The optimization of pricing strategy for the wind power equipment aftermarket service

2019 ◽  
Vol 119 (3) ◽  
pp. 521-546 ◽  
Author(s):  
Lingcheng Kong ◽  
Ling Liang ◽  
Jianhong Xu ◽  
Weisi Zhang ◽  
Weijun Zhu

Purpose Although the wind power industry has been booming in China during the last decade, the development of wind turbine aftermarket service is still lagging behind, which seriously affects the operational efficiency of wind farms. If wind turbine manufacturers get involved in the aftermarket, the service pricing policy will impact the profits of both the manufacturer and the wind farm. Therefore, it is necessary to discuss an optimal service pricing strategy in the wind turbine aftermarket and design a method to improve electricity generation efficiency through service contract design. The paper aims to discuss these issues. Design/methodology/approach In order to decide the maintenance quantity and channel effort level, the authors design a normal Stackelberg game and an efficiency value-added revenue-sharing contract and discuss two kinds of revenue increment sharing models under situations, in which the supply chain’s leaders are the wind farm and the wind turbine manufacturer, respectively. Findings The results show that in either case, there exist optimal power generation revenue-sharing ratios that can maximize profit. At the same time, the authors outline an optimal service pricing policy, maintenance demand policy and channel service effort-level policy. The results summarize the influences of wind aftermarket services on wind farms’ and wind turbine manufacturers’ profit, which provides managerial insights into the process of manufacturing servitization. Practical implications The manufacturer’s channel effort level will influence the power generation increments very much, so the authors have developed a mechanism to stimulate the manufacturer improving the efficiency of aftermarket services. Originality/value Taking the power generation increment revenue as the profit increment function, the authors discuss the influence of service price on the profit increment of the wind farm and the wind turbine manufacturer and also consider the influence of service price on the wind farms maintenance quantity and wind turbine manufacturers channel effort level.

Energies ◽  
2021 ◽  
Vol 14 (8) ◽  
pp. 2319
Author(s):  
Hyun-Goo Kim ◽  
Jin-Young Kim

This study analyzed the performance decline of wind turbine with age using the SCADA (Supervisory Control And Data Acquisition) data and the short-term in situ LiDAR (Light Detection and Ranging) measurements taken at the Shinan wind farm located on the coast of Bigeumdo Island in the southwestern sea of South Korea. Existing methods have generally attempted to estimate performance aging through long-term trend analysis of a normalized capacity factor in which wind speed variability is calibrated. However, this study proposes a new method using SCADA data for wind farms whose total operation period is short (less than a decade). That is, the trend of power output deficit between predicted and actual power generation was analyzed in order to estimate performance aging, wherein a theoretically predicted level of power generation was calculated by substituting a free stream wind speed projecting to a wind turbine into its power curve. To calibrate a distorted wind speed measurement in a nacelle anemometer caused by the wake effect resulting from the rotation of wind-turbine blades and the shape of the nacelle, the free stream wind speed was measured using LiDAR remote sensing as the reference data; and the nacelle transfer function, which converts nacelle wind speed into free stream wind speed, was derived. A four-year analysis of the Shinan wind farm showed that the rate of performance aging of the wind turbines was estimated to be −0.52%p/year.


2019 ◽  
Vol 9 (6) ◽  
pp. 1184 ◽  
Author(s):  
Kuichao Ma ◽  
Jiangsheng Zhu ◽  
Mohsen Soltani ◽  
Amin Hajizadeh ◽  
Zhe Chen

For offshore wind farms, the power loss caused by the wake effect is large due to the large capacity of the wind turbine. At the same time, the operating environment of the offshore wind farm is very harsh, and the cost of maintenance is higher than that of the onshore wind farm. Therefore, it is worthwhile to study through reasonable control how to reduce the wake loss of the wind farm and minimize the losses caused by the fault. In this paper, the Particle Swarm Optimization (PSO) algorithm is used to optimize the active power dispatch of wind farms under generator cooling system faults. The optimization objectives include avoiding the further deterioration of the generator fault, reducing unnecessary power loss of the faulty wind turbine, tracking the power demand from the Transmission System Operator (TSO), and reducing the power fluctuation caused by the PSO algorithm. The proposed optimal power dispatch strategy was compared with the two generally-used fault-handling methods and the proportional dispatch strategy in simulation. The result shows that the proposed strategy can improve the power generation capacity of the wind farm and achieve an efficient trade-off between power generation and fault protection.


