Extraction of underlying factors causing construction projects delay in Nigeria

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Christian Nnaemeka Egwim ◽  
Hafiz Alaka ◽  
Luqman Olalekan Toriola-Coker ◽  
Habeeb Balogun ◽  
Saheed Ajayi ◽  
...  

Purpose This paper aims to establish the most underlying factors causing construction projects delay from the most applicable. Design/methodology/approach The paper conducted survey of experts using systematic review of vast body of literature which revealed 23 common factors affecting construction delay. Consequently, this study carried out reliability analysis, ranking using the significance index measurement of delay parameters (SIDP), correlation analysis and factor analysis. From the result of factor analysis, this study grouped a specific underlying factor into three of the six applicable factors that correlated strongly with construction project delay. Findings The paper finds all factors from the reliability test to be consistent. It suggests project quality control, project schedule/program of work, contractors’ financial difficulties, political influence, site conditions and price fluctuation to be the six most applicable factors for construction project delay, which are in the top 25% according to the SIDP score and at the same time are strongly associated with construction project delay. Research limitations/implications This paper is recommending that prospective research should use a qualitative and inductive approach to investigate whether any new, not previously identified, underlying factors that impact construction projects delay can be discovered as it followed an inductive research approach. Practical implications The paper includes implications for the policymakers in the construction industry in Nigeria to focus on measuring the key suppliers’ delivery performance as late delivery of materials by supplier can result in rescheduling of work activities and extra time or waiting time for construction workers as well as for the management team at site. Also, construction stakeholders in Nigeria are encouraged to leverage the amount of data produced from backlog of project schedules, as-built drawings and models, computer-aided designs (CAD), costs, invoices and employee details, among many others through the aid of state-of-the-art data driven technologies such as artificial intelligence or machine learning to make key business decisions that will help drive further profitability. Furthermore, this study suggests that these stakeholders use climatological data that can be obtained from weather observations to minimize impact of bad weather during construction. Originality/value This paper establishes the three underlying factors (late delivery of materials by supplier, poor decision-making and Inclement or bad weather) causing construction projects delay from the most applicable.

2019 ◽  
Vol 27 (4) ◽  
pp. 917-935
Author(s):  
Elisabeth Viles ◽  
Natalia Carolina Rudeli ◽  
Adrian Santilli

Purpose The purpose of this paper is to perform a quantitative analysis of the literature in order to determine the main causes of delay in construction projects. Design/methodology/approach A set of 47 articles from the literature were analyzed, yielding 1,057 different causes of delay. In order to analyze and compare the main causes of delay, their degree of impact was studied statistically. Next, a mention count method was used to determine the primary causes of construction project delays and through the use of Pareto diagrams, the main causes of delays in construction projects were determined. Findings It was determined that the three main causes of construction project delay are problems that occur during execution, administrative problems and labor conflicts; together they account for almost 80 percent of the causes found in the literature. Moreover, it was deduced that problems during execution are based on unpredictable events, while administrative problems are rooted in poor cash flow management. In addition, seven sub-groups of delay causes were identified as being major due to the number of mentions detected. These were “Changes during construction,” “Poor construction management,” “Construction errors,” “Economic/Financial,” “Conflict/Relationship” and “Lack of experience.” Practical implications This study provides a unique classification method, which was successfully validated, for the causes of construction project delay. Thanks to the classification, designers may use this information as a starting point for designing future construction projects, thereby minimizing the appearance of unforeseen events during construction. Moreover, the results of this study will help project managers be aware of the possible causes of delay that may affect their construction projects. This understanding can help them identify potential risks in the initial phases of the project and allow decisions to be made early before problems arise or the consequences of the deviations become irreparable. The results can also serve as input for the development of future management improvement methodologies that are aimed at reducing costs and ensuring that deadlines are met. Social implications Identifying the factors and causes of the delays will allow mitigation actions to be taken in order to avoid delays, which will ultimately allow homes, schools, hospitals and other necessary infrastructure to be delivered on time or even before the planned date. Originality/value This study provides a unique classification method that was successfully validated. Thanks to the classification, designers may use this information as a starting point for designing future construction projects, thereby minimizing unforeseen events during construction.


