information handover and O&M. This study provides essential input regarding BIM exchange protocols and collaborative BIM libraries for handover purposes in collaborative BIM development.


Facilities ◽  
2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Vishal Kumar ◽  
Evelyn Ai Lin Teo

Purpose Until now, the usage and usability factors of Construction Operation Building information exchange (COBie) datasheet have remained largely overlooked. This oversight may be the potential factor in the lower adoption rates as well as the effective usage of COBie datasheet in the architecture, engineering and construction-facilities management industry. The purpose of this study is to investigate the benefits and key issues associated with COBie datasheet handling and identify the key technological solutions, which can help in mitigating the identified issues. Design/methodology/approach A literature review was conducted to identify the key benefits of using COBie and issues, which are associated with COBie datasheet handling. This paper has also designed a questionnaire based on a literature review and surveyed professionals who are well versed with handling COBie datasheet. Using responses, the issues are analyzed and discussed using non-parametric statistical analysis. Findings A total of 9 key benefits and 24 key issues categorized under three groups of usability issues, technical issues and organizational/other issues were identified. The results from the survey agree with all the key issues associated with COBie datasheet handling (with 86 responses). This research also proposes key ideas, that can help in mitigating these issues. Originality/value There is a paucity in published literature, which discusses in detail about the various issues associated with COBie datasheet handling. This research study aims to address this gap by identifying key issues by looking at the entire COBie data-capturing process holistically. Finding from this study can help professionals to understand these issues and develop appropriate technological solutions, which can make COBie data capturing and understanding easier. The findings could also assist in increasing the adoption rate of COBie, which could be achieved through mitigation of identified issues.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
S. Hemalattha ◽  
R. Vidjeapriya

PurposeThis study aims to develop a framework for optimizing the spatial requirements of the equipment in a construction site using a geographic information system (GIS).Design/methodology/approachAn ongoing construction project, an existing thermal powerplant in India, is considered to be the case study, and the corresponding construction activities were scheduled. The equipment spaces were defined for the scheduled activities in building information modelling (BIM), which was further imported to GIS to define the topology rules, validate and optimize the spatial requirements. The BIM simulates the indoor environment, which includes the actual structure being constructed, and the GIS helps in modelling the outdoor environment, which includes the existing structures, temporary facilitates, topography of the site, etc.; thus, this study incorporates the knowledge of BIM in a geospatial environment to obtain optimized equipment spaces for various activities.FindingsSpace in construction projects is to be considered as a resource as well as a constraint, which is to be modelled and planned according to the requirements. The integration of BIM and GIS for equipment space planning will enable precise identification of the errors in the equipment spaces defined and also result in fewer errors as possible. The integration has also eased the process of assigning the topology rules and validating the same, which otherwise is a tedious process.Originality/valueThe workspace for each activity will include the space of the equipment. But, in most of the previous works of workspace planning, only the labour space is considered, and the conflicts and congestions occurring due to the equipment were neglected. The planning of equipment spaces cannot be done based only on the indoor environment; it has to be carried out by considering the surroundings and topography of the site, which have not been researched extensively despite its importance.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Zul-Atfi Bin Ismail

PurposeThe contemporary practice of conventional maintenance for industrialised building system (IBS) constructions suffers from poor service delivery and defect repetition. A key problem impeding the widespread adoption of emerging technologies is the lack of competent contractors to support the effectiveness of the technology implemented in conventional methods and to ensure returns on investment. The shortcomings of conventional methods are assessed from the perspective of IBS buildings. This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes.Design/methodology/approachThis paper describes the establishment of key problem areas, the elements involved in implementing good practice and the requirements for integrating maintenance management processes and information databases in the maintenance management system.FindingsConventional methods have little emphasis on defect diagnosis tools. They also enhance inadequate strategic decision-making in the analysis of information when attempting to improve the maintenance project outcomes for IBS construction. The characteristics identified in a case study of IBS buildings are presented and analysed.Originality/valueThe conclusions and recommendations drawn from the analysis of the IBS case study are discussed, synthesised and deliberated upon. The approach presented in this paper integrates various aspects of building information modelling technology to facilitate improved execution of IBS maintenance activities.


