Analysis of construction delay for delivering quality project in Bangladesh

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Md. Ikramul Hoque ◽  
Md. Abu Safayet ◽  
Md. Jewel Rana ◽  
Abu Yousuf Bhuiyan ◽  
Golam Sadmani Quraishy

PurposeConstruction delay is the most common issue and creates many adverse effects in any construction industry. This study has investigated the views of engineers, project managers and contractors on the causes of delay during a construction phase to identify potential delay factors, negative effects on project delivery and prioritize the delay factors.Design/methodology/approachAn extensive literature review and interview with construction stakeholders have been conducted to identify potential causes of construction delays and design a questionnaire survey. The final questionnaire was designed with 40 potential delay factors, and a total of 102 valid Bangladeshi construction stakeholders responded to it. The result was analyzed by the relative importance index.FindingsAmong the 40 delay factors, the top five most influencing delay factors are “delay in progress payments,” “rework due to mistakes during construction,” “lack of skilled labor,” “poor monitoring and control of activities” and “delays in the making of a decision.” The top five most damaging effects of delay are “time overrun,” “cost overrun,” “disputes,” “arbitration” and “litigation,” among ten negative effects of construction delay. All construction stakeholders believe that the owner-related, consultant-related and contractor-related groups are the first, second and third most important groups of delay factors.Originality/valueThe outcome of this study would enable the Bangladeshi construction industry to develop strategies to overcome delay factors and their harmful effects. By focusing on the outcome of this research and prioritizing the critical factors, the construction industry of Bangladesh will be able to minimize construction delay significantly and propagate the progress of the construction industry by delivering quality projects timely.

Author(s):  
Zayyana Shehu ◽  
Intan R. Endut ◽  
Akintola Akintoye

Purpose – The delivery of construction projects in Malaysia is plagued by time overruns, which turns what should have been successful projects into those incurring additional costs, or money-losing ventures; as well as leading to various other unexpected negative effects and faute de mieux situations. The purpose of this research is to assess those factors leading to time overrun in Malaysian construction projects. The perceptions of public and private sectors, contractors, clients, and consultants are compared relative to a list of factors derived from the review of extant literature in project delay. Design/methodology/approach – The research data were collected through an industry-wide questionnaire survey circulated across the Malaysian construction industry. The research develops a list of 84 time overrun factors. Responses were collected from 49 clients, 51 contractors, and 105 consultants, to explore and analyse the major factors that are responsible for causing time overrun based on sectors (public and private), organisations (clients, contractors and consultants) and professional roles. Findings – Project delays beyond contract dates are predominantly caused by contractors and are usually associated with financial factors. “Cash flow problems faced by the contractors” was found the major factor, which contributed to project delays, whereas “storage on site” was seen as the least significant factor. Practical implications – It is noteworthy that the findings in this research have a regional focus; it is, therefore, suggested that readers from other sections of the world exercise caution in applying the findings. As it is believed that every construction industry has its nature, culture and regulations, these factors can change as a result of such differences. Originality/value – This research provides stakeholders with information on factors, which, if properly understood, can make project delays less likely.


2020 ◽  
Vol 38 (7A) ◽  
pp. 1069-1076
Author(s):  
Layth T. Ali ◽  
Raid S. Abid Ali ◽  
Zeyad S. M. Khaled

Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


Author(s):  
Aly Elgayar ◽  
Salwa Mamoun Beheiry ◽  
Alaa Jabbar ◽  
Hamad Al Ansari

Purpose Over the past decade, the United Arab Emirates (UAE) introduced several green regulatory guidelines, federal decrees, and a considerable number of environmentally friendly initiatives. Hence, the purpose of this paper is to investigate the top green materials and systems used currently in the UAE construction industry as per the new laws dictate as well as see if professionals are switching over to incorporate more green materials, systems, and/or designs. Design/methodology/approach The work involved reviewing internationally popular green materials and systems for construction, developing a questionnaire based on the literature review, surveying professionals in the seven UAE emirates, and ranking the findings based on the relative importance index. Findings Findings found the top used green materials and system in the UAE’s construction industry. As well as identified that there is a communication gap between the design and implementation phases that is possibly hindering the use of more green materials and systems. Originality/value This study sets a baseline to measure the UAE’s progress over the coming years in terms of integrating more green construction materials, systems, methodologies, and trends.