2019 ◽  
Vol 18 (3) ◽  
pp. 705-726
Author(s):  
Jeffrey Boon Hui Yap ◽  
Sin Yi Cheah

Purpose The purpose of this paper is to investigate the major challenges faced by Chinese international contractors (CICs) in the Malaysian construction industry. Design/methodology/approach An exploratory sequential mixed-methods research approach was adopted where following a detailed literature review and semi-structured interviews with local professionals, 20 prevalent challenges experienced by CICs are identified. Subsequently, a questionnaire survey was used to elicit the views of 100 construction practitioners. Descriptive statistics were used to prioritise the challenges, while exploratory factor analysis was conducted to uncover the underlying factors. Findings The five most crucial challenges identified relate to: changes of regulation, cost control, contract clauses, language barrier and quality control. Exploratory factor analysis revealed four major underlying dimensions of these challenges, in connection to financial and government policy management, organisational performance management, supplier relationship management and cross-cultural management. Research limitations/implications The challenges are considered primarily involving CICs in the context of Malaysia; further work can be extended to Western or other East Asian, such as Japanese and Korean, international contractors undertaking construction projects in Malaysia or selected developing countries around the region. Practical implications This study will benefit professionals involved with China-backed construction projects in countries sharing demographics and socio-economic characteristics akin to Malaysia. The outcome of the study is expected to facilitate project managers to devise proactive risk-mitigation measures to reduce the impact of these challenges and to improve project delivery. Originality/value The paper examined the challenges faced by CICs in the Malaysian context. This is a timely study, as China’s Belt and Road Initiative will provide considerable opportunities for Chinese companies in Malaysia.


2021 ◽  
Vol 11 (12) ◽  
pp. 5531
Author(s):  
Linlin Xie ◽  
Yajiao Chen ◽  
Ruidong Chang

Prefabricated buildings are the direction of the future development of the construction industry and have received widespread attention. The effective execution of prefabricated construction project scheduling should consider resource constraints and the supply arrangement of prefabricated components. However, the traditional construction resource-constrained project scheduling implementation method cannot simultaneously consider the characteristics of the linkage between component production and on-site assembly construction. It cannot also fully adapt to the scheduling implementation method of the prefabricated construction projects. It is difficult to work out a reasonable project schedule and resource allocation table. In order to determine the relevant schedule parameters that can reflect the actual construction situation of the prefabricated building and meet the scheduling requirements of the prefabricated project, this study proposes a prefabricated construction project scheduling model that considers project resource constraints and prefabricated component supply constraints. Additionally, it improves the design of traditional genetic algorithms (GAs). Research results of the experimental calculation and engineering application show that the proposed project scheduling optimization model and GA are effective and practical, which can help project managers in effectively formulating prefabricated construction project scheduling plans, reasonably allocating resources, reducing completion time, and improving project performance.


2017 ◽  
Vol 10 (1) ◽  
pp. 5-31 ◽  
Author(s):  
Anna-Maija Hietajärvi ◽  
Kirsi Aaltonen ◽  
Harri Haapasalo

Purpose The effective management of inter-organizational integration is central to complex projects. Such projects pose significant challenges for integration, as organizations struggle with constantly changing inter-organizational interdependencies and must develop and adapt integration mechanisms to meet new demands. The purpose of this paper is to understand what kinds of integration mechanisms are used and how they are developed and adjusted during the infrastructure alliance projects. Design/methodology/approach This study provides empirical evidence of integration dynamics in project alliancing by analyzing two infrastructure alliance projects – a complex tunnel construction project and a railway renovation project. The research approach is an inductive case study. Findings This paper identifies integration mechanisms adopted in two case projects and three central triggers that led to changes in the integration mechanisms: project lifecycle phase, unexpected events and project team’s learning during the project. Practical implications Integration capability should be a precondition for alliance project organizations and requires the adoption of a wide range of integration mechanisms, as well as an ability to adjust those mechanisms in response to everyday dynamics and emergent situations. Originality/value Although unplanned contingencies and the responses to them represent important influences in organizations, there is limited amount of research on the dynamics of integration. The findings will be of value in supporting the management of inter-organizational integration in complex, uncertain and time-critical construction projects.


