scholarly journals Effects of The Digitalization of Contracts in The Public Procurement System

2021 ◽  
Vol 12 (4) ◽  
pp. 140-149
Author(s):  
Betal M. Bizhoev ◽  

The article is devoted to identifying the effects of digitalization of the public procurement system. The dominant tendency in the development of the procurement system is determined. A review of the individual elements of the public procurement system, which act as objects of digitalization, is carried out. The specific effects of the implementation of digital technologies are analyzed, contributing to the reduction of unfair, opportunistic behavior of customers, and as a result – a decrease in appeals, an increase in the level of transparency, and the availability of procurement. A comparative legal analysis of procurement legislation is carried out. The statistics of appeals to the antimonopoly service is considered. The conclusion about the reduction of transaction costs when transferring public procurement to digital format is substantiated. A conclusion is made about the digital transformation of the public procurement system, which consists in reducing the costs of their distribution and increasing the efficiency of using budget funds.

2018 ◽  
Vol 16 (2) ◽  
pp. 353-363 ◽  
Author(s):  
Bohdan Dmytryshyn ◽  
Ruslana Zhovnovach ◽  
Oleksandr Levchenko ◽  
Yurii Malakhovskyi ◽  
Viktoriya Gonchar

The issue of reforming the institute of state (public) procurement is one of the key directions of the modernization of the administrative sector of our state. Increasing the efficiency of this institute should be recognized as one of the conditions for ensuring stable economic growth. In this regard, issues relating to the assessment of the efficiency of the use of public funds are of particular interest. The indicators of the efficiency of the activity of the public procurement sector in Ukraine in the context of the introduction of the “ProZorro” electronic procurement system are calculated and analyzed. The existing works of the individual scientists in the direction of developing indicators of the efficiency that can be used to evaluate the results of the operation of the procurement logistics system in the public sector in Ukraine are generalized. As a result, approaches have been identified that can be used to determine the effectiveness of the participation of customers, private sector representatives and the system of electronic public procurement in general. On the basis of retrospective data of past years and the first half of the current year, a number of estimates of absolute and relative savings, as well as indicators of the effectiveness of the open bidding in the public sector of Ukraine have been identified. The dynamics of these indicators before and after the introduction of the “ProZorro” electronic procurement system was analyzed. The analysis shows that the first results of the functioning of the “ProZorro” system demonstrate the existence of negative trend of competition and reduction in the amount of savings in public funds. Ensuring high efficiency and competitiveness, integrity and transparency of the procurement process are the main tasks of the Ukrainian government in the field of public procurement. The authors argue that the introduction of the “ProZorro” system can help to solve them successfully, and the application of the analytics module enables to calculate the savings from the use of this system.


2020 ◽  
Vol 16 (5) ◽  
pp. 860-884
Author(s):  
V.G. Kogdenko ◽  
A.A. Sanzharov

Subject. The article deals with the analysis of suppliers in the public procurement system based on reasonable prequalification parameters. Objectives. The aim is to test the hypothesis about strong reputation characteristics of the winners in the public procurement system and develop a methodology for assessing the reputation of suppliers for prequalification purposes. Methods. We employ general scientific principles and methods of research, like abstraction, generalization of approaches used by domestic and foreign authors for prequalification and assessment of reputation of public procurement participants. Results. To test the hypothesis, we calculated four groups of indicators on corporate, financial, market, and social components of reputation. The methodology was tested on the data obtained from SPARK-Interfax and SPARK-Marketing information resources. Conclusions. The study revealed that not all reputational characteristics of public procurement winners can be regarded as high level. In terms of the corporate component, it is the low level of share capital, indicating the mistrust on the part of owners and their reluctance to invest in the business, and the low percentage of non-current assets. In terms of the market component, it is a low sales growth rate, as well as low return on sales. As to the financial component, it is a low capitalization of winners, low share of long-term debt capital and low credit limit. With respect to the social component, it is a below-average tax burden.