2018 ◽  
Vol 16 (4) ◽  
pp. 413-428
Author(s):  
Charles Amoatey ◽  
Doreen Danquah

Purpose The purpose of this paper is to analyse project risks in Ghana’s real estate construction industry in terms of likelihood of occurrence, severity of impact and controllability. Design/methodology/approach A quantitative research approach was used in this study to address the research objective. The study population consisted project managers, architects, surveyors and contractors from 17 members of the Ghana Real Estate Developers Association (GREDA) in Ghana. Random stratified sampling technique was used to select 97 participants from these firms. A structured questionnaire was used to collect primary data, whereas descriptive statistics were used to present findings. Findings All risks identified have some level of likelihood of occurrence, extent of severity of impact and controllability. Market risks, technical risks and environmental risks are more likely to occur. Market risks, technical risks and environmental risks had the highest severity of impact. Financial risks, market risks, managerial risks and technical risks are the most controllable. Among all risks, environmental risks are the direst because they have high likelihood of occurrence and severity of impact but very low controllability. Real estate construction firms (developers) are therefore expected to prioritize remedy of environmental risks. Research limitations/implications The study is based on self-reported perception of project parties on the likelihood, severity of impact and controllability of real estate project risk factors. Firms outside of GREDA were not included in the survey. Therefore, generalisation of these risk factors for the entire construction industry should be done with caution. Practical implications The research results show that Ghanaian real estate developers are aware of the existence of the risks which impact on the performance of the industry. To effectively and efficiently manage these risk factors, project parties must understand the likelihood of occurrence, severity of impact and controllability of the risk factors, as well as individual firm’s responsibilities and capabilities to manage them. Such knowledge helps project managers to prioritise risks in managing them in the face of scarce resources. From an academic research perspective, the paper contributes to a conceptual risk assessment framework for the real estate industry. Originality/value The paper’s main contributions relate to the introduction of real estate construction sector-specific factors to project risk management modelling.


2017 ◽  
Vol 1 (1) ◽  
pp. 39-52
Author(s):  
Ibrahim Saidu ◽  
W Shakantu ◽  
A Adamu ◽  
I Anugwo

The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design to project completion. The argument on how to eliminate cost overrun has been on-going for the past 70 years as on-site wastage of materials leads to increase in the final project cost. This paper examines the relationship between the causes of material waste and those of cost overrun at the pre-contract and post-contract stages of a project. The desktop methodological approach was firstly adopted in comparing the causes of material waste and those of cost overruns from the literature, in order to determine the possible relationship. Subsequently, interviews were purposively conducted with construction professionals within Abuja, Nigeria, in order to verify the literature based information. The result reveals that all the causes of material waste also cause cost overrun at the pre-contract and the post-contract stages of a project. 96.88% and 81.81% of the causes of cost overrun also cause material waste at the pre-contract and post-contract stages respectively. Other causes which are not related are mostly, the micro-economic and macro-economic factors. These results are not different from those of the interviews conducted with professionals and summarised in the tick box. It was also found that to achieve Effective Construction Material Waste Management (ECMWM) for any construction project, material waste must be controlled at its sources and causes, and at different stages of a project. Based on these findings, it can be concluded that effective management of material waste would translate into a reduction in the level of project cost overrun. The study recommends that construction-project managers, as well as the construction practitioners should encourage the management of material-waste causes, as it has the potential to minimise cost overrun for projects. 


