scholarly journals Contractor Selection Criteria: a Study on Malaysian Public Construction Projects

2018 ◽  
Vol 7 (3.25) ◽  
pp. 65
Author(s):  
Izwan Rashid ◽  
Syuhaida Ismail ◽  
Zainai Mohamed ◽  
Abd. Latif Saleh

The complexity of a construction project renders the implementation of a systematic approach in selecting contractors to be of vital importance, especially for the public construction projects. Nevertheless, public construction projects in Malaysia often suffer from delay, over budget and low-quality issues. These are very much affected by the contractors who tend to manipulate the tender price with the sole intention of getting the contract, thus led to many issues throughout the projects delivery. Hence, this paper is aimed to investigate a list of contractor selection criteria for public construction projects in Malaysia. A total of 43 selection criteria have been identified and categorised into seven categories from an initial review via content analysis. These findings were then verified via a questionnaire survey, which was responded by 276 local Malaysian construction industry practitioners. Data collected were analysed using the IBM Statistical Package of Social Sciences (SPSS). The analysis showed that all 43 selection criteria were significant in selecting contractors. It is hoped that the findings of this paper would encourage the governing bodies and authorities to consider the use of multi criteria assessment in selecting contractors for public construction projects, rather than being solely reliant on the tendered price. 

2013 ◽  
Vol 4 (2) ◽  
pp. 34-39
Author(s):  
Ting Sim Nee ◽  
Chin Lin Wei

Construction contract refers to an agreement which in enforced by law; standard form is printed form of contract to define responsibilities to various parties involved to complete the construction works. Malaysian construction industry relies essentially on a number of standard forms namely the JKR Sarawak Form of Contract, PWD 203A, PAM, IEM and CIDB forms to execute its construction projects. However, with the number of choices available and without a clear selection guide, selection of an appropriate standard form for the particular projects has hinged on the familiarity of the form users with the particular form. This study aims to identify the selection criteria that can be used for standard form selection. The study form looks into the current practice and how decisions are made to select the appropriate standard form. Selection criteria are identified and this research carried out verification works with local construction industry players via questionnaire survey method. Results from questionnaire survey also indicated that standard forms are usually predetermined by the client in tender stage. It is also shown that some of the respondents have limited exposure to certain standard forms of contract. With the selection criteria identified, it is hopeful that a selection guideline can be developed.


Author(s):  
Mohammed Algahtany ◽  
Dean Kashiwagi ◽  
Kenneth Sullivan ◽  
Jacob Kashiwagi ◽  
Majed Alzara

Research has shown that public construction projects in Saudi Arabia have exhibited poor performance for the past three decades. Recent studies have identified the ownership of parties who cause risks and lead to low performance in the Saudi construction industry. These studies identified that contractors are not the main party that cause risks as owners, consultants, and other parties have the major share of causing risks in the industry. The aim of this study is to assess the current risk management and performance measurement practices applied by contractors to minimize risk out of their control (caused by other parties) through conducting a questionnaire survey. The questionnaire survey was sent to contractors who work in public construction projects in Saudi Arabia. The assessment included the contractors’ practices in the identification of projects activities and risks, contractors’ practices in mitigating other parties’ activities and risks, and contractors’ practices in measuring the performance of all project parties. The study identified that contractors’ current risk management and performance measurement practices are not effective in minimizing projects risks caused by other parties and ineffective in measuring performance of all parties. The study recommends a proactive risk management approach that can help contractors to minimize risks caused by other parties and can measure the performance of all parties in projects.


Author(s):  
Samiullah Sohu ◽  
Abdul Fattah Chandio ◽  
Kaleem ullah

The problem of delay in construction industry is a regular phenomenon worldwide, and construction industry of Pakistan has no exception, particularly in highways projects. Delay can be described as the extension of time to complete the construction project. The aim of this paper is to identify main causes of delays in highway projects of Pakistan, and to determine mitigating measures for the identified causes. The research method of this study is based on literature review, questionnaire survey and semi structured interview. From in-depth literature review, twenty-six common causes of delay were found. A questionnaire survey was carried out among construction professionals of highway projects. The causes of delay in highways projects were ranked referring to their Mean values. A semi structured interview was carried out to determine mitigation measures for the top ten causes of delays. The data gathered from questionnaire survey was analyzed using SPSS (Statistical Package for the Social Sciences) while, data collected through semi structured interviews was analyzed using Nvivo software. The findings of this study are expected to be useful for construction parties, to mitigate the delays in highway construction projects of Pakistan.


2013 ◽  
Vol 357-360 ◽  
pp. 2402-2405 ◽  
Author(s):  
Ying Mei Cheng ◽  
Jyun Yu Chen

The focus of this study is on the differences in quantity estimates made by BIM and a senior engineer using conventional method for materials needed during construction. BIM-Revit Architecture 2012 is utilized to establish the information for two actual cases the control room for a new construction and a single floor on a school campus to conduct estimates for the amount of reinforced concrete needed. For comparison, an engineer with considerable experience is also asked to perform the above estimate. Data from the two estimates are compared and the unit price obtained from the Public Construction Commission is applied to calculate the price difference. The result shows that in Case 1, the engineers estimate is higher than that of BIM by 1.33%, while in Case 2, the engineers estimate is higher than that of BIM by 0.30%. The results indicate that estimates made by BIM have high accuracy. Thus, applying BIM toward the construction industry may effectively reduce human errors such as omissions and miscalculations.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benti Gadisa ◽  
Hong Zhou