2017 ◽  
Vol 117 (2) ◽  
pp. 320-345 ◽  
Author(s):  
Ling Liang ◽  
Jiaping Xie ◽  
Luhao Liu ◽  
Yu Xia

Purpose The purpose of this paper is to discuss how wind farms attract wind turbine manufacturers to get involved in wind turbines’ maintenance service with revenue sharing contract of bundled service under which the background of operation and maintenance (O&M) aftermarket of wind turbine exists. The authors also try to extend the results to the application of product plus service business mode on large-scale equipment O&M service. At present, Chinese wind power industry is suffering from production capacity redundancy. The profit levels for both wind farm and wind turbine manufacturers are relatively low. It is significant for Chinese wind power industry development to coordinate the supply chain of wind power in order to reduce O&M costs and increase revenues. Design/methodology/approach The present paper discusses product plus aftermarket service contract design on the background of closed-loop product service chain and uncertain equipment demand using revenue sharing contract model. Findings If centralized decision making is assumed, the authors find that the wind turbine order increases as the aftermarket service effort level and aftermarket service profit increase; aftermarket service effort level is positively correlative to the service efficiency. On the other hand, if decentralized decision making is assumed, the wind turbine order increases as share of the aftermarket service chain by manufacturer to wind farm increases and share of product supply chain by wind farm to manufacturer decreases. The optimal effort level of wind farm increases as the share of aftermarket service chain increases while the optimal effort level of the manufacturer is a concave function of share of aftermarket service chain if service quality linear correlates with effort level. Meanwhile, the authors find that the revenues of the product supply chain and aftermarket service chain have a concave relationship. This relationship is not affected by the format of relationship between service quality and effort level (linear or exponential). Practical implications The results could potentially be used to provide the wind turbine manufacturer with a greater profit space and satisfy wind farm’s equipment maintenance demand at the same time. It can also guide the practice of revenue sharing in the aftermarket service and manufacturing servitization. Originality/value In this model, the authors assumed that both the forward revenue sharing of power generation by wind farm to manufacturer and the backward revenue sharing of maintenance service by the manufacturer to wind farm exist in closed-loop product service chain. Then the authors discussed channel coordination of such cross-revenue sharing contract.


2018 ◽  
Vol 15 (1) ◽  
pp. 86-90
Author(s):  
Muhammad Usman ◽  
Bilal Akbar ◽  
Sajjad Miran ◽  
Qazi Shahzad Ali

Purpose Wind energy has become a distinguished field of energy among the alternative energy resources. Despite economical disadvantages, the production of wind energy is desired to fulfill the demand of the energy. Low reliability is a big issue in the development of wind energy technology that has affected wind farm operations. The purpose of the study is to find the reason for the low reliability and high downtime for wind turbines. Design/methodology/approach The systems engineering approach has a high success rate in handling complex systems such as wind farms. A failure finding model is presented based on the systems engineering, with the focus to analyze the failures at the interfaces. The required data have been collected by reviewing the literature. Findings Gear box interfaces are a vital reason for the higher downtime and frequent failures of wind turbines, and the bearing and the lubricant in the gear box are affected because of their inappropriate combination. Originality/value The reliability and the maintainability of the wind turbine is a topic of major importance. The study is an attempt to contribute to a more sophisticated solution to the reliability problem of the wind turbine. Moreover, it shows the importance of interfaces in designing the complex systems.


2019 ◽  
Vol 21 (2) ◽  
pp. 745-754
Author(s):  
Otávio Augusto de Oliveira Lima Barra ◽  
Fábio Perdigão Vasconcelos ◽  
Danilo Vieira dos Santos ◽  
Adely Pereira Silveira