2016 ◽  
Vol 16 (3) ◽  
pp. 307-322 ◽  
Author(s):  
Hossein Karimi ◽  
Timothy R.B. Taylor ◽  
Paul M. Goodrum ◽  
Cidambi Srinivasan

Purpose This paper aims to quantify the impact of craft worker shortage on construction project safety performance. Design/methodology/approach A database of 50 North American construction projects completed between 2001 and 2014 was compiled by taking information from a research project survey and the Construction Industry Institute Benchmarking and Metrics Database. The t-test and Mann-Whitney test were used to determine whether there was a significant difference in construction project safety performance on projects with craft worker recruiting difficulty. Poisson regression analysis was then used to examine the relationship between craft worker recruiting difficulty and Occupational Safety and Health Administration Total Number of Recordable Incident Cases per 200,000 Actual Direct Work Hours (TRIR) on construction projects. Findings The result showed that the TRIR distribution of a group of projects that reported craft worker recruiting difficulty tended to be higher than the TRIR distribution of a group of projects with no craft worker recruiting difficulty (p-value = 0.004). Moreover, the average TRIR of the projects that reported craft worker recruiting difficulty was more than two times the average TRIR of projects that experienced no craft recruiting difficulty (p-value = 0.035). Furthermore, the Poisson regression analysis demonstrated that there was a positive exponential relationship between craft worker recruiting difficulty and TRIR in construction projects (p-value = 0.004). Research limitations/implications The projects used to construct the database are heavily weighted towards industrial construction. Practical implications There have been significant long-term gains in construction safety within the USA. However, if recent craft shortages continue, the quantitative analyses presented herein indicate a strong possibility that more safety incidents will occur unless the shortages are reversed. Innovative construction means and methods should be developed and adopted to work in a safe manner with a less qualified workforce. Originality/value The Poisson regression model is the first model that quantifiably links project craft worker availability to construction project safety performance.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Masoud Zavari ◽  
Mohammad Reza Afshar

PurposeIn the construction industry, site managers are responsible for the day-to-day on-site running of a project. Site managers are required not only to ensure that work is done safely, on time, within budget and to the right quality standards, but also to manage any delays or problems encountered on-site during a construction project. Thus, a site manager has a significant position in the success of a construction project. However, there is a lack of studies considering the role of the leadership style of a site manager in construction project success. In this study, not only the effect of the transformational leadership (TL) style of site managers on the success of construction projects is assessed, but also the mediating role of team-building (TB) and team innovation between TL and project success is studied.Design/methodology/approachThe proposed hypotheses are tested by comparing the performance criteria of construction projects with the TL style of site managers. The success criteria of the projects are examined using project documents and client opinions, and the TL of site managers, TB aspects and team innovation in projects are assessed by asking from their subordinates. The Pearson correlation coefficient is employed to investigate the relation between every two variables.FindingsThe results illustrate that the TL of a site manager is directly related to project success; thus, the findings would confirm the importance of selecting appropriate site managers for construction projects. Moreover, while there is a mediating role of TB between TL and construction project success, team innovation does not have a mediating impact in design-bid-build (DBB) construction projects.Originality/valueAs there is a lack of studies assessing the TL effects on the success of construction projects and the significant role of site managers, this study is one of the first researches that tested these impacts and evaluated the mediating role of TB and team innovation between TL and project performance.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benviolent Chigara ◽  
Tirivavi Moyo

Purpose The purpose of this study was to investigate the perceptions of construction professionals relative to factors that affect the delivery of optimum health and safety (H&S) on construction projects during the COVID-19 pandemic. Design/methodology/approach The study adopted a quantitative design which entailed the distribution of a web-based questionnaire among construction professionals, namely, architects, construction/project managers, engineers, H&S managers and quantity surveyors working for contractors and construction consultants in Zimbabwe. The data were analysed with descriptive and inferential statistics. Factor analysis was used to reveal interrelated significant sets of factors affecting the delivery of optimum H&S. Findings Factor analysis revealed nine components/factors: change and innovation-related, monitoring and enforcement-related, production-related, access to information and health service-related, on-site facilities and welfare-related, risk assessment and mitigation-related, job security and funding-related, cost-related and COVID-19 risk perception-related factors as the significant factors affecting the delivery of optimum H&S during the COVID-19 pandemic in Zimbabwe. Research limitations/implications The results highlighted the need for social dialogue among construction stakeholders to support initiatives that will enhance the delivery of H&S on construction projects. Construction stakeholders may find the results useful in highlighting the areas that need improvement to protect workers’ H&S during the pandemic. However, the small sample limits the generalisability of the results to construction sectors in other regions. Originality/value The study investigated factors affecting the delivery of optimum H&S during the COVID-19 to inform interventions to enhance H&S.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Amirali Shalwani ◽  
Brian Lines