2018 ◽  
Vol 11 (3) ◽  
pp. 761-782 ◽  
Author(s):  
Shamil George Naoum ◽  
Carlos Herrero ◽  
Charles Egbu ◽  
Daniel Fong

Purpose It is axiomatic that construction is a fast-paced and competitive industry, which goes hand in hand with many construction professionals suffering from stress including construction project managers (C-PMs). The role of C-PMs is crucial to achieving project success as they are responsible for planning the project, organising human resources, controlling operations and the budget, and forecasting probable difficulties. The purpose of this paper is to investigate the causal relationships between stressors, stresses, stress-coping behaviours and their impact on the performance of C-PMs. Design/methodology/approach To investigate the relationships between stress and performance among C-PMs, a questionnaire was designed based on the extensive literature, and was sent to 150 C-PMs who had amassed at least five years’ direct working experience in the construction industry. A total of 44 completed questionnaires were returned. Correlation analysis and structural equation modelling were employed to understand the integrated relationships between these factors. Based on the data collected and analysis of the results, an integrated structural equation model of the stresses and performances of C-PMs was developed using AMOS version 22.0. Findings The results of structural equation modelling reveal the following: burnout is the type of stress that has the highest impact on the performance of C-PMs, being detrimental to their interpersonal performance (IPP) and positive for their organisational performance (OP), whereas physiological stress worsens the task performance of C-PMs and objective stress improves their IPP. The most active stressor towards the performance of C-PMs is “workgroup cooperation”, which has an impact on the IPP in a positive way but is detrimental to the OP. Career-developing environment, poor organisational structure and role conflict affect both stress and performance together. Originality/value This study provides a comprehensive investigation into the impact of various types of stress on the performances of C-PMs. The result constitutes a significant step towards the stress management of C-PMs in the dynamic and stressful construction industry.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Avirag Bajpai ◽  
Subhas C. Misra

PurposeThis research paper aims to analyze the critical barriers to implementing digitalization in the Indian construction industry as Indian construction companies are lagging in the implementation of digital technologies in the work environment.Design/methodology/approachIn this research paper, a qualitative research approach is adopted, and multiple detailed interviews are conducted with industry and academic experts. Further, multi-criteria decision-making (MCDM) techniques are used to finalize the prioritization among various alternatives. The fuzzy-decision-making trial and evaluation laboratory (Fuzzy-DEMATEL) and interpretive structural modeling (ISM) techniques are employed to find the exact relationship among the identified alternatives.FindingsThis study identifies 14 critical barriers from an extensive literature review and multiple interviews with industry professionals, and further driving and critical barriers are identified.Research limitations/implicationsIn this research paper, an exploratory study with a limited number of respondents from a large Indian construction company is carried out. Further, a detailed longitudinal analysis can be done to assess the subjectivity of the participants with more advanced statistical tools. However, this research discusses several points pertaining to the implementation of digitalization in the construction industry. The research further identifies the critical barriers to digitalization in the Indian construction industry.Practical implicationsThe finding of the study has two-pronged implications. First, it provides a road-map to the construction industry by highlighting the engagement of top management as the key focus area for successful digitalization. Second, the finding also shows similarity of the digitalization process to the adoption of process improvement techniques like lean and total quality management (TQM), wherein the top management plays a crucial role in ushering in the implementation of a disruptive change.Originality/valueThe research is unique in two ways. First, this is one of the very few attempts to understand digitalization in the Indian context. Second, the research also demonstrates that the combination of fuzzy DEMATEL and ISM techniques can be successfully employed in the emerging field of construction digitalization research.


2020 ◽  
Vol 27 (10) ◽  
pp. 3095-3113
Author(s):  
Lihui Zhang ◽  
Guyu Dai ◽  
Xin Zou ◽  
Jianxun Qi

PurposeInterrupting work continuity provides a way to improve some project performance, but unexpected and harmful interruptions may impede the implementation. This paper aims to mitigate the negative impact caused by work continuity uncertainty based on the notion of robustness.Design/methodology/approachThis paper develops a float-based robustness measurement method for the work continuity uncertainty in repetitive projects. A multi-objective optimization model is formulated to generate a schedule that achieves a balance between crew numbers and robustness. This model is solved using two modules: optimization module and decision-making module. The Monte Carlo simulation is designed to validate the effectiveness of the generated schedule.FindingsThe results confirmed that it is necessary to consider the robustness as an essential factor when scheduling a repetitive project with uncertainty. Project managers may develop a schedule that is subject to delays if they only make decisions according to the results of the deadline satisfaction problem. The Monte Carlo simulation validated that an appropriate way to measure robustness is conducive to generating a schedule that can avoid unnecessary delay, compared to the schedule generated by the traditional model.Originality/valueAvailable studies assume that the work continuity is constant, but it cannot always be maintained when affected by uncertainty. This paper regards the work continuity as a new type of uncertainty factor and investigates how to mitigate its negative effects. The proposed float-based robustness measurement can measure the ability of a schedule to absorb unpredictable and harmful interruptions, and the proposed multi-objective scheduling model provides a way to incorporate the uncertainty into a schedule.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Titus Ebenezer Kwofie ◽  
Clinton Ohis Aigbavboa ◽  
Wellington Didibhuku Thwala

