Managing new social procurement imperatives in the Australian construction industry

2020 ◽  
Vol 27 (10) ◽  
pp. 3075-3093
Author(s):  
Martin Loosemore ◽  
David Higgon ◽  
Joanne Osborne

PurposeThis paper responds to the need for more construction project management research in the emerging field of social procurement. It contributes by exploring the potential value of cross-sector collaboration and project-based intermediation in meeting new social procurement imperatives.Design/methodology/approachA thematic exploratory case study analysis is presented of seventy-three interviews undertaken with stakeholders involved in a unique project-based intermediary developed by a major Australian construction company to leverage the power of cross-sector collaboration in response to social procurement imperatives on its projects, based on semi-structured interviews with 33 disadvantaged job seekers, 40 organisational stakeholders (employment agencies; not-for-profits, Indigenous, disability and refugee support organisations; training organisations; subcontractors; government agencies and departments; community organisations) and observational and documentary data over the duration of a unique project-based intermediary called a Connectivity Centre, developed by a major Australian contractor to deliver on its emerging social procurement requirements.FindingsThe results show that cross-sector collaboration within the construction industry can produce highlight numerous cognitive, behavioural, health, situational and affective social impacts for the project community and shared-value benefits for the range of organisations involved. However, it is found that cross-sector collaboration through project-based intermediation in a construction context is challenging due to the fragmented and dynamic nature of construction project teams and the communities they have to engage with. Encouraging people and organisations to collaborate who operate in industries and organisations with different and sometimes competing institutional logics and objectives (even if they are linked by common values) requires a set of knowledge, competencies and relationships not recognised in current global project management competency frameworks.Originality/valueThis research contributes new insights to the emerging but embryonic body of research into construction social procurement by demonstrating the value of emerging theories of social procurement, social value, cross-sector collaboration and intermediation in enhancing our currently limited understanding of the complex challenges involved in responding to new social procurement requirements in the construction industry. It explores and documents the potential value of project-based intermediaries in developing and managing the new cross-sector relationships, roles, relational competencies and practices, which are required to effectively respond to and measure the impact of emerging social procurement policies in the construction industry. These findings have a potentially significant social impact by providing new insights for policymakers and the construction industry, to optimise the industry’s response to emerging social procurement policies.

2017 ◽  
Vol 17 (1) ◽  
pp. 90-111 ◽  
Author(s):  
Micael Thunberg ◽  
Martin Rudberg ◽  
Tina Karrbom Gustavsson

Purpose This study aims to identify and categorise common on-site problems from a supply chain management (SCM) perspective and to trace the origin of these problems in the construction project process, the supply chain or in the intersection between these processes. This allows for identification of how on-site problems affect SCM in construction projects and how they can be mitigated. Design/methodology/approach A literature review in combination with semi-structured interviews was used to identify on-site problems. This enabled triangulation and strengthened both construct validity and internal validity. Findings On-site problems can be categorised in one of the four following categories: material flows, internal communication, external communication or complexity. The first category has its origin in the supply chain, the second in the construction project process, the third in the supply chain-construction process intersection on site and the fourth in the construction project as a whole. The findings conclude that on-site problems often originate from construction companies’ lack of supply chain orientation. Research limitations/implications It is suggested that supply chain planning (SCP) can facilitate on-site problem mitigation in construction project management. This extends the body of knowledge of SCP in construction project management and supports the development of effective on-site construction project management. Practical implications The results show that SCP can aid construction project management in handling on-site problems earlier in the project process. Originality/value The main value lies in extending the body of knowledge in construction project management research by applying an SCM perspective and by introducing SCP to support more effective construction project management.


2014 ◽  
Vol 15 (3) ◽  
pp. 122-144 ◽  
Author(s):  
Susan Henczel

Purpose – The purpose of this paper is to provide an overview, including methodology and preliminary findings, of a current and ongoing doctoral research study of the impact of national library associations. The study uses the impact assessment framework provided by ISO16439:2014 Methods and procedures for assessing the impact of libraries. Design/methodology/approach – If the professional associations supporting the profession are to become sustainable we need to understand the difference they make to the individual members of the profession, to the employers of those individuals and to the profession of librarianship. This study applies the framework provided by ISO 16439:2014 to the national library association environment to explore and gather evidence of impact. To align with the ISO model, impact is differentiated into impact on individuals; social impact – institution (library or employing organization); and social impact – community (the profession). Preliminary findings show evidence of impact in all categories. Findings – Data were gathered through semi-structured interviews that were conducted with members of national library associations in Australia, New Zealand, the UK and the USA during the third quarter of 2013. Originality/value – This study contributes to research methodologies by testing the use of a qualitative assessment tool in a way that could be transferable to other associations both within and external to the library environment and to enable it to be adapted more broadly for other purposes within the library and information environment.