2019 ◽  
Vol 17 (6) ◽  
pp. 1304-1322
Author(s):  
Sandra Matarneh ◽  
Mark Danso-Amoako ◽  
Salam Al-Bizri ◽  
Mark Gaterell ◽  
Rana Matarneh

Purpose The purpose of this study is to address challenges in the current information exchange process between building information modelling (BIM) and facilities management (FM) systems and to propose a workable solution. This study’s objective is to identify the information exchange requirements and to develop methods for seamless information flow between building information models and FM systems. Design/methodology/approach Data collection and analysis was based on an extensive literature review of similar studies followed by a questionnaire survey with a total of 112 participants and 2 focus groups with a total of 12 participants to validate the conceptual framework. The outputs of the survey analysis formed the background of the proposed framework to streamline information exchange process between building information models and FM systems. Findings The study findings form a foundation for enabling the integration of various data sources including building information models. Such integrated platforms will enable automated information exchange between the various data sources and FM systems. The study also provides key information requirements sources to complement the existing construction operations building information exchange information and to support standardization for information exchange process. Originality/value The contribution of this study is the identification of information exchange requirements and sources to enable seamless information flow between BIM and FM systems. The study findings will also lay the basis for research studies using the developed framework context to enable the identification of specific data outputs for FM systems inputs.


2015 ◽  
Vol 5 (3) ◽  
pp. 278-289 ◽  
Author(s):  
Peter E.D. Love ◽  
Jingyang Zhou ◽  
Jane Matthews ◽  
Chun-Pong Sing ◽  
Brad Carey

Purpose – The purpose of this paper is to present a systems information model (SIM) that is akin to a building information model (BIM) and can be used by asset managers and staff to make more informed and quicker decisions about maintenance. Design/methodology/approach – The problems associated with managing assets are examined alongside recent international efforts to standardize methods of data collection for meeting the objectives of owners. A case study in the domain of electrical, control and instrumentation (ECI) documentation is examined in detail, with particular reference to the amelioration of errors and omissions in “as built” drawings in order to provide the underlying foundation to support effective asset management (AM). Findings – The findings show that object oriented data models such as SIM provide a robust structure for effective and efficient AM and associated leverage of benefits throughout the entire facility lifecycle of a project. In particular object oriented data enables appropriate and reliable information to be created as a project progresses through its lifecycle, at little cost to the creators. Originality/value – The above special approach to enabling data collection at the point of creation is in alignment with recent Government initiatives such as Construction Operations Building Information Exchange, which are beginning to gather traction within the industry. While the potential benefits for AM of such systems are espoused throughout the industry, there are few successful examples in existence with measurable realization of benefits.


2017 ◽  
Vol 15 (1) ◽  
pp. 15-34 ◽  
Author(s):  
Olufolahan Oduyemi ◽  
Michael Iheoma Okoroh ◽  
Oluwaseun Samuel Fajana

Purpose The purpose of this paper is to explore and rank the benefits and barriers (technological and non-technological) of using Building Information Modelling (BIM) in sustainable building design. It also employs the use of a design tool analysis of a case study using BIM compatible tools (Ecotect and Green Building Studio) to determine the environmental performance of a proposed multi-use building at Derby North. Design/methodology/approach The paper explores the benefits and barriers of using BIM through a literature review. Regression and factor analysis were used to rank these benefits and barriers. A questionnaire was distributed to a sample of 120 practitioners with 69 completing the survey. Finally, the paper employs the use of a design tool analysis of a case study using BIM-compatible tools (Ecotect and Green Building Studio) to determine the environmental performance of a proposed multi-use building at Derby North riverside. Findings The key findings of the statistical analysis indicated that professionals ranked the integrated project delivery as the most established benefit, while the lack of interoperability was ranked the greatest technological challenge. Only three of the attributes of non-technological challenges made statistically unique contributions, namely, training costs and software costs, client demand and potential legal issues. It was also discovered that BIM delivers information needed for environmental performance. In a forward-looking approach, the paper attempts to provide some recommendations that would encourage the continuous application of BIM in sustainable building design. Research limitations/implications This paper does not cover all features of BIM functionality, as the scope of BIM is very enormous and the resources of this research were limited. Practical implications The implication of the study is that it will assist in exploring and ranking the benefits and barriers (technological and non-technological) of using BIM while proffering recommendations for future use. This research will be of interest to industry practitioners and academic researchers with an interest in building information modelling. Originality/value This paper contributes with new outlooks aimed at syndicating sustainability with environmental performance and adds to the limited empirical studies on the benefits and barriers of the application of BIM.