Purpose The South African Construction Industry (SACI) in recent times has been characterized by a strong emphasis towards achieving sustainable building practices in infrastructural delivery. However, the lack of progress encountered in making gains in achieving sustainable practices has raised concerns over the effectiveness and understanding of the extent to which life cycle assessment (LCA) techniques may aid in meeting requirements of sustainable construction. Most efforts at LCA have been blighted with numerous barriers that have not been rigorously pursued and aggregated. Ironically, there is a lack of knowledge and understanding of the limitations and barriers to these methodologies, especially in the South African context. The purpose of this study is to delineate the cluster of barriers to the adoption of LCA methodologies in the SACI. Design/methodology/approach A questionnaire survey was carried out from a deductive research design elicit primary data based on the experience of purposively sampled stakeholders in LCA in the SACI on the extent they perceived the presence of well-established barriers in LCA adoption culled from the extensive literature review. Findings Through the use of factor analysis, three aggregated clusters of key barriers to LCA adoption in the SACI were identified, which were knowledge and enabling conditions constraints, cost and time constraints and technical constraints. The results confirm that indeed human and technical barriers have been notable in limiting gains in LCA adoption and achieving sustainable practices. Originality/value These findings are, thus, useful in overcoming challenges to LCA methodologies in achieving sustainable building practices in building and infrastructural delivery in SACI.


2014 ◽  
Vol 14 (4) ◽  
pp. 408-432 ◽  
Author(s):  
Wallace Imoudu Enegbuma ◽  
Uche Godwin Aliagha ◽  
Kherun Nita Ali

Purpose – This paper aims to investigate the relationship between building information modelling (BIM) adoption from the perspectives of people, process and technology to strategic information technology (IT) in construction mediated by collaborative processes for new BIM entrants. The demand pull for more effective project delivery in the construction industry across the globe has continued to transform design techniques from two-dimensional, three-dimensional (3D) and, currently, BIM. Leverage on IT is pivotal for construction industry development as earmarked by the Malaysian construction industry master plan. BIM uptake by stakeholders in Malaysia construction industry is on a gradual increase. BIM generates and manages building data during its life cycle via 3D, real-time, dynamic building modelling. Design/methodology/approach – BIM model is dependent on collaborative contribution by project teams’ input at various stages. However, challenges such as people, process and technology impede an effective adoption rate in Malaysia. This paper presents a continuation of an ongoing theoretical framework developed, to further investigate the relationship between BIM adoption from perspectives of people, process and technology to strategic IT in construction and collaborative process. To develop the framework, an extensive literature review on factors affecting BIM adoption was carried out. The underlining gap stems from a positivist standpoint in examining human – IT interaction. The model builds on conceptual technology acceptance models incorporating strategic IT implementation and collaborative processes in the industry. Findings – The paper examined factors affecting BIM adoption in Malaysia. The factors are further affected by the environment where BIM is utilised. The paper also presents the mediating effect of collaboration for new BIM entrants. Overall, the theorised hypotheses delineate the strength and significance of the examined relationship within the model. Subsequently, the data will be collected from construction industry professionals (architects, quantity surveyors, engineers and contractors) through the developed survey instrument. The hypotheses will undergo structural equation modelling to analyse the desired statistical power, test for close versus exact fit and complexity of the model. Social implications – The findings will delineate the variables with predominant impact on BIM adoption and serves as a guide to future policymaking on BIM implementation in Malaysia. Originality/value – Current research on BIM in Malaysia is limited to readiness and awareness. This paper extends the need for empirical findings from construction professionals’ perception of BIM. The findings also explain reasons for BIM adoption in new BIM entrants and add to current body of knowledge on IT acceptance model formation.