O Brasil é um país com uma extensa linha de costa, são cerca de 7.367 km de extensão do seu litoral, com um potencial natural para a geração de energia eólica. O estado do Ceará é um dos maiores produtores de energia eólica para o país, obtendo notoriedade e a necessidade de manutenção dos seus parques eólicos, especialmente se instalados em zonas de costa, onde há uma grande dinâmica natural. O presente trabalho, busca o acompanhamento das dinâmicas morfológicas na praia de Volta do Rio, localizada em Acaraú/CE, que fica a cerca de 238 km de Fortaleza/CE. Os dados coletados em idas à campo, constataram que há um forte processo erosivo atuante na praia de Volta do Rio, o que alerta para a contenção do avanço marinho sob o parque eólico presente no local. A erosão é um fenômeno natural que trabalha na modelação de demasiadas formas terrestres. No litoral, isso não é diferente, por ser um ambiente altamente dinâmico onde há a interação entre continente, atmosfera e oceano, sendo possível encontrar diversos atuantes que podem intensificar os processos erosivos, sejam eles o vento, maré, ou por intervenções humanas, como construções e ocupações indevidas ao longo da linha de costa.Palavras Chave: Volta do Rio; Energia Eólica; Erosão. ABSTRACTBrazil is a country with an extensive coastline, about 7,367 km of coastline, with a natural potential for wind power generation. The state of Ceará is one of the largest producers of wind energy for the country, obtaining notoriety and required maintenance of its wind farms, especially if located in coastal areas, where there is a great natural dynamic. The present work seeks the movement of morphological dynamics in the beach of Volta do Rio, located in Acaraú/CE, which is about 238 km from Fortaleza/CE. The data collected in the field found that there is a strong erosive process on the Beach of Volta do Rio, which warns about the expansion of advanced marine on the wind farm present on site. Erosion is a natural phenomenon that works in the modeling of many hearth forms. On the coast, this is not different, considering a highly dynamic environment in which there is an interaction between continent, atmosphere and ocean, being possible to find many factors that can intensify the erosive processes, such as wind, tide, or human intervention, as constructions and improper occupations along the coast line.Key words: Volta do Rio; Wind Energy; Erosion. RESUMENBrasil es un país con una extensa costa, cerca de 7.367 km de costa, con un potencial natural para la generación de energía eólica. El estado del Ceará es uno de los mayores productores de energía eólica del país, ganando notoriedad y la necesidad de mantener sus parques eólicos, especialmente si está instalado en zonas costeras, donde existe una gran dinámica natural. La presente investigación tiene como objetivo monitorear la dinámica morfológica en la playa de Vuelta del Rio, ubicada en Acaraú / CE, que está a unos 238 km de Fortaleza / CE. Los datos recopilados en los viajes de campo, encontraron que hay un fuerte proceso erosivo en la playa de Vuelta del Rio, que advierte sobre la contención del avance marino bajo el parque eólico presente en el sitio. La erosión es un fenómeno natural que funciona en el modelado de muchas formas terrestres. En la costa, esto no es diferente, ya que es un entorno altamente dinámico donde existe la interacción entre el continente, la atmósfera y el océano, permitiendo encontrar varios actores que pueden intensificar los procesos erosivos, ya sea viento, marea o intervenciones humanas, como edificios y ocupaciones inadecuadas a lo largo de la costa.Palabras clave: Vuelta del Río; Energía Eólica; Erosión.


Author(s):  
Xu Pei-Zhen ◽  
Lu Yong-Geng ◽  
Cao Xi-Min

Background: Over the past few years, the subsynchronous oscillation (SSO) caused by the grid-connected wind farm had a bad influence on the stable operation of the system and has now become a bottleneck factor restricting the efficient utilization of wind power. How to mitigate and suppress the phenomenon of SSO of wind farms has become the focus of power system research. Methods: This paper first analyzes the SSO of different types of wind turbines, including squirrelcage induction generator based wind turbine (SCIG-WT), permanent magnet synchronous generator- based wind turbine (PMSG-WT), and doubly-fed induction generator based wind turbine (DFIG-WT). Then, the mechanisms of different types of SSO are proposed with the aim to better understand SSO in large-scale wind integrated power systems, and the main analytical methods suitable for studying the SSO of wind farms are summarized. Results: On the basis of results, using additional damping control suppression methods to solve SSO caused by the flexible power transmission devices and the wind turbine converter is recommended. Conclusion: The current development direction of the SSO of large-scale wind farm grid-connected systems is summarized and the current challenges and recommendations for future research and development are discussed.


Energies ◽  
2021 ◽  
Vol 14 (1) ◽  
pp. 248
Author(s):  
Lorenzo Cottura ◽  
Riccardo Caradonna ◽  
Alberto Ghigo ◽  
Riccardo Novo ◽  
Giovanni Bracco ◽  
...  

Wind power is emerging as one of the most sustainable and low-cost options for energy production. Far-offshore floating wind turbines are attractive in view of exploiting high wind availability sites while minimizing environmental and landscape impact. In the last few years, some offshore floating wind farms were deployed in Northern Europe for technology validation, with very promising results. At present time, however, no offshore wind farm installations have been developed in the Mediterranean Sea. The aim of this work is to comprehensively model an offshore floating wind turbine and examine the behavior resulting from a wide spectrum of sea and wind states typical of the Mediterranean Sea. The flexible and accessible in-house model developed for this purpose is compared with the reference model FAST v8.16 for verifying its reliability. Then, a simulation campaign is carried out to estimate the wind turbine LCOE (Levelized Cost of Energy). Based on this, the best substructure is chosen and the convenience of the investment is evaluated.


