scholarly journals COST ESTIMATION PERFORMANCE IN THE CONSTRUCTION PROJECTS: A SYSTEMATIC REVIEW AND FUTURE DIRECTIONS

2021 ◽  
Vol 11 ◽  
pp. 217-234
Author(s):  
Mohammad Waffy Fazil ◽  
Chia Kuang Lee ◽  
Puteri Fadzline Muhamad Tamyez

Cost estimation in construction project is very critical for avoiding cost overrun in the project. This paper aims to provide a basis for improving cost estimation performance in construction through a systematic review of previous studies for last 31 years. The papers have identified a total of 238 construction cost estimation papers in 23 journals. Only 33 papers focused on factors influencing the performance of cost estimation. These papers were then analyzed, synthesized, and summarized in terms of the distribution across countries and citation influences. The factors of cost estimation performance were clustered to several themes with most of the factors in control themes. The factors in control themes are cluttered based on Organizational Control Theory (OCT). However, control themes provide less conceptual basis and dynamic to explain cost estimation performance and relationship among the factors. Therefore, this study reclassified other factors of cost estimation performance with reference to Contingency Theory (CT) and Task-Technology Fit Theory (TTFT). Hence, a new framework with relationship among the factors and cost estimation performance was developed. Further development and research of using the CT and TTFT frameworks were also discussed.

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Afiqah R. Radzi ◽  
Rahimi A. Rahman ◽  
Shu Ing Doh

Purpose Various approaches have emerged to assist practitioners in making more informed decisions in highway construction projects. However, industry practitioners are still using subjective ways to make decisions. Also, researchers have developed tools and techniques with similar objectives. Lack of information on what has been developed might lead to those issues. Therefore, this paper aims to review trends of evolution, pinpoint strengths and gaps in the literature and identifies potential future directions for decision-making research in highway construction projects. Design/methodology/approach A systematic review was conducted on published articles on decision-making in highway construction projects using the Preferred Reporting Items for Systematic Reviews and Meta-Analysis (PRISMA) technique. Findings The analysis of 101 articles revealed that existing decision-making research in highway construction projects targets improvements in four areas: feasibility, conceptual, detailed scope and detailed design. The four areas consist of sixteen subthemes that are detailed in this study. In addition, most research involved developing decision support tools and systems as well as decision-making models, techniques and frameworks. Lastly, several research areas have emerged, such as adding more decision criteria including those with uncertainties, expanding existing decision-making models into decision support systems, benchmarking decision criteria between different sample populations and exploring inter-and intra-relationships between decision criteria. Originality/value This paper provides an overview of existing research on decision-making in highway construction projects. Also, it reveals research gaps in the body of knowledge to point out directions for future research. Finally, industry practitioners can use the findings to develop strategies for effective decision-making processes.


2018 ◽  
Vol 24 (5) ◽  
pp. 1829-1844 ◽  
Author(s):  
Murat Gunduz ◽  
Omar Liqaa Maki

Cost overrun in construction projects is a common issue affecting project performance. After a review of the literature, a list of 39 cost overrun attributes were gathered and presented in a survey. The survey was distributed online to construction professionals. 101 complete responses were received and analyzed by importance index, frequency index, cost index, frequency adjusted cost index, Spearman’s rank correlation, student’s t-test, risk assessment and factor analysis. The results of the survey revealed that the main causes of cost overrun in construction industry include inaccurate cost estimation, improper planning and scheduling, unrealistic contract duration and requirements, frequent changes to the scope of work, frequent design changes, inadequate labor/skill availability, inflation on costs of machinery, labor, material and transportation.


2020 ◽  
Vol 38 (7A) ◽  
pp. 1069-1076
Author(s):  
Layth T. Ali ◽  
Raid S. Abid Ali ◽  
Zeyad S. M. Khaled

Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


Insects ◽  
2021 ◽  
Vol 12 (5) ◽  
pp. 391
Author(s):  
Marco A. Ponce ◽  
Tania N. Kim ◽  
William R. Morrison III

Microbes are ubiquitous and play important ecological roles in a variety of habitats. While research has been largely focused on arthropods and microbes separately in the post-harvest supply chain, less attention has been paid to their interactions with each other. Up to this point, there has been no attempt to systematically describe the patterns of behavioral responses by stored-product insects to microbially produced volatile organic compounds (MVOCs). Thus, our aims were to evaluate whether stored-product arthropods were primarily and significantly attracted, repelled, or had a net neutral effect (e.g., unaffected or mixed) by MVOCs presented as (1) complex headspace blends or (2) single constituents and known mixtures. In total, we found 43 articles that contained 384 sets of tests with different combinations of methodology and/or qualitative findings, describing the behavioral responses of 24 stored-product arthropod species from two classes, four orders, and 14 families to 58 individual microbial compounds and the complex headspace blends from at least 78 microbial taxa. A total of five and four stored-product arthropod species were significantly attracted and repelled by MVOCs across odor sources, respectively, while 13 were unaffected or exhibited mixed effects. We summarize the biases in the literature, including that the majority of tests have occurred in the laboratory with a limited subset of methodology and has largely only assessed the preference of adult arthropods. Finally, we identify foundational hypotheses for the roles that MVOCs play for stored-product arthropods as well as gaps in research and future directions, while highlighting that the behavioral responses to MVOCs are complex, context-, and taxon-dependent, which warrants further investigation.


2013 ◽  
Vol 2 (1) ◽  
Author(s):  
Katharina Felicitas Müller ◽  
Matthias Briel ◽  
Alexandra D’Amario ◽  
Jos Kleijnen ◽  
Ana Marusic ◽  
...  

2021 ◽  
Vol 20 ◽  
pp. 153303382110163
Author(s):  
Danju Huang ◽  
Han Bai ◽  
Li Wang ◽  
Yu Hou ◽  
Lan Li ◽  
...  

With the massive use of computers, the growth and explosion of data has greatly promoted the development of artificial intelligence (AI). The rise of deep learning (DL) algorithms, such as convolutional neural networks (CNN), has provided radiation oncologists with many promising tools that can simplify the complex radiotherapy process in the clinical work of radiation oncology, improve the accuracy and objectivity of diagnosis, and reduce the workload, thus enabling clinicians to spend more time on advanced decision-making tasks. As the development of DL gets closer to clinical practice, radiation oncologists will need to be more familiar with its principles to properly evaluate and use this powerful tool. In this paper, we explain the development and basic concepts of AI and discuss its application in radiation oncology based on different task categories of DL algorithms. This work clarifies the possibility of further development of DL in radiation oncology.


Sign in / Sign up

Export Citation Format

Share Document