2018 ◽  
Vol 11 (3) ◽  
pp. 761-782 ◽  
Author(s):  
Shamil George Naoum ◽  
Carlos Herrero ◽  
Charles Egbu ◽  
Daniel Fong

Purpose It is axiomatic that construction is a fast-paced and competitive industry, which goes hand in hand with many construction professionals suffering from stress including construction project managers (C-PMs). The role of C-PMs is crucial to achieving project success as they are responsible for planning the project, organising human resources, controlling operations and the budget, and forecasting probable difficulties. The purpose of this paper is to investigate the causal relationships between stressors, stresses, stress-coping behaviours and their impact on the performance of C-PMs. Design/methodology/approach To investigate the relationships between stress and performance among C-PMs, a questionnaire was designed based on the extensive literature, and was sent to 150 C-PMs who had amassed at least five years’ direct working experience in the construction industry. A total of 44 completed questionnaires were returned. Correlation analysis and structural equation modelling were employed to understand the integrated relationships between these factors. Based on the data collected and analysis of the results, an integrated structural equation model of the stresses and performances of C-PMs was developed using AMOS version 22.0. Findings The results of structural equation modelling reveal the following: burnout is the type of stress that has the highest impact on the performance of C-PMs, being detrimental to their interpersonal performance (IPP) and positive for their organisational performance (OP), whereas physiological stress worsens the task performance of C-PMs and objective stress improves their IPP. The most active stressor towards the performance of C-PMs is “workgroup cooperation”, which has an impact on the IPP in a positive way but is detrimental to the OP. Career-developing environment, poor organisational structure and role conflict affect both stress and performance together. Originality/value This study provides a comprehensive investigation into the impact of various types of stress on the performances of C-PMs. The result constitutes a significant step towards the stress management of C-PMs in the dynamic and stressful construction industry.


2016 ◽  
Vol 23 (2) ◽  
pp. 134-157 ◽  
Author(s):  
Nicholas Chileshe ◽  
Raufdeen Rameezdeen ◽  
M. Reza Hosseini

Purpose – The purpose of this paper is to investigate and analyse the perceptions of South Australian construction practitioners on drivers affecting the implementation of reverse logistics (RL). In this context, RL is defined as the process of moving goods from their typical final destination for the purpose of capturing value or ensuring proper disposal. Design/methodology/approach – Semi-structured interviews were conducted with eight practitioners to collect data and the interview transcripts were analysed using the NVivo (version 10) package. Cluster analysis was used to cross-validate the findings and provide an in-depth insight into the findings. Findings – The findings indicate that most of the drivers identified in earlier research are relevant for the construction industry. In addition, the study identified some new drivers that are categorised as “targeted demands by an exclusive clientele”. These drivers were found to be complementary to the economic, environmental and social drivers as previously conceptualised. In addition, a set of factors affecting the strength of drivers that had been overlooked in previous studies emanated from the interview analysis. These include the type of project and the attributes of clients, both of which strongly affect the drivers of RL implementation in construction. Research limitations/implications – The major limitations are the relatively small size of the sample of interviewees and having interviewees from one geographic area with specific socio-economic characteristics. Practical implications – The identified drivers and the clustering of RL themes could be used by practitioners as a “road map” for the development of appropriate solutions to successfully promote RL within the construction industry. Organisational energies could thus be channelled towards the drivers that need the most improvement. Originality/value – The study contributes to this research sphere by employing cluster analysis to customise and contextualise the drivers that were previously identified. The study goes beyond the extant literature by discovering the prominent effects of these drivers on the impact of targeted demands by an exclusive clientele. This could be of great value in terms of creating avenues for future investigations on the topic.