2019 ◽  
Vol 141 (5) ◽  
Author(s):  
Alaa S. Hasan ◽  
Randall S. Jackson ◽  
Ryoichi S. Amano

It is desired, through this work, to investigate in detail the scenario that takes place behind a single wind turbine unit by focusing on three parameters; average axial wind velocity component, velocity deficit, and total turbulence intensity. The testing was done at mainstream velocity, U∞, of 5.2 m/s, u and v velocity components were captured by x-probe dual-sensor hot wire anemometer. A massive amount of point data was obtained, which then processed by a matlab script to plot the desired contours through the successive transverse sections along the entire length of the test section. By monitoring the previously mentioned flow parameters, the regions of low velocity and high turbulence can be avoided, while the location of the subsequent wind turbine is selected. The estimation of the distance, at which the inlet flow field will restore its original characteristics after being mixed through the rotor blades, is very important as this is the distance that should separate two successive turbines in an inline configuration wind farm to guarantee the optimum performance and to extract the maximum power out of the subsequent array of turbines. It is found that the hub height axial velocity recovery at six rotor diameters downstream distance is only 82%. This fact means that the power extraction out of the downstream turbine in an inline configuration wind farm is only 55% of the upstream turbine if the same free stream velocity and blade design are adopted.


2018 ◽  
Author(s):  
Sara C. Pryor ◽  
Tristan J. Shepherd ◽  
Rebecca J. Barthelmie

Abstract. Inter-annual variability (IAV) of expected annual energy production (AEP) from proposed wind farms plays a key role in dictating project financing. IAV in pre-construction projected AEP and the difference in 50th and 90th percentile (P50 and P90) AEP derives in part from variability in wind climates. However, the magnitude of IAV in wind speeds at/close to wind turbine hub-heights is poorly constrained and maybe overestimated by the 6 % standard deviation of annual mean wind speeds that is widely applied within the wind energy industry. Thus there is a need for improved understanding of the long-term wind resource and the inter-annual variability therein in order to generate more robust predictions of the financial value of a wind energy project. Long-term simulations of wind speeds near typical wind turbine hub-heights over the eastern USA indicate median gross capacity factors (computed using 10-minute wind speeds close to wind turbine hub-heights and the power curve of the most common wind turbine deployed in the region) that are in good agreement with values derived from operational wind farms. The IAV of annual mean wind speeds at/near to typical wind turbine hub-heights in these simulations is lower than is implied by assuming a standard deviation of 6 %. Indeed, rather than in 9 in 10 years exhibiting AEP within 0.9 and 1.1 times the long-term mean AEP, results presented herein indicate that over 90 % of the area in the eastern USA that currently has operating wind turbines simulated AEP lies within 0.94 and 1.06 of the long-term average. Further, IAV of estimated AEP is not substantially larger than IAV in mean wind speeds. These results indicate it may be appropriate to reduce the IAV applied to pre-construction AEP estimates to account for variability in wind climates, which would decrease the cost of capital for wind farm developments.


2016 ◽  
Vol 38 ◽  
pp. 477
Author(s):  
Thays Paes de Oliveira ◽  
Rosiberto Salustiano da Silva Junior ◽  
Roberto Fernando Fonseca Lyra ◽  
Sandro Correia Holanda

Wind energy is seen as one of the promising generation of electricity, as a source of cheap and renewable, is benefit to reduce the environmental impacts of the dam. Along with the hydroelectric networks, the energy produced by the wind will help to increase power generation capacity in the country. That from speed data and direction municipality Wind Craíbas in the corresponding period 2014 - 2015, estimated the wind potential of the region. The tool used in the treatment of the collected data was the Wasp, making simulations of three different levels of measurement, producing a fictitious wind farm with powerful wind turbine. With the model, WASP helps estimate the probability distribution of Weibull and scale parameters A and K. he predominant wind direction is southeast and the best wind power and intensity density levels took place in 70m and 100m high , with about 201 W / m² and 243 W / m² respectively. But when evalua ted the inclusion of fictitious wind farm, the best use happened at 100m tall with production around 73.039 GWh , which can be attributed this improvement to increased efficiency of the wind turbine used in the simulation.


Sign in / Sign up

Export Citation Format

Share Document