scholarly journals Selection Criteria and the Related Sub-Criteria for the Selection of Standard Form of Contract for Construction Projects in Sarawak

2013 ◽  
Vol 4 (2) ◽  
pp. 34-39
Author(s):  
Ting Sim Nee ◽  
Chin Lin Wei

Construction contract refers to an agreement which in enforced by law; standard form is printed form of contract to define responsibilities to various parties involved to complete the construction works. Malaysian construction industry relies essentially on a number of standard forms namely the JKR Sarawak Form of Contract, PWD 203A, PAM, IEM and CIDB forms to execute its construction projects. However, with the number of choices available and without a clear selection guide, selection of an appropriate standard form for the particular projects has hinged on the familiarity of the form users with the particular form. This study aims to identify the selection criteria that can be used for standard form selection. The study form looks into the current practice and how decisions are made to select the appropriate standard form. Selection criteria are identified and this research carried out verification works with local construction industry players via questionnaire survey method. Results from questionnaire survey also indicated that standard forms are usually predetermined by the client in tender stage. It is also shown that some of the respondents have limited exposure to certain standard forms of contract. With the selection criteria identified, it is hopeful that a selection guideline can be developed.

2018 ◽  
Vol 7 (3.25) ◽  
pp. 65
Author(s):  
Izwan Rashid ◽  
Syuhaida Ismail ◽  
Zainai Mohamed ◽  
Abd. Latif Saleh

The complexity of a construction project renders the implementation of a systematic approach in selecting contractors to be of vital importance, especially for the public construction projects. Nevertheless, public construction projects in Malaysia often suffer from delay, over budget and low-quality issues. These are very much affected by the contractors who tend to manipulate the tender price with the sole intention of getting the contract, thus led to many issues throughout the projects delivery. Hence, this paper is aimed to investigate a list of contractor selection criteria for public construction projects in Malaysia. A total of 43 selection criteria have been identified and categorised into seven categories from an initial review via content analysis. These findings were then verified via a questionnaire survey, which was responded by 276 local Malaysian construction industry practitioners. Data collected were analysed using the IBM Statistical Package of Social Sciences (SPSS). The analysis showed that all 43 selection criteria were significant in selecting contractors. It is hoped that the findings of this paper would encourage the governing bodies and authorities to consider the use of multi criteria assessment in selecting contractors for public construction projects, rather than being solely reliant on the tendered price. 


2014 ◽  
Vol 608-609 ◽  
pp. 210-215
Author(s):  
Zhen Yang Lv

as the reform of construction industry and construction management system in our country is continuously deepening, the management methods and organization structure on production had been deeply changed for enterprises in construction industry, which has gradually established a "modern enterprise system" and vigorously promoting "construction of project methods" on the construction management in construction works. In this paper, by reviewing and discussing the latest research results on construction safety management in and abroad, the key research content and subject focused in current safety management were proposed. Two management technical methods on safety objective management applicable to local construction projects were designed and improved. One is contractual safety responsibility method; the other is overall safety quality management method. The application effects were tested, analyzed and improved by using quantitative safety comprehensive evaluation method to achieve a systemic and scientific safety management theory system that is complete and practical.


2020 ◽  
Vol 18 (11) ◽  
Author(s):  
Roziha Che Haron ◽  
Ahmad Lutfil Arazmi

The practice of efficient and timely payment in construction projects is a major factor that can contribute to the success of a project. Delays in payment to subcontractor(s) by main contractor and client on construction projects in the Malaysian construction industry is considered to be a significant factor of concern. It causes severe cash flow problems to subcontractor(s) and this condition may lead to a devastating impact to the contractual payment chain. Withholding or delaying payment creates financial hardship for the construction companies and its impacts are sometimes so harsh that some companies have to close down their services. The research methodology adopted was the questionnaire survey analysis based on thirty (37) respondents from selected main contractors and sub-contractors in Gombak, Selangor. The data and information were also gathered from interviews analysis. From the research findings, among the factor of late payment from the client is payment withhold by the client. Meanwhile, the factor of late payment from the main contractor is when the term of “pay when paid” is applied. To improve the payment situation, the findings of this study suggest that there must be dedicated enforcing provisions for payment delay in contracts. This is proposed by introducing the standard form of contract clause regarding payment between the main contractor and domestic subcontractor which include levying charges on overdue payments.


2021 ◽  
Vol 14 (2) ◽  
pp. 62-70
Author(s):  
Huda Yaseen ◽  
Hafeth I. Naji

Construction projects are of a special nature affected by many factors, which makes them exposed to multiple risks that may lead to the abandonment of projects. Recently, the Iraqi construction sector is facing a number of problems. Abandoned construction projects are one of the most common and dangerous problems in the construction industry in Iraq, with their negative effects on stakeholders, the economy, and the environment due to the lack of sufficient financial and administrative capabilities to complete construction projects, which is reflected in exceeding the time limit for the completion of projects. The aim of this research is to use the analytic network process (ANP) technique to choose the best form of Public-Private Partnership (PPP) contracts to fund abandoned projects in Iraq. using a questionnaire survey to determine the most criteria and alternatives for selecting appropriate financing for the abandoned project. The results shown final weight of the Build-Own-Operate (BOO) contract from ANP is 0.533, which is the best form of PPP contract among the alternatives proposed to fund the project.