2019 ◽  
Vol 9 (2) ◽  
pp. 3945-3948 ◽  
Author(s):  
M. H. Momade ◽  
M. R. Hainin

Motivation is one of the factors that influence productivity. Project management plays a vital role in the success of projects in Qatar construction industry (QCI). It relies profoundly on the team’s active participation and effective performance. Hence it is important to assess the impact of motivation and demotivation on performance. The main objective of this paper is to identify the key factors that cause motivation and de-motivation in QCI. Literature review, surveys with experts and semi-structured interviews were conducted to identify these factors. Using these factors to conduct specific motivational programs will help improve productivity in QCI. Research on motivational factors impacting productivity has not been conducted in Qatar before, so this work will provide insight on how to deal with productivity issues that QCI faces ahead of a major world event that Qatar will host in 2022.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Hemaid Alsulami ◽  
Suhail H. Serbaya ◽  
Ali Rizwan ◽  
Muhammad Saleem ◽  
Yassine Maleh ◽  
...  

PurposeIn a country like Saudi Arabia, where the construction industry is witnessing an impressive growth in the post-oil era, it is important to examine the occupational health and safety behaviors of construction workers (CWs).Design/methodology/approachThe present study aims to investigate the impact of emotional intelligence (EI) on workers' stress and safety behaviors. Data were collected from CWs (n = 265) at a major construction site in the city of Jeddah. Two questionnaires comprising 25 and 32 questions were used to measure their EI and stress levels, respectively. Furthermore, structured interviews were conducted with the managers and supervisors to inquire about the safety behavior of their respective workers. Descriptive statistics, simple and companion regression were used for data analysis.FindingsThe findings indicate that EI plays an important role to enhance the safety behaviors of the CWs besides reducing their workplace stresses. Furthermore, workers' stress levels are found to negatively impact their safety behaviors, indicating that any reduction in occupational stress can reciprocally enhance their safety compliance. The findings are further discussed with the concerned stakeholders to recommend a seven-point therapeutic role of EI for the safety of CWs.Originality/valueResults of the study can be used by managers and supervisors of the Saudi construction industry to reduce workplace accidents and improve the productivity of their organizations.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Muhammad Sami Ur Rehman ◽  
Muhammad Tariq Shafiq ◽  
Muneeb Afzal

Purpose The coronavirus disease 2019 (COVID-19) pandemic has affected the global economy and, thus, the global construction industry. This paper aims to study the impact of COVID-19 on construction project performance in the United Arab Emirates (UAE). Design/methodology/approach This study adopted a qualitative and exploratory approach to investigate the impact of COVID-19 and its policies on project performance in the UAE construction industry in critical areas of the project management body of knowledge (e.g. schedule, cost, resources and contracts). Semi-structured interview questions were asked from ten construction professional to obtain valuable insights into the pandemic’s effects on the UAE construction industry and the effectiveness of policies implemented to rectify the damage and identify the industry’s new normal. Findings The findings indicate that the construction industry faced several challenges such as schedule delays, disrupted cashflows, delayed permits, approvals and inspections, travel restrictions, serious health and safety concerns, material and equipment shortages, among others which hindered the timely delivery of construction projects. It also indicates that efforts made by the government institutions and the construction industry of the UAE such as economic support programs, digitization of processes, fee and fine waivers, health facilities, among other statutory relaxations proved effective in supporting the construction industry against the adverse effects of the pandemic. Research limitations/implications The research findings are limited to the literature review and ten semi-structured interviews seeking an expert’s opinion from industry professionals working in the UAE construction industry. The research team did not get access to project documents, contracts and project progress reports which may be required to validate the interview findings, and to perform an in-depth analysis quantifying the impact of COVID 19 on construction projects performance, which is a limitation of this research. Practical implications The implication is that, owing to the imposed lockdowns and strict precautionary measures to curb the rapid spread of the pandemic, smooth execution of the construction project across the country was affected. The government institutions and stakeholders of the construction projects introduced and implemented various techniques and solutions which effectively handled the implications of the COVID-19 pandemic on the construction industry of the UAE. Originality/value This study has identified the challenges faced by the construction industry of the UAE in the context of the management of project schedule, project cost, construction contracts, health and safety of construction employees and other related aspects of the construction projects. This study also identified the techniques and solutions adopted by various public and private institutions of the country and their implications on construction projects. Therefore, this study provides guidelines for policymakers and future research studies alike.