PurposeThe Project Management Body of Knowledge recommends the use of issue logs as a best practice to minimize the potential project cost and schedule growth. Although the broader topic of project control has been widely studied in the construction literature, the specific application of issue logs has remained relatively understudied. This study aims to analyze the extent and consistency with which construction teams utilize issue logs and the corresponding project performance outcomes.Design/methodology/approachA dataset of 5,635 individual issues was gathered from the final issue logs of 881 small building projects delivered via the design–bid–build method. Differences between groups were determined using the Kruskal–Wallis H test with post hoc testing via the Mann–Whitney U test with pairwise comparison.FindingsThe results showed that, on average, project teams who used issue logs to a greater extent achieved a 3.1 to 4.3% reduction in cost growth and a 5.3 to 12.3% reduction in schedule growth. This result shows that issue logs can be used to improve construction project performance in the areas of cost and schedule.Originality/valueThis result provides a contribution to practitioners, wherein project teams should be encouraged to establish their issue management practices early in the project schedule to encourage greater issue log usage for the remainder of the project.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohammed Azmy Ateia ◽  
Saneya Abdelfattah El Galaly ◽  
André de Waal

Purpose The purpose of this paper is to answer the research question “Is the high-performance organization (HPO) Framework suitable for non-governmental private sector organizations, specifically the affiliates of international companies operating in the ICT sector in Egypt?” Design/methodology/approach The research concerns a replication study in which the HPO Questionnaire was used to collect data, and factor analysis was applied to evaluate the reliability and consistency of the HPO Framework. The research approach was the same as applied by de Waal et al. (2016), but this time the research population consisted of affiliates of international ICT companies, instead of local ICT companies as in the de Waal et al. (2016) study. Findings Data gathered by means of the HPO Questionnaire from managers of these affiliates were used to evaluate the reliability and internal consistency of the HPO Framework. The confirmatory factor analysis was done twice, once for the original 35-characteristic HPO Framework and once for the 26-characteristic HPO Framework as proposed by de Waal et al. (2016) for Egyptian local ICT companies. The study results clearly show the applicability of the original 35-characteristic HPO Framework for measuring the organizational strength and identifying performance-gaps of ICT companies that are affiliates of international organizations operating in Egypt. Originality/value This study adds to the growing HPO literature on developing countries and helps Egyptian ICT companies to adopt high-performance practices to be able to contribute more to the economic development of Egypt.


2018 ◽  
Vol 25 (4) ◽  
pp. 497-533 ◽  
Author(s):  
Parvaneh Shahsavand ◽  
Akbar Marefat ◽  
Majid Parchamijalal

Purpose The purpose of this paper is to reveal the main causes of delays in the projects are from the client (relative importance index (RII)=0.716), labor and equipment (RII=0.701) and contractor (RII=0.698). Hence determining the contractual responsibility of delay is the most likely source of dispute in construction projects and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. Therefore, authors try to investigate all process-based techniques of delay claims and evaluated and conformed them with principles by Society of Construction Law (SCL) protocol and Association for the Advancement of Cost Engineering International (AACEI) in order to choose the best techniques based on the specific circumstances of each project. Design/methodology/approach This section is divided into two distinct parts: refers to the methods used to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in construction industry; and refers to advantages and disadvantages of various techniques used to analyze delays and their conform with SCL protocol. A questionnaire was developed to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in Iranian construction industry. The respondents were asked to indicate their response category on 78 well-recognized construction delay factors identified by authors. Findings In total, 78 causes of delay were identified through research. The identified causes are combined into seven groups. The field survey included 58 contractors, 55 consultants, and 62 client. Data collected were analyzed by RII and Statistical Package for Social Sciences (SPSS). The authors identified main causes of delay and ten most important causes, according to Table AII, from the perspective of three major groups of participants (clients, consultants and contractors). The ranking of categories of causes of delay, according to Table I, were: client-related causes (RII=0.716); labor and equipment category causes (RII=0.701); contractor-related causes (RII=0.698); material-related causes (RII=0.690); design-related causes (RII=0.666); external causes (RII=0.662); and consultant-related causes (RII=0.662). But according to the discussions and given that determining the contractual responsibility of delay is the most likely source of dispute in construction industry and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. Originality/value All process-based techniques of delay analysis have been present in this paper and categorized in 11 groups. In order to understand the advantages and disadvantages of them by clients, contractor and consultant, a thorough review conducted to reveal the nature of techniques. In the next step, given that selecting the most appropriate technique based on constraints and specific conditions of each project is one of the most important steps to carry out a successful delay analysis. The authors conformed, all process-based techniques of delay analysis, by SCL protocol and AACEI principles. Finally, the result of this match was brought in order to choose the best technique based on the specific circumstances of each project.