2021 ◽  
Vol 2 (4) ◽  
Author(s):  
Mansur Hamma-adama ◽  
◽  
Abdul-Basit Sa’eed Ahmad ◽  

Construction Industry is evolving amid the fourth industrial revolution. Transportation, commerce, manufacturing and many other industries ripened the current technological advancement and are striving to utilise every development in the IT sector. The procurement of construction works is known to be very conventional and backward in the adoption of digitalisation. The construction industry's procurement and supply chain are blamed for the most inflated cost of construction projects, mainly attributed to a lack of transparency and trust between the industry stakeholders. This research explores the challenges of E-procurement adoption in the industry and identifies the potential opportunities for its usage. This investigation's data are acquired through interviews, and the data are analysed using qualitative content analysis. This study reveals compounding challenges (i.e., corruption and lack of commitment) that lead to the failure of such efforts in Nigeria and the potential prospects (i.e., transparency and efficiency). This study is essential in developing a more effective and transparent process of procurement so that the Nigerian construction industry is not be left behind in the fast-digitalising markets.


In the Indian scenario construction industry facing a major problem is cost and time overrun. Effective time performance and cost performance are very important to execute the project in a successful manner by keeping them within the prescribed schedule and cost. Overall cost and duration of construction projects affected by the effective resource selection factor. This paper's objective is to rectify the improper selection of resources by a programming tool. Field survey and codebook study did collect the needed data to feed in the programming tool. The prepared tool gets distributed and making to access by every stakeholder of construction projects. This may result in the selection of construction resources as effectively. The term cost overrun in the resource part will be reduced.


Author(s):  
Samiullah Sohu ◽  
Abdul Fattah Chandio ◽  
Kaleem ullah

The problem of delay in construction industry is a regular phenomenon worldwide, and construction industry of Pakistan has no exception, particularly in highways projects. Delay can be described as the extension of time to complete the construction project. The aim of this paper is to identify main causes of delays in highway projects of Pakistan, and to determine mitigating measures for the identified causes. The research method of this study is based on literature review, questionnaire survey and semi structured interview. From in-depth literature review, twenty-six common causes of delay were found. A questionnaire survey was carried out among construction professionals of highway projects. The causes of delay in highways projects were ranked referring to their Mean values. A semi structured interview was carried out to determine mitigation measures for the top ten causes of delays. The data gathered from questionnaire survey was analyzed using SPSS (Statistical Package for the Social Sciences) while, data collected through semi structured interviews was analyzed using Nvivo software. The findings of this study are expected to be useful for construction parties, to mitigate the delays in highway construction projects of Pakistan.


2021 ◽  
Author(s):  
Michael Donn ◽  
Alexis Dykman ◽  
Nilesh Bakshi

This research investigates how contingency is currently calculated in project budgets within the building industry. This is an important aspect to consider as a large proportion of construction projects are significantly over-budget. The study presents three non-simulation methods and one simulation method for calculating cost contingency following the results of a forthcoming journal paper. These methods are applied against a case study project in attempt to highlight the most reliable method, and to create a methodology that will be useful to the industry. This paper identifies that the traditional fixed percentage approach is not sufficient and suggests that this could be one of the main reasons why construction projects are over budget. While it is unclear which method is the most reliable, this study provides a focus for future research into reliability and utilisation of contingency methods in the building industry. The research demonstrates that current practice needs to change to reduce the large number of construction projects that run over budget.


2018 ◽  
Vol 44 ◽  
pp. 00057
Author(s):  
Xeniya Malinina ◽  
Juriy Shamara ◽  
Zhanna Petukhova

In this article we carry out the analysis of the possible directions and consequences of transformations of the existing models for implementation of investment-construction projects in relation with integration of information technologies and the construction industry in modern Russia. Such integration is considered as the most useful tool to solve such chronicle problems of the construction industry as low quality of works, missed deadlines and sustaining the best ratio “price-quality” for the customer. The basis for such integration is the technologies of informational modeling of construction objects. We investigated two basic models: disintegrated purchases and integrated purchases whose transformation will be directed towards development of mechanisms of partnership between participants of investment-construction projects, expanded use of “integrated” contracts in the system of state purchases of construction works and further centralization of control in the system of construction for state purposes.


2019 ◽  
Vol 9 (1) ◽  
pp. 282-291 ◽  
Author(s):  
Michał Tomczak

AbstractOne of the key problems in managing the realization of a construction project is the selection of appropriate working crews and coordinating their activities in a way that ensures the highest degree of implementation of defined goals (minimizing the project duration and/or reducing downtime and related costs). Most of the existing methods of work harmonization used in construction industry allow obtaining the desired results only in relation to the organization of the processes realization in repetitive linear projects. In case of realization of non-linear construction objects or construction units, it is usually necessary to choose between the reduction of the project implementation time and maintaining the continuity of crews work on the units. It was found that there is a lack in the literature of developed method enabling harmonization of crews’ work, while minimizing the downtime at work and the duration of the entire project taking into account additional constraints, e.g. the need to not exceed the deadlines for the realization of the project stages.The article presents the concept of a multi-criteria optimization method of harmonizing the execution of non-linear processes of a multi-unit construction project in deterministic conditions. It will enable the reduction of realization time and downtimes in work, taking into account the preferences of the decision maker regarding the relevance of the optimization criteria. A mathematical model for optimizing the selection of crews and order of completion of units in multi-unit construction projects was also developed. In order to present the possibility of usage of the developed concept, an example of the optimal selection of crews and their work schedule was solved and presented. The proposed method may allow for better use of the existing production potential of construction enterprises and ensure synchronization of the crews employed during the work, especially in the case of difficulties in acquiring qualified staff in construction industry.