2018 ◽  
Vol 25 (3) ◽  
pp. 425-442 ◽  
Author(s):  
Jian Zuo ◽  
Xianbo Zhao ◽  
Quan Bui Minh Nguyen ◽  
Tony Ma ◽  
Shang Gao

Purpose The purpose of this paper is twofold: first, to identify the soft skills of construction project management; and second, to investigate the influence of these soft skills on project success factors in the Vietnamese construction industry. Design/methodology/approach A questionnaire survey was conducted with 108 project management professionals from the Vietnamese construction industry. Partial least square structural equation modelling was employed in data analysis. Findings Four-dimensional structure of project success factors was confirmed in this study. Results also showed that soft skills of project managers significantly contributed to project success factors and hence the project success. Research limitations/implications There may be geographical limitation on the conclusions drawn from the findings. Similarly, the sample size was still small, despite a relatively high response rate. In addition, the majority of the respondents were contractors and clients as other project players were reluctant to respond to the survey. Practical implications This study provides an understanding of the relationship between soft skills and project success factors. Originality/value Although there have been studies focused on soft skills of project management and project success factors, few have attempted to analyse the effects of these soft skills on critical success factors. Thus, this study adds significantly to the existing research on both project management skills and project success factors.


2020 ◽  
Vol 40 (3/4) ◽  
pp. 382-408
Author(s):  
Gianluca Scarano

PurposeThe purpose of this paper is to understand the impact of activation policies in contexts of public-oriented employment services.Design/methodology/approachThe fieldwork was conducted in Italy, using the regional case of Emilia-Romagna as a representation of public-oriented models. The empirical research relies primarily on quantitative research methods by means of impact evaluations based on very rich and recent administrative data that includes 20,014 observations. These are integrated with some interesting insights from qualitative research tools by means of semi-structured interviews with stakeholders in the fieldwork.FindingsThe overall level of effectiveness of activation policies does not seem to be particularly high. However, the results show that, to some extent, there are more advantages for job seekers furthest from the labor market. The stronger efforts made to assist those disadvantaged groups are probably related to a loss in the overall effectiveness of the system.Research limitations/implicationsThis analysis has focused on a substantially homogeneous and economically developed region. Indeed, Italian activation policy reforms have been implemented differently in different areas of the country. Similar to other Southern European countries, they are characterized by regional fragmentation and implementation gaps in activation policies.Practical implicationsThe findings of the present study are relevant to policymakers who deal with activation policies and to both public and nonpublic organizations involved in this field. It seems plausible to support the possibility that public-oriented models could represent a proficient alternative to proposals relying heavily on market-based interventions. Such evidence becomes particularly interesting in the aftermath of the Great Recession when this model is confronted with the consequences of the economic crisis.Originality/valueThe paper adds to the literature on public-oriented models, while overcoming some of the limitations of earlier research, which has been restricted mainly to cases with early traditions of marketized services.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Erica Hevellin da Silva Siqueira ◽  
Adriana Bin ◽  
Rachel Cavalcanti Stefanuto

Purpose The purpose of this study is to characterize output and impact evaluation initiatives from the perspective of entrepreneurs and investors of social enterprises (SE) by highlighting their relevance, implementation processes and consequences. Design/methodology/approach This study adopted a qualitative approach through a multiple case study. This study also analyzed ten SE in five areas and three investors, using semi-structured interviews, codification and content analysis. Findings Evaluation is still at an initial stage in these businesses, and there is a gap between what the field-specific literature proposes and what firms do. Although entrepreneurs feel that evaluation is essential to demonstrate their value and confirm their purpose and impact, it is not a priority. Research limitations/implications Due to the small number of Brazilian enterprises and investors, it is impossible to generalize the results. Practical implications The results are relevant to rethink strategies, processes and methodological tools that seek to portray, more realistically and reliably, the evaluation dimensions in SE. Social implications This study highlights the risk regarding the legitimacy of social impact ventures since, without the due causal inferences, it is not easy to prove the impact they claim to achieve. This situation conducts to the weakening of the ecosystem leading to the emptying of the term impact. Originality/value The main research contributions address the methodologies, practices and evaluation routines of some Brazilian SE and their investors, presenting the characteristics, perceptions and limitations of the studied ventures.


Sign in / Sign up

Export Citation Format

Share Document