2020 ◽  
Vol 27 (9) ◽  
pp. 2409-2427
Author(s):  
Honglei Liu ◽  
Jiule Song ◽  
Guangbin Wang

PurposeWith the increasing attention acquired from researchers and practitioners in Architecture, Engineering and Construction (AEC) industry, building information modeling (BIM) has fundamentally changed the approach we design, construct and delivery, as well as operate and maintenance of buildings and civil infrastructures. This study tries to provide an innovative perspective on BIM research. This study aims to analyze the necessity and feasibility of BIM user satisfaction research and define what BIM user satisfaction is, and then to develop a quantitative method for the measurement of BIM user satisfaction.Design/methodology/approachAs it is indicated in the content, BIM user satisfaction is measured by the sum of the user's weighted reactions to a set of factors. To be specific, the entropy method was adopted to calculate the “weighting” of the factors, and the triangular fuzzy number (TFN) method was selected to compute the “scoring” of the factors. Through the literature review, methodology and tool development, as well as case study and discussions, this paper was generated sequentially.FindingsThis study found that the proposed tool for the measurement of BIM success is valid and reliable; it formerly translated the conceptual definition of BIM user satisfaction into an accurate measurement instrument. It also indicated that many factors are affecting the BIM users' satisfaction, and each of the factors inherited various importance and score, and the findings are expected to improve the performance and effectiveness of BIM management.Originality/valueThrough the translation of the conceptual BIM user satisfaction into a valid quantitative measurement instrument, this research provides an excellent framework for the management of BIM from the user's perspective, and it could help to stimulate user's acceptance of BIM in the AEC industry in future.


2017 ◽  
Vol 17 (1) ◽  
pp. 45-49 ◽  
Author(s):  
Steve Rowlinson

Purpose This paper aims to review the development of building information modelling (BIM) and integrated project delivery (IPD) in recent years and the process changes that BIM and IPD require. Design/methodology/approach A qualitative research methodology was applied which involved a comprehensive review of relevant literature leading to a better understanding of the history and development of BIM and IPD. A way forward is suggested for the future development of BIM and IPD. Findings The research revealed that the IPD approach is already ingrained within certain organisations and their supply chains. The issues of political will and business desire to change the existing procurement systems are examined. The need for fit with regional and national economic and cultural characteristics is a pre-requisite for successful change. Collaborative working, information exchange and trust only exist within the context of a trusted and reliable building information model that all can access, understand and manage. Originality/value This research pointed out that there is a need to overcome the institutional inertia that besets governments and their agencies and suggested that exemplar institutions and their projects are needed to lead the industry by integrating BIM into IPD through process change.


Author(s):  
G. S. Floros ◽  
G. Boyes ◽  
D. Owens ◽  
C. Ellul

<p><strong>Abstract.</strong> Modern cities pay particular attention to upscale their infrastructure systems in order to improve the every-day life of their citizens and lead the way towards a more sustainable environment. As part of this, they invest extensive funds in large infrastructure projects which are challenging to deliver as they require an e efficient communication among different professions, in order to share information efficiently throughout the lifecycle of the project, thus highlighting the importance of standardization to maintain consistency and integrity during data exchange. Building Information Modelling (BIM) aims to facilitate the above-mentioned requirements by describing the life-cycle of the project and Industry Foundation Classes (IFC) is the Standard for BIM that enables an efficient storage, management, exchange and visualization of information. However, there are two important challenges that need to be addressed: (i) IFC focuses particularly on buildings and provides limited support for infrastructure elements and (ii) the information exchange aims to describe mostly the construction phase; highlighting the lack of classes that refer to the operation and maintenance phase. Within this context, this paper proposes the extension of Industry Foundation Classes (IFC) for Asset Management in Infrastructure. A method is developed based on a case study of three highway entities: (i) retaining wall, (ii) gantry and (iii) bridge and a conceptual extension is presented. The results are further discussed and recommendations regarding future research fields are proposed.</p>


Sign in / Sign up

Export Citation Format

Share Document