scholarly journals Economic feasibility of Gluconacetobacter diazotrophicus in carrot cultivation

Revista CERES ◽  
2022 ◽  
Vol 69 (1) ◽  
pp. 40-47
Author(s):  
Nelson Ceballos-Aguirre ◽  
Gloria María Restrepo ◽  
Alejandro Hurtado-Salazar ◽  
Jorge Andrés Cuellar ◽  
Óscar Julián Sánchez
2018 ◽  
Vol 2 (3) ◽  
pp. 206-219
Author(s):  
Louay Qais Abdullah ◽  
Duraid Faris Khayoun

The study focused basically on measuring the relationship between the material cost of the students benefits program and the benefits which are earned by it, which was distributed on college students in the initial stages (matinee) and to show the extent of the benefits accruing from the grant program compared to the material burdens which matched and the extent of success or failure of the experience and its effect from o scientific and side on the Iraqi student through these tough economic circumstances experienced by the country in general, and also trying to find ways of proposed increase or expansion of distribution in the future in the event of proven economic feasibility from the program. An data has been taking from the data fro the Department of Financial Affairs and the Department of Studies and Planning at the University of Diyala with taking an data representing an actual and minimized pattern and questionnaires to a sample of students from the Department of Life Sciences in the Faculty of Education of the University of Diyala on the level of success and failure of students in the first year of the grant and the year before for the purpose of distribution comparison. The importance of the study to measure the extent of interest earned in comparision whit the material which is expenseon the program of grant (grant of students) to assist the competent authorities to continue or not in the program of student grants for the coming years.


2016 ◽  
Vol 4 (2) ◽  
Author(s):  
Marcela T Oliveira ◽  
Henrique C Sampaio ◽  
José N Salvador Júnior

Author(s):  
P. N. Vanyushin ◽  
A. V. Kuzin ◽  
А. А. Pavlov ◽  
А. V. Nefedov ◽  
N. А. Ivannikova

The article analyzes the current state of the irrigation and drainage systems of the Ryazan region. It is shown that the lack of technical operation of the drainage network led to its failure and failure to perform its functions. Irrigation, in spite of the fact that it gives stability in the years of droughts due to aging and the dismantling of machinery and equipment is not carried out. It is shown that for the reconstruction and / or modernization of irrigation and drainage systems it is necessary on the basis of inventory to determine the environmentally optimal and economically viable systems, their parts and structures that require rehabilitation, reconstruction and / or modernization. The decision to reconstruct may include not only the ameliorative system as a whole, but also some part of it, for example, a canal, pipeline or a separate hydraulic structure, taking into account the justification of economic feasibility. In dry periods, for the Meshcherskaya lowland and areas with peat soils, it is necessary to provide for land-reclamation systems for dual regulation of soil moisture, which reduces the possibility of peat ignition and the spread of fire. It should be borne in mind that the reconstruction of land-reclamation systems has its specific features, which include: socio-economic (increasing the productivity of agricultural land, obtaining additional income, creating modern infrastructure, increasing employment, living conditions, labor, etc.) ; ecological (creation of cultural landscapes, ensuring their ecological sustainability, prevention of land degradation processes, improvement of recreational conditions, elimination of waterlogging, flooding, salinization, erosion, etc.). Reclamation activities are carried out in compliance with the requirements of land, water, forestry legislation of the Russian Federation, as well as the legislation of the Russian Federation on the protection of the environment, on the subsurface, on the plant world and on the animal world.


2018 ◽  
Vol 2 (95) ◽  
pp. 69-72
Author(s):  
Yu.A. Tarariko ◽  
L.V. Datsko ◽  
M.O. Datsko

The aim of the work is to assess the existing and prospective models for the development of agricultural production in Central Polesie on the basis of economic feasibility and ecological balance. The evaluation of promising agricultural production systems was carried out with the help of simulation modeling of various infrastructure options at the levels of crop and multisectoral specialization of agroecosystems. The agro-resource potential of Central Polesie is better implemented in the rotation with lupine, corn and flax dolguntsem with well-developed infrastructure, including crop, livestock units, grain processing and storage systems, feed, finished products and waste processing in the bioenergetic station. The expected income for the formation of such an infrastructure is almost 8 thousand dollars. / with a payback period of capital investments of 2-3 years.


2017 ◽  
Vol 10 (1) ◽  
pp. 26-30
Author(s):  
E.Yu. Markova ◽  
◽  
O.V. Kurganova ◽  
L.Yu. Bezmel'nitsyna ◽  
N.A. Pron'ko ◽  
...  

1996 ◽  
Vol 34 (10) ◽  
pp. 141-149 ◽  
Author(s):  
J. P. Maree ◽  
G. J. van Tonder ◽  
P. Millard ◽  
T. C. Erasmus

Traditionally acid mine water is neutralised with lime (Ca(OH)2). Limestone (CaCO3) is a cheaper alternative for such applications. This paper describes an investigation aimed at demonstrating that underground mine water can be neutralised with limestone in a fluidised-bed. The contact time required between the limestone and the acid water, chemical composition of water before and after treatment, and economic feasibility of the fluidised bed neutralisation process are determined. A pilot plant with a capacity of 10k1/h was operated continuously underground in a gold mine. The underground water could be neutralised effectively using the limestone process. The pH of the water was increased from less than 3 to more than 7, the alkalinity of the treated water was greater than 120 mg/l (as CaCO3) and the contact time required between mine water and limestone was less than 10 min (the exact contact time depends on the limestone surface area). Chemical savings of 56.4% can be achieved compared to neutralisation with lime.


Sign in / Sign up

Export Citation Format

Share Document