Author(s):  
Yernur Mukhtar ◽  
Yuri Toluev

The relevance of this research topic lies in the fact that public procurement requires in-depth consideration and comprehensive analysis, including the scientific and methodological level of analysis. The use of special legal documents in public procurement and the specific procedure for the execution of these documents is not a factor in the full understanding of this direction, including the economic assessment of the entire process. An economic and statistical approach using system analysis is required, which was used by the authors of the scientific article as the proposed research methodology. One of the main parts of the progressive process of commodity exchange in the economies of the analyzed countries is the mechanism for building public procurement. Currently, the problem of material and technical support of public needs in developed countries is solved as a result of logistics processes in the system of public procurement through the acquisition and supply of goods, works, and services, tangible and intangible resources. The article submits a review of foreign experience in building a public procurement system with special features characteristic of this region of the world, presented as an object of research. Country aspects in the object under study and allowed the authors to formulate the relevant main results and conclusions concerning various parties in the public procurement system, which determined the further strategy to improve the procurement system of the government and international integration union. Key words: public procurement (PP), regulation of the public procurement system, government orders, entrepreneurship, international regional institutions, regulation of the public procurement system, procurement, USA, European Union (EU), Poland, Germany, World Bank.


Author(s):  
Ahmed Alofi ◽  
Yasir Alhammadi ◽  
Dean Kashiwagi ◽  
Kenneth Sullivan

Saudi Arabia has had many issues in delivering mega construction projects, such as delays, high costs, and low customer satisfaction. Some studies show that around 70% of public projects in Saudi Arabia are delayed. One factor that might be causing these performance issues is the traditional low bid contracting system in Saudi Arabia, or the Saudi procurement system. In Saudi Arabia, owners select contractors based only upon the lowest price. This paper researched ways to modify the current Saudi procurement system and show quick and simple modifications that can be done to improve the low performance. This research proposes that by adding the clarification phase from the Performance Information Procurement System (PIPS) to the Saudi traditional procurement process could greatly improve construction performance. The clarification phase requires the selected contractor to submit a project scope, detailed and milestone schedule, potential risks that they do not control, and performance measurement before a contract is awarded. The PIPS system is one of the most successful systems around the world, which shows success rate of 98% in six different countries with risk and cost reduction up to 30%. The clarification phase has been identified as the most important step in the PIPS to ensuring a successful project. This paper conducted a survey among construction professionals in Saudi Arabia, including 157 engineers, 33 consultants 9 owners, 5 vendors, 13 academics, and 28 architects, in order to develop the public procurement system in Saudi Arabia. The participants work in government sectors with an interest in the Saudi Arabian procurement system. The survey confirmed that professionals in the Saudi construction industry believe that the procurement system should be changed and that the inclusion of the clarification phase to the procurement system is a way to improve the procurement system.


2019 ◽  
Vol 110 ◽  
pp. 02090 ◽  
Author(s):  
Elena Karanina ◽  
Ksenia Kartavyh

Every year, the volumes of funding in the sphere of provision of state and municipal demand increases significantly. Achieving the effectiveness of government contracts is one of the main and “eternal” problems of public funds management. For public procurement to be effective, it is necessary to meet the needs of the relevant actors, i.e. society, the state, and the private sector. In order to make a qualitative forecast of the results of public procurement placement, the development and implementation of measures aimed at improving the public procurement system, it is necessary to assess the current situation of manifestation of risks arising from the procurement of goods, works and services for state and municipal needs. For this purpose, a risk-based model for assessing the system of state and municipal procurement has been developed, which allows disclosing the nature of the risks of the procurement cycle fully and identifying a case scenario for choosing a way to loss minimization.


2013 ◽  
Vol 13 (1) ◽  
pp. 50-65 ◽  
Author(s):  
Mastura Jaafar ◽  
Nurhidayah Mohd Radzi

Since the declaration of Malaysian independence, the public sector has significantly contributed to the country’s development. In the 1990s, a new procurement system was developed due to CIBD various changes in the construction industry. Since that period, the poor quality of public sector projects has started to attract public attention. This paper describes a study that was conducted to identify the dominant public procurement systems in place, the problems associated with these systems, and the satisfaction level of the industry players in the Malaysian construction industry. The results were drawn from 84 survey responses and interviews with industry players. The public sector is using a traditional system inherited from the British, with an intention to adopt new procurement systems. Aside from the disputes that are present in most systems, the public sector seems to encounter particular problems in relation to capabilities, time, and cost of the major procurement systems used. Traditional work culture and the industry environment influence public sector practice, which accounts for the modifications of each procurement system used. Thus, the full advantages of using an alternative procurement system may not be realised in public sector organizations. This produces an average level of satisfaction gained from the procurement system adopted. As a developing country, Malaysia needs to exert significant efforts to improve the public procurement system. 