scholarly journals Investigation of Major Success Factors on Building Construction Projects Management System in Addis Ababa, Ethiopia

2017 ◽  
Vol 5 (3) ◽  
pp. 155 ◽  
Author(s):  
Mamaru Dessalegn Belay

The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


Author(s):  
Rakesh Sookoo ◽  
Abrahams Mwasha ◽  
Joseph Iwaro

One of the most important aspect of quality in a project is workmanship. Most contractors have failed in meeting stakeholders’ needs in the area of workmanship as it relates to the objectives of cost, quality and time. The lack of a workmanship management system in the construction process is one of the major problems facing the construction industry. In this regard, this study is aimed at developing an integrated benchmarking framework to measure workmanship performance of construction projects at any stage with focus on ensuring quality. To do so, the study undertakes a critical survey of literature and building professionals using mixed survey methods. It then uses the information gathered to develop an integrated workmanship benchmarking framework by integrating three major existing quality management techniques that include TQM, Six Sigma and SMS. This study successfully developed an integrated benchmarking framework with capability to measure the workmanship performance at both organization and project levels in any stage of construction projects. Also, the study identified a set of critical success factors for workmanship assessment and is expected to assist with and guide in the development of a workmanship performance assessment tool for the construction industry in developing counties including Trinidad and Tobago.


2020 ◽  
Vol 17 (2) ◽  
pp. 934-945
Author(s):  
Steven Anderson T. M. Rajagukguk ◽  
Yusuf Latief

The construction industry has an important role in the economic development of the country, especially developing countries. However, along with the increase in the construction sector, work accidents in the construction sector also increased. This accident has a negative impact on the project, such as loss of life, material, time, and others. The risk of workplace accidents can be prevented through a well-designed safety management system. The prevention of the workplace accidents can be done by identifying potential hazards that occur in each activity contained in the work breakdown structure (WBS). Identification of potential hazards is needed to be planned well so that the construction companies can take the best preventive action against any potential hazards that exist in each activity of the construction projects, so the safety performance can be improved. After the potential hazards have been identified, then the preventive actions are taken to control the hazards to minimize the safety risk rate. The implementation of safety programs requires costs. But there is no separate budget in this sector that make the implementation of the safety management is still not optimal. Thus, the financing of the safety management system was taken from the project budget, which led to a reduction in the profits of construction companies. This study aims to develop the cost of safety management system based on work breakdown structure on the building lower structure work. The results of this study are the standardized WBS of the lower structure of buildings, potential hazard sources in the lower structure of the building construction projects, the preventive action to each potential hazards in each activity, and finding the safety cost components based on work breakdown structure with the aim of improving the quality of the occupational health and safety management system and reducing work accidents in the building construction projects.


2018 ◽  
Vol 2018 ◽  
pp. 1-15 ◽  
Author(s):  
Yadi Li ◽  
Yan Ning ◽  
Wei Tong Chen

This study aims at identifying the critical success factors (CSFs) for safety management of high-rise building construction projects and exploring interactions among such CSFs. Study data were sourced from semistructured interviews and a questionnaire survey administered in China. The study constructs a third-order CSFs system containing six CSFs: management measures, management organization, technical and management plan, worker safety behavior, safety environment, and worker safety quality. Among these, management organization is found to be the key factor affecting construction safety management performance, while worker safety behavior is a factor with a direct impact. Implications for practice are proposed. This study enriches the existing literature on the CSFs and performance evaluation of construction safety management in high-rise building construction projects. Safety performance of high-rise building construction projects can be effectively enhanced by improving the professional competence of safety management organizations.


2019 ◽  
Vol 8 (2) ◽  
pp. 4-9
Author(s):  
Abdurezak Mohammed Kuhil ◽  
Neway Seifu

The time overrun in construction projects has become one of the most common problems in the industry that cause multitude of negative effects on the projects and its stakeholders. This study focused on assessing the main causes of delay in public building construction projects in Addis Ababa Administration mainly undertaken by grade one contractors. In these projects, 42 delay causing events in the Addis Ababa public building construction projects were identified and categorized in to five main category groups, and the most important and critical causes of public building construction delay causing factors were evaluated and ranked based on the RRI(Ranking and computation of relative importance index)values from the data collected in a questionnaire survey of three groups of respondents- clients, consultant and contractors in the construction industry. The survey findings revealed the top ten factors that cause construction delays in the public building construction projects in Addis Ababa are: (1) Difficulty in project financing (poor financial system); (2) Poor Project management system;(3) Delay in issuance of designs and working drawings; (4) Shortage of availability of imported construction materials and goods on market; (5) Design errors and complexity of designs;(6)Delay in progress payments for completed works; (7) Late start & resource mobilization to site; (8) Financing problems; (9) Inaccurate Site investigation Report;(10) Price Inflation. Furthermore, the ranking of the factors tested the agreement among the respondents and finally agreement test reveal that there appears a positivecorrelation between the groups in noticing and ranking the set of delay causes. The study recommended in general and particularly to all the parties for mitigating factors causing time overrun.


2020 ◽  
Vol 4 (1) ◽  
pp. 37-46
Author(s):  
Siti Maharah Abdul Khalim ◽  
Chia Kuang Lee

The number of construction activities nowadays increased rapidly due to urbanization and economic growth. The increased number of construction activities will cause adverse effects and huge impacts on the natural environment, and integrity of the construction process. Compared to the other industries, it is far behind in the implementation of the Environmental Management System (EMS). This paper aims to investigate the success factors of the implementation of EMS in the construction industry. EMS introduced several control strategies with proper management to address environmental issues caused by construction activities. This study reviewed some of the past studies related to EMS, construction industry, and also sustainable development in construction projects. EMS helps in minimizing environmental impacts by providing a framework that supports a construction company through reliable control. EMS integrates environment management into the company’s long term planning, daily operations and other quality management system.


2022 ◽  
Vol 28 (1) ◽  
pp. 33-51
Author(s):  
Ghasaq abdulsalam Fadhil ◽  
Abbas M. Burhan

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at crisis management, specifically in the basic stages chosen for its development, which are before, during, and after a crisis. Therefore, an effective crisis management system has been developed consisting of 20 critical success factors with devising 59 actions that can be taken for each proposed criterion for each of the three stages of crisis.


Sign in / Sign up

Export Citation Format

Share Document