PurposeIt is well recognized that the construction industry is characterised by inefficient and ineffective service delivery due to various causative factors. Thus this study aims to examine the influential factors affecting public construction project performance in Ethiopia to improve the industry's service delivery.Design/methodology/approachFrom the extensive literature reviewed, 58 potential factors affecting construction project performance have been compiled. Based on the evidence accumulated, the conceptual model of this paper has been developed. By using survey questionnaires, valuable data were collected from the construction industry professionals in Ethiopia; analysed and interpreted with the use of both SPSS and AMOS software.FindingsIt is concluded that failure factors related to the “performance” of the contractor, the “capability” of the owner, the “project design-procurement process,” and project contract management can significantly contribute to the poor performance of public construction projects in Ethiopia. Ten key factors include inadequate contractor capacity, weak project site management and supervision, weak project management skills and capabilities of the owner, additional work orders, delayed payment, lack of comprehensive project plans between parties and incomplete project design, rising material prices, ineffective project schedules, and cost management, rising market prices and devaluation of the currency.Research limitations/implicationsThe scope of this study confined to public projects in Ethiopia. It suggests that further research needs to consider public and private construction from a comprehensive perspective in the developing countries.Practical implicationsIt provides practitioners with information and guidance on the factors that affect the performance of construction projects.Originality/valueIt provides inclusive evidence related to many factors that affect the performance of public construction projects.


Author(s):  
Vanissorn Vimonsatit ◽  
Alex Chai Mui Foo

This paper presents findings of an investigation into benefits of using Building Information Modelling (BIM) in construction projects. The research methodology includes a review of BIM development and achievement in construction industry, questionnaire survey, interview, and content analysis of secondary data. Data was collected and analyzed to identify the various benefits reflected from BIM implementation in addressing common problems experienced by the construction industry. The review and survey results indicate that a high frequency of occurrence of time and cost overruns occur in construction projects. Contributing factors were mainly rework, poor planning, documents delivery and approval, constructability issues, resources and weather condition. While some of the factors were unpreventable, BIM could be used as a tool to eliminate problems causing time and cost overruns. Various project benefits have been reflected through the content analysis of project case studies. It was found that time was the most positively influenced by the use of BIM followed by coordination, procurement, communication, cost and change of scope of the project, and lastly, risk.


2014 ◽  
Vol 548-549 ◽  
pp. 1587-1595
Author(s):  
Waled Alzober ◽  
Abdul Razak Yaakub

A complex or unstructured problem is based on multi criteria not on a single criterion. A contractor selection problem is a multi-criteria problem. A correct decision-making is required for selecting the appropriate contractor for a construction project. Selection of a contractor is a key decision made by clients and the process of selection a contractor has become an important issue in construction projects. Many multi-criteria techniques have been proposed and applied to such problems solution. This paper aims to propose integrated model for MCDM. The integrated model contains two stages. First stage integrates two MCDM methods are AHP and ANN to prepare a shortlist of the best alternatives. Second stage apply statistical model COP to choose the optimum alternative from the best alternatives in a shortlist. Proposed model for tendering system provides automated a decision-making process that reduces the time and manpower requirements for processing tender


Author(s):  
Hai Luong Nguyen ◽  
Tsunemi Watanabe

The public procurement sector plays a vital role in the economic development in developing countries such as Vietnam. However, public procurement activities usually perform poorly. This situation can be attributed to ineffective procedures and system (“hardware”) and human resource management (“software”), which occurs at every stage in project purchasing. The poor performance has reduced the effectiveness and efficiency of project delivery in the construction industry, causing delays, cost over-runs, and defects in construction projects. This paper, through working experience and observation by the first author, problems of public procurement were obtained as hypotheses and then validated based on questionnaire surveys and CIS (Construction Industry Structure) model analysis. The survey results indicated a relative correlation with CIS model in description of current construction industry. The study aims to identify issues of public procurement at all stages: pre bid, bid information, evaluation, and award. Based on identified major problems and determined risks, the results are expected to provide a valuable perspective, and thus, to propose necessary strategies to deliver high performance, competition and transparency for the public procurement. In further studies, it is relevant to propose a new model for sustainable public procurement based on the best value approach.


Author(s):  
Mohd Hilmi Izwan Abd Rahim ◽  
◽  
Sulzakimin Mohamed ◽  
Narimah Kasim ◽  
Mazianah Rahmat ◽  
...  

This nowadays an increasing number of construction projects in Malaysia have contributed to the production of construction waste which has had a negative impact on the environment, especially through illegal dumping. The increasing number of illegal dumping activities is a sign that construction waste management needs to be examined. To date, a comprehensive criterion for construction waste management, in developing countries is still not clearly defined. Therefore, the objectives of this paper are to investigate current illegal dumping activities, and identify the challenges towards reducing illegal dumping activities in the Malaysian construction industry. Hence, this research conducted interviews with 20 expert stakeholders related to construction waste management in order to scrutinise illegal dumping activities in Malaysia. The data from these semi-structured interviews were analysed by content analysis. The findings are used to determine the current challenges for reducing illegal dumping activities in the Malaysian construction industry. The elements in the current findings are potentially to improve construction waste management in order to archive the proper construction waste management. Finally, this findings will help to identify strategies to reduce illegal dumping activities and to enhance challenges towards reducing illegal dumping activities in the Malaysian construction industry.


Sign in / Sign up

Export Citation